ML19322A698

From kanterella
Jump to navigation Jump to search
Inquiry Rept 50-269/72-04:on 720314,broken Piece of Piping Found in Steam Generator.Matl Part of Torn Thermocouple from B Generator.Extent of Damage Undetermined.Delay of Two or Three Weeks Expected
ML19322A698
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 03/14/1972
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19322A696 List:
References
50-269-72-04, 50-269-72-4, NUDOCS 7911210740
Download: ML19322A698 (2)


See also: IR 05000269/1972004

Text

_ . .

l

.

. .

...

,

U. S. ATOMIC ENERGY COMMISSION

REGION II

'

DIVISICIT OF COMPLIANCE

S

CO Inquiry Report No. 50-269/72 h

Subject: Duke Power Company

Seneca, South Carolina

License No.: CPPR-33

Facility: Oconee Nuclear Station Unit 1

Descriptive Title: Foreign Material in Reactor Coolant System

Prepared By: [I

  • d

3

h

' C. E. Mubphy, Resctor Inspector

Date

'

A.

Date and Manner AEC Was Informed:

Mr. J. E. Smith, Superintendent, Oconee Nuclear Station, advised the

inspector of the problem by telecon on March 14, 1972.

B.

Description of Particular Event or Circumstances:

Mr. Smith advised the inspector that on March 13, 1972, a " tinkling"

sound was heard in the top of the A steam generator. At the time, the

plant was at temperature and pressure for hot functional testing.

The plant was cooled down and the steam generator opened. A piece of

pipe approximately 3/4 inch to 1 inch in diameter and 10-inch length

was located. Three other pieces of =aterial, spherical in shape, were

also found. These objects were 1-1/2 inches to 2 inches in diameter.

One was cut open and found to be hollow inside. Smith was of the

opinion that they were also pieces of pipe. A preliminary inspection

of the tube sheet revealed that the ends of the tubes had been bradded.

.

The B steam generator was then opened up and it was found that the

thermocouple harness to be used in performance testing had been torn

loose. The extent of damage in this generator has not been determined .

as yet.

Smith stated that the reactor vessel is being opened a d the internals

removed to determine if there is foreign material in the vessel and if

damage has occurred here.

sen sio 790

~

~

~

.

. ' .

,?

-

,

2-

CO Inquiry Rpt. No.

-

50-269/72-4

,

C.

Action By Licensee:

The licensee's engineers and B&W engineers are enroute to the site to

make a full investigation and evaluation. Very preliminary estimates

indicate that a two-to-three week delay is involved.