Discusses Insp Repts 50-269/73-01 on 721230,730117-19,30, 0202-05 & 26.No Noncompliance Noted
ML19322A897
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/15/1973
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A898 List:
References
NUDOCS 7911270653
Download: ML19322A897 (4)


See also: IR 05000269/1973001

Text

-__

- . .

-

.

.--

9

' #'# "'N

UNITED STATES

.D

q

ATOMIC ENER3Y COMMISSION

.cf;g ;

DIRECTORATE OF REGUIATORY CPERATICNS

,

g

y

accios n - suit a s's

g.

2m peacurner sracer. Noarweese

grarsi c

At i.4 wr 4, cecac. A xx3

..

, , _ , , , , , ,

, ,

In Reply Refer To:

MAR 151973

IO:II:RW

,

50-269/73-1

.

Duke Power Company

Attn:

Mr. A. C. Thies

Senior Vice President

Production and Transmission

Power Building

422 South Church Street

Charlotte, North Carolina

28201

.

Gentlemen:

This refers to the inspecon conducted by Mr. Warnick and others of this

office on December 30, 19',2, January 17-19, 30 - February 2, 5, and 26, 1973,

of activities authorized by AEC Construction Permit No. CPPR-33 for the

Oconee Unit 1 facility, and to the discussion of our findings held by

Mr. Warnick with Mr. Smith and other members of your staff at the conclusion

of the inspection.

Areas examined during this inspection are as described in the enclosed

inspection report No. 50-269/73-1. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with plant personnel, and observations by the

inspectors.

Within the scope of the inspection, no violations or safety items were

observed.

r

In accordance with Section 2.790 of the AEC's " Rules of Practice, Part 2,

Title 10, Code of Federal Regulations , a copy of this letter and the

,

enclosed inspection report will be placed a the AEC Public Document Poom.

If this report contains any information that you (or your contractors)

believe to be proprietary, it is necessary that you make a written appli-

cation within 20 days to this office to withhold such information from

public disclosure. Any such application must include a full statement of

the reasons on the basis of which it is claimed that the information is

proprietary, and should be prepared so that proprietary information identi-

fled in the application is contained in a separate part of the document.

n

.(\\

4911270 h53

Q

,.

__

-

_

.--

-

-

. _ _ . _ . _ , . _ . .

. . _ . _ . . . _ .

_.~.. .

.-..

-

4

.

.

NAR 15 573

- - -

r>2ks Power Company

-2-

.

If the report contains no information which you believe to be proprietary,

please inform us in writing within 20 days. to this effect. In such cases,

the report, as enclosed with this letter, will be placed in the Public

Document Room.

-

.

In regard to the item of noncompliance brought to your attention in our

letter, dated March 8,1973, pertaining to your welding program, please

be advised that this item is closed.

.

Should you have any questions concerning the matters discussed in this

letter, we will be glad to discuss them with you.

Very truly yours,

n

HC? h

- Y

Norman C. Moseley

Director

Enclosure:

Inspection Report No.

,

'

50-269/73-1

.

..

,