Discusses IE Insp Repts 50-269/77-19,50-270/77-19 & 50-287/77-19 on 770824-26.Noncompliance Noted Re Failure to Follow Procedures for Fuel Assembly Rotation
ML19322B670
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 09/26/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19322B666 List:
References
NUDOCS 7912040690
Download: ML19322B670 (2)


See also: IR 05000269/1977019

Text

_

. _ _

_. - . - . . . - ~ .

- - - - - - . -

- - - -

-

- -- - -'-

,.

-

.

'

c.

O.

'

[pn arcuq(o,

UNITED STATES ~

S

.

NUCLEAR REGULATORY COMMISSION

,

y(

) y,

g

REGloN 11

-N "

- r

230 PEACHTREE STREET, N.W. SUITE 1217

-*

f

'

ATLANTA, GEORGIA 30303

o

%.....}

SEP 2 61977

In Reply Refer To:

RII:JE0

50-269/77-19

50-270/77-19

50-287/77-19

Duke Power Company

Attn:

Mr. William O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

-

j

422 South Church Street

Charlotte, Nort.h Carolina

28242

-

Gentlemen:

.

This refers to the inspection conducted by Mr. J. E. Ouzts of this office

on August 24-26, 1977, of activities authorized by NRC Operating License

Nos. DPR-38, DPR-47 and DPR-55 for the Oconee 1, 2, and 3 facilities,

and to the discussion of our findings held with Mr. J. E. Smith at the

conclusion of the inspection.-

Areas examined during the-inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

During the inspection', it was found that certain activities under your

-

license appear to be in noncompliance with NRC requirements.

These

items and references to pertinent requirements are listed in the

enclosed Notice of Violation.

This notice is sent to you pursuant

to the provisions of Section 2.201 of'the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires

you to submit to this office, within 20 days of your receipt of this

notice, a written statement or explanation in reply including:

(1)

corrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice",

Part 2, Title 10,. Code of Federal Regulations, a copy of this '.stter

-

and the enclosed inspection report will be placed in the NRC's hblic -

.

m

.o 6M

o

--

_.

l

.

' -

-

. ... .

S-

,

-

Duke Power Company.

-2-

.

.

Document Room.

If this report contains any information that you (or

your contractor) believe to be proprietary, it is necessary that you

make a written application within 20 days to this office to withhold

such information from public disclosure. Any such application must

include a full star.ement of the reasons on the basis of which it is

claimed that the information is proprietary, and should be prepared

so that proprietary information identified in the application is

contained in a separate part of the document.

If we do not hear

from you in this regard within the specified period, the report

will be placed in the Public Document Room.

1

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

.

Very truly yours,

.

-

F. J. Long, Chief

Reactor Operations and

Nuclear Support Branch

Enclosures:

-

1. Notice of Violation

2. RII Inspection Report Nos.

50-269/77-19, 50-270/77-19

and 50-287/77-19

cc:

J. E. Smith, Station Manager

Oconee Nuclear Plant

P. O. Box 1175

Seneca, South Carolina