Proposed Revisions to Tech Specs 3.9.4 & 4.9.4 Re Containment Electrical Penetrations
ML19320A883
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/06/1980
From:
NORTHEAST NUCLEAR ENERGY CO.
To:
Shared Package
ML19320A881 List:
References
TAC-7424, NUDOCS 8007080169
Download: ML19320A883 (2)


Text

.,

. - _. =.,.

1..

~

i-DOCKET NO. 50-336 I

h t

E i.

ATTACHMENT 1.

r r

7..

p

'1

f..

MILLSTONE NUCLEAR POWER STATION, UNIT'NO. 2 c

1.-

I '

PROPOSED REVISIONS TO TECHNICAL SPECIFICATIONS f.

i s

?

t..

i

?

i. -_

4:

i.

4 J

L 1-4.,

f'.

i:

t.

i fs t-

..v.

I-i i'

13 4..

1 k

+..

t i

Y

[:

a

g 4:

t 1

y.

t

+,

i'

' JUNE, 1980 p

L

.......-..'w,..s,..::l_seoro e n 87

~

r,,,..

.m....,,.,..

.,_ m._,m

_,.. ~ _ _

i August 1, 1975 REFUELING 9PERATIONS CONTAINMENT PENETRATIONS LIMITING CONDITION FOR OPERATION 3.9.4 The containment penetrations shall be in the following status:

a.

The equipment door closed and held in place by a minitaum of four bolts, b.

A minimum of one door in each airlock is closed, and c.

Each penetration providing direct access from the containment atmosphere to the outside atmosphere shall be either:

1.

Closed by an isolation valve, blind flange, or manual

  • valve, or 2.

Be capable of being closed by an OPERABLE automatic containment purge valve.

APPLICABILITY: DURING CORE ALTERATIONS OR MOVEMENT OF IRRADIATED FUEL WITHIN THE CONTAINMENT.

ACTION:

With the requirements of the above specification not satisfied, ininedi-ately suspend all operations involving CORE ALTERATIONS or movement of irradiated fuel in the containment.

SURVEILLANCE REQUIREMENTS 4.9.4 Each of the above required ' containment penetrations shall be determined to be either in its isolated condition or capable of being closed by an OPERABLE automatic containment purge valve within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> prior to the start of and at least once per 31 days during CORE ALTERATIONS or movement of irradiated fuel in the containment by:

a.

Verifying the penetrations are in their isolated condition, or b.

Testing the containment purge valves per the applicable portions of Specification 4.6.3.1.2.

MILLSTONE - UNIT 2 3/4 9-4

  • During fuel movement or core alterations, up to four (4) electrical pene-trations may be removed. At any time a module is removed, there must exist a means to isolate or plug the opening if it becomes necessary to secure containment integrity.