Forwards IE Insp Rept 50-333/78-19 on 780919-22 & Notice of Violation
ML19322A203
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 11/08/1978
From: Brunner E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Leonard J
POWER AUTHORITY OF THE STATE OF NEW YORK (NEW YORK
Shared Package
ML19322A199 List:
References
NUDOCS 7901040249
Download: ML19322A203 (2)


See also: IR 05000333/1978019

Text

_ . _ _ .

6 -

__

. . _ _

-

-

.. , 4

V

/" D

UNITED STATES

t

NUCLEAR REGULATORY COMMISSION

ye

,r .

$

f'

S

REGION 1

s'

gj

sai PAan avsNuc

0,

Q

KING Off PRUSSI A, PENNSYLV ANI A 19406

%,

p

++...

8 NOV 1978

Docket No. 50-333

Power Authority of the State of New York

James A. FitzPatrick Nuclear Power Plant

ATTN: Mr. J. D. Leonard

Resident Manager

P. O. Box 41

Lycoming, New York 13093

Gentlemen:

Subject:

Inspection 50-333/78-19

This refers to the inspection conducted by Mr. T. Stetka of this office

on September 19-22, 1978, of activities authorized by NRC License No.

DPR-59 and to the discussions of our findings held by Mr. Stetka with

Mr. E. Abbott and other members of your staff at the conclusion of the

inspection.

Areas examined during this inspection are described in the Office of

Inspection and Enforcement Inspection Report which is enclosed with this

letter. Within these areas, the inspection consisted of selective

examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Based on the results of this inspection, it appears that certain of your

,

activities were not conducted in full compliance with NRC reauirements,

as set forth in the Notice of Violation, enclosed herewith as Appendix

j

A.

These items of noncompliance have been categorized into the levels

i

as described in our correspondence to you dated December 31, 1974. This

notice is sent to you pursuant to the provisions of Section 2.201 of the

NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within twenty (20)

days of your receipt of this notice, a written statement or explanation

in reply including:

(1) corrective steps which have been taken by you

and the results achieved; (2) corrective steps which will be taken to

'

avoid further items of noncompliance; and (3) the date when full comolience

will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10 Code of Federal Regulations, a copy of this letter and the

enclosures will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to

990 tov 6 zY1

_ _ _ - - _ _ _

,

_ _.

___._

._ _ ,.-_ _

._

.

.

.

.

.

' Power Authority of the State of

2

8 NOV 1978

New York

be proprietary, it is necessary that you make a written application

within 20 days to this office to withhold such information from public

disclosure.

Any such application must be accompanied by an affidavit

executed by the owner of the information, which identifies the document

or part sought to be withheld, and which contains a statement of reasons

which addresses with specificity the items which will be considered by

l

the Commission as listed in sutparagraph (b)(4) of Section 2.790.

The

information sought to be withheld shall be incorporated as far as possible

,

into a separate part of the affidavit.

If we do not hear from you in

this regard within the specified period, the report will be placed in

the Public Document Room.

Should you have any questions concerning this inspection, we will be

j

pleased to discuss them with you.

Sincerely,

j

,

e e. n - % k ;\\ e 68 k

Eldon J. Brunner, dhief

Reactor Operations and Nuclear

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Office of Inspection and Enforcement Inspection

Report Number 50-333/78-19

cc w/encls:

George T. Berry, General Manager and Chief Engineer

P. W. Lyon, Manager - Nuclear Operations

A. Klausmann, Director, Quality Assurance

M. C. Cosgrove, Quality Assurance Supervisor

J. F. Davis, Chairman, Safety Review Committee

L. R. Bennett, Assistant General Manager - General Counsel

G. M. Wilverding, Licensing Supervisor

l

.