ML19322A694

From kanterella
Jump to navigation Jump to search
Forwards Bulletin 72-02, Simultaneous Actuation of Safety Injection Signal on Both Units of Dual Unit Facility. Action Required
ML19322A694
Person / Time
Site: Oconee  
Issue date: 10/27/1972
From: Jennifer Davis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19322A656 List:
References
NUDOCS 7911210737
Download: ML19322A694 (1)


Text

_

UNITED STATES

'e W['

ATOMIC ENERGY COMMISSION y; 6 unu-x 1.

necios n - suite es 230 P E AC HT R E E $T R E E T. NoR T H n E'ST 7,gg,,,,g.

4ce s 52 e-4 Sc3

(

4T t ast 4. oconoi A scaos DIRECTORATE OF REGULATORY OPERATIONS In Reply Refer To:

October 27, 1972 RO:II:50-269,270,287 Dt$ke Power Company Atta: Mr. A. C. Thies Senior Vice President Production and Transmission Power Building 422 South Church Street Charlotte, North Carolina 28201 Gentlemen:

The attached Directorate of Regulatory Operations Bulletin No. 72-2,

" Simultaneous Actuation of a Safety Injection Signal on Both Units of a Dual Unit Facility," is sent to you to provide you with information we recently received from the Florida Power and Light Company concerning the Turkey Point 3 and 4 pressurized water reactors.

This information may relate to the design and performance of certain equipment at your facilities.

You will note in Section b. of the Bulle'.in that you are requested to respond to specific items.

,_,Very truly yours,

,r y

f f i

gTN /..-#

NhnG.' Davis E Director

Enclosure:

Bulletin 72-2

~

-.-.~.,...n-

~

.