ML19322E635

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-395/79-34 on 791030-1101 & Notice of Violation
ML19322E635
Person / Time
Site: Summer 
Issue date: 11/20/1979
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19322E630 List:
References
NUDOCS 8004020036
Download: ML19322E635 (2)


See also: IR 05000395/1979034

Text

r

_

_ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ -

_

_

.

.

.

.

f Mhq%g

UNITED STATES

e

8

NUCLEAR REGULATORY COMMISSIOf.

o

'

g

,a

REGION il

%*****/[

o,

101 MARIETTA ST

N.W., SUITE 3100

ATLANTA, oEoRGIA 3o303

V

NOV 2 0197s

In Reply Refer To:

RII:WPA

50-395/79-34

South Carolina Electric and Gas Company

Attn:

M. C. Johnson, Vice President

Special Services and Purchasing

Post Office Box 764

Columbia, South Carolina 29218

Gentlemen:

,

This refers to the inspection conducted by W. P. Ang of this office on October 30

through November 1,1979 of activities authorized by NRC Construction Permit No.

CPPR-94 for the Virgil C. Summer Nuclear Station facility, and to the discussion

of our findings held with J. F. Algar at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirercuts.

This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regula-

'

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement er explanation in reply including:

(1) corrective steps which have been taken by you, and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

80040so d8:2> 6

r-

y

.

.

,

,

l

South Carolina Electric and

-2-

- NOV 2 0 E7,

Gas Company

i

,

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

-

C. E. Murphy, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-395/79-34

cc w/ enclosures:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N.W.

Washington, D.C.

20006

A. A. Smith

Quality Assurance

Post Office Box 8

Jenkinsville, South Carolina 29065

O. S. Bradham, Manager

Nuclear Operations

Post Office Box 8

Jenkinsville, South Carolina 29065

i

-

-