Text
_-___--_ _ - - _ .
_ _ _ _ _ _ - -
'
"
.
,
l
-
cM
UNITED STATES
N
r
5
)[4,
{
NUCLEAR REGULATORY COMMISSION
$
j
REGION ll
3
' C
230 PE ACHTR EE STR EET. N. W. SUITE 018
\\ . . . . . * '[
Aug 12 M
ATLANTA, GEO RGI A 30303
In Reply Refer To:
IE:II:CEA
50-269/76-7
50-270/76-7
50-287/76-7
Duke Power Company
ATTN:
Mr. William O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
422 South Church Street
Charlotte, North Carolina 28242
Gentlemen:
-
This refers to the inspection conducted by Mr. C. E. Alderson of this
office on July 12-16, 1976, of activities authorized by NRC Operating
License Nos. DPR-38, DPR-47 and DPR-55 for the Oconee Units 1, 2 and 3
facilities, and to the discussion of our findings held with Mr. J. Hampton
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examination of procedures and representative
records, interviews with personnel, and observations by the inspector.
Four new unresolved items resulted from this inspection and are identified
in Section III of the summary of the enclosed report. These items will
be examined during subsequent inspections.
During the inspection, it was found that certain activities under your
license appear to be in noncompliance with NRC requirements.
This
item and references to pertinent requirements are listed in Section I
of the summary of the enclosed report.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal
Regulations.
Section 2.201 requires you to submit to this office,
within 20 days of your receipt of this notice, a written statement or
explanation in reply including:
(1) corrective steps which have been
taken by you, and the results achieved; (2) corrective steps which will
be taken to avoid further noncompliance; and (3) the date when full
-
compliance will be achieved.
7912050
.
AUG 12 c*o
.
.
,
.
,
-
.
O
Duke Power Company
-2-
.
'In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter and
the enclosed inspection report will be placed in the NRC's Public
Document Room.
If this report contains any information that you believe
to be proprietary, it is necessary that you submit a written application
to this office requesting that such information be withheld from public
disclosure.
If no proprietary information is identified, a written
statement to that ef fect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
claimed to be proprietary.
The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
and referenced in the application since the application will be placed
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed in the
,
'
Public Document Room.
Should you have any questions concerning this letter, we will be glad to
discuss them with you.
Very truly yours,
i
F. J. Long, Chief
Reactor Operations and Nuclear
Support Branch
Enclosure:
IE Inspection Report Nos.
50-269/76-7, 50-270/76-7
and 5&287/76-7
i
ec:
J. E. Smith, Station' Manager
P. O. Box 1175
Seneca, South Carolina 29678