ML19322E635
| ML19322E635 | |
| Person / Time | |
|---|---|
| Site: | Summer |
| Issue date: | 11/20/1979 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mary Johnson SOUTH CAROLINA ELECTRIC & GAS CO. |
| Shared Package | |
| ML19322E630 | List: |
| References | |
| NUDOCS 8004020036 | |
| Download: ML19322E635 (2) | |
See also: IR 05000395/1979034
Text
r
_
_ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -
_
_
.
.
.
.
f Mhq%g
UNITED STATES
e
8
NUCLEAR REGULATORY COMMISSIOf.
o
'
g
,a
REGION il
%*****/[
o,
101 MARIETTA ST
N.W., SUITE 3100
ATLANTA, oEoRGIA 3o303
V
NOV 2 0197s
In Reply Refer To:
RII:WPA
50-395/79-34
South Carolina Electric and Gas Company
Attn:
M. C. Johnson, Vice President
Special Services and Purchasing
Post Office Box 764
Columbia, South Carolina 29218
Gentlemen:
,
This refers to the inspection conducted by W. P. Ang of this office on October 30
through November 1,1979 of activities authorized by NRC Construction Permit No.
CPPR-94 for the Virgil C. Summer Nuclear Station facility, and to the discussion
of our findings held with J. F. Algar at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
During the inspection, it was found that certain activities under your license
appear to be in noncompliance with NRC requirercuts.
This item and references
to pertinent requirements are listed in the Notice of Violation enclosed herewith
as Appendix A.
This notice is sent to you pursuant to the provisions of Section
2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regula-
'
tions. Section 2.201 requires you to submit to this office, within 20 days of
your receipt of this notice, a written statement er explanation in reply including:
(1) corrective steps which have been taken by you, and the results achieved; (2)
corrective steps which will be taken to avoid further noncompliance; and (3) the
date when full compliance will be achieved.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
80040so d8:2> 6
r-
y
.
.
,
,
l
South Carolina Electric and
-2-
- NOV 2 0 E7,
Gas Company
i
,
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
-
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of Violation
2.
Inspection Report No. 50-395/79-34
cc w/ enclosures:
T. B. Conners, Jr.
Conners, Moore and Corber
1747 Pennsylvania Avenue, N.W.
Washington, D.C.
20006
A. A. Smith
Quality Assurance
Post Office Box 8
Jenkinsville, South Carolina 29065
O. S. Bradham, Manager
Nuclear Operations
Post Office Box 8
Jenkinsville, South Carolina 29065
i
-
-