Nonproprietary Version of Memo Forwarding IE Insp Repts 50-280/69-08 & 50-281/79-08 on 691028-31 & 1114
ML19322D346
Person / Time
Site: Surry  Dominion icon.png
Issue date: 01/23/1970
From:
US ATOMIC ENERGY COMMISSION (AEC)
To: Boyd R
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19322D327 List:
References
FOIA-79-416 NUDOCS 8002110553
Download: ML19322D346 (1)


Text

,.-

g.

y

(

f'

~,

g

.a ATOMIC ENERGY COMMISSION i j

m. = %

M l

3>

\\

[*

me af.aJ

=

a y

.j R. S. Boyd, Assistant Director for Reactor Projects v=.i.

.i Division of Reactor Licensing (2)

  • j p-d VIRGINIA ELECTRIC AND POWER COMPANT-SURRY 1 AND 2 I

CO REPORT NOS. 50-280/69-8 AND 50-281/69-8

.s.

b The enclosed report of an inspection of the subject facilities on

~

  • October 28-31 and November 14, 1969, is Torwarded for information h

i l

h and possible action. The possible action item is included.in the

'~

last paragraph of this memorandum.

pf I

o e-The report describes a number of deficiencies that were identified on, h['

.~

the primary' system piping that was fabricated by Southwest Fabricating l

)

and Welding Company (SWF6WCO). The deficiencies were E ra"*A A"h fp

~

We will continue'l

_ %g.[

h j

a site receipt inspection by_ contractor personnel.

Oj to f ollow the resolution and/or disposition of th'is piping during the next inspection scheduled for February 1970.

'9 l We conducted an inspection of SWF6WCO on May 6-7, 1969, in conjunctio,n with the Diablo 1 facility, CO Report No. 275/69-5. At that time, we f

l 9

'j determined that a formalized quality assurance program had not been e,s-

,)

f I

l tablished. We plan to conduct a reinspection of SWF6WC0 during March 1970 because they are a major supplier of prefabricated piping for l

h both primary and engineered' safeguards systems at a numbe

'i p

pa under construction. This effort includes:

Qh i

/

J a.

Two contracts with Westinghouse, the first involving eight

- - plants with 25 loops, and 'the second 18 plants with 55 loops g

l with an option for four additional plants.

1 s

c(

8

.b.

One contract with General Electric for two plants.

,9 C

The report highlights a number of design problems in the electrical in-h l

strumentation area. The first problem is concerned with 'the installabic. g all electrical and instrumentation cable penetrations at a single loc'atiu

  • Ej in the containment. building. The installation appears to be contrarM to 3

}

, the requirements of the proposed "IEEE Standards for Nuclear Power P1' ant Protection Systems," Revision No. 8.

The licensee believes that the l 6

separations requirements can be satisfied by judicious

  • placing of cables. %

,j;-

The second item is concerned with the installation of the two battery f l

' i banks at one end of the same room with inadequate ventilation and on1'y h

.I<.,.

. s'eparated by an eight foot high concrete block wall. This installation Eff YO F/44 Pf/

afp w A~w~ U27a.<4f4l.aw/

"pr?gto wr ) awn S forJ J,r.m m,f*dny%y) 5? ""r*Pm;yg luptm/a.

%p.

v c

o gz spypy au.

a om -

3a awpaa c fens'.ntyQd%

W'7".Yrd.tp

~

o 1

..r

.m~v...........

. 2 A'*

.s#

O.Y-L

.