Letter Sequence Other |
|---|
|
|
MONTHYEARML19320A8871977-06-0808 June 1977 Procedure for Fuel Handling Accident Inside Containment Project stage: Other ML19323D8641980-05-13013 May 1980 Submits Info Re Proposal for Permanent Type Repair of Containment Electrical Penetrations.Penetration Modules Which Have Experienced Insulation Resistance Degradation, Will Be Replaced Project stage: Other ML19320A8831980-06-0606 June 1980 Proposed Revisions to Tech Specs 3.9.4 & 4.9.4 Re Containment Electrical Penetrations Project stage: Other B10019, Application to Amend License DPR-65, Consisting of Proposed Revisions to Tech Specs Re Containment Electrical Penetrations.Procedure for Fuel Handling Accident Inside Containment Encl1980-06-26026 June 1980 Application to Amend License DPR-65, Consisting of Proposed Revisions to Tech Specs Re Containment Electrical Penetrations.Procedure for Fuel Handling Accident Inside Containment Encl Project stage: Request B10032, Application for Amend to License DPR-65,revising Tech Spec Door Numbers in Table 3.9-1 & Position of Certain Doors in Auxiliary Bldg During Fuel Movement in Spent Fuel Area or Crane Operation Over Spent Fuel Pool1980-07-10010 July 1980 Application for Amend to License DPR-65,revising Tech Spec Door Numbers in Table 3.9-1 & Position of Certain Doors in Auxiliary Bldg During Fuel Movement in Spent Fuel Area or Crane Operation Over Spent Fuel Pool Project stage: Request ML19320D3221980-07-31031 July 1980 Proposed Revisions to Tech Specs Table 3.9-1 Revising Door Numbers & Position of Certain Doors in Auxiliary Bldg During Fuel Movement in Fuel Storage Areas or Crane Operation Over Spent Fuel Pool Project stage: Other B10080, Corrects Typographical Error in Tech Spec Table 3.9-1 of Amend 60 to License DPR-65.Doors 292 & 297,listed as Servicing Solidification Sys Area,Should Be 292 & 2071980-09-22022 September 1980 Corrects Typographical Error in Tech Spec Table 3.9-1 of Amend 60 to License DPR-65.Doors 292 & 297,listed as Servicing Solidification Sys Area,Should Be 292 & 207 Project stage: Other 1980-06-06
[Table View] |
Proposed Revisions to Tech Specs Table 3.9-1 Revising Door Numbers & Position of Certain Doors in Auxiliary Bldg During Fuel Movement in Fuel Storage Areas or Crane Operation Over Spent Fuel Pool| ML19320D322 |
| Person / Time |
|---|
| Site: |
Millstone  |
|---|
| Issue date: |
07/31/1980 |
|---|
| From: |
NORTHEAST NUCLEAR ENERGY CO. |
|---|
| To: |
|
|---|
| Shared Package |
|---|
| ML19320D314 |
List: |
|---|
| References |
|---|
| TAC-7424, NUDOCS 8007210245 |
| Download: ML19320D322 (2) |
|
Text
(
1
~
DOCKET NO. 50-336 O
ATTACIDfENT 1 MILLSTONE NUCLEAR POWER STATION, UNIT NO. 2 PROPOSED REVISIONS TO TECllNICAL SPECIFICATIONS JULY, 1980 8007210.297 t
s
' August 1,1975
.w TABLE 3.9-1
-ACCESS DOORS TO SPENT FUEL P00L AREA
- Door No'.
Elevation Location Tjgyt Area Serviced
^
~
291:
14'6" M.7 18.5 Doubl e. Door SFP Skimmer System Doub e Door or 2
14'6" R/S' - 18.9 Solidification -System 0
g ))
293 14'6" Q/ R - 18.0
. Double Door Maintenance Shop 208' 14 ' 6" -
S - 18.9 16' Rollup Door Railway Access
~
294 14'6" Q - 20.7 Single Door D/G. Room i
295 38'6" F.8 - 18 8' Rollup Door Aux. & R. W. HVAC 296-38'6" F.8 - 18.5 Single Door Aux, & R. W. HVAC
,297 38'6" F.8 - 18.5 Singl e. Door North Stairwell l
l
- 38'6" H.4 - 18. 9 Double Sliding Door El evator 298
~38'6" M.4 - 18.9 Single Door Penetration Room
.299-
- 38'6" M.7 - 18.9 Doubl e - Door Main Exh. Fan Room 247-38'6" M.7 - 17 ?
Single Door South Stairwell 254 55'6" S - l'i.2 Single Door Roof Above Storage Floor 253 55'6" S --1,.9 Single Door Roof Above F. O. Tanks 8
i i-L MILLSTONE - UNIT.2 3/4 9-15 l
.