a880o
~~
UN'TE3 STATES 74 NUCLEAR REGULATORY COMMISSION y
g p,
RF9 TON I C
8 s31 PARK AVENUE 00Ungf{gt P
KING OF PRUSSI A. PENNSYLVANI A 1940s L_
QUALITY PAGESI June 20, 1980 Docket No. 50-334 Duquesne Light Company ATTN:
Mr. C. N. Dunn Vice President Operations Division 435 Sixth Avenue Pittsburgh, Pennsylvania 15219 Gentlemen:
The enclosed IE Circular No. 80-15, " Loss of Reactor Coolant Pump Cooling and Natural Circulation Cooldown," is forwarded to you for information.
No written response is required.
If you desire additional information regarding this matter, please contact this office.
Sincerely, itF4'? b, (to B'yce H. Grier
' rector Ermlosures:
7 IE Circula: No. 80-15 List of Recently Issued IE Circulars CONTACT:
E. G. Greenman (215-337-5267) cc w/encls:
F. Bissert, Technical Assistant Nuclear R. Washabaugh, QA Manager
- J. Werling, Station Superintendent G. Moore, General Superintendent, Power Stations Dei,artment J. J. Carey, Director of Nuclear Operations R. Martin, Nuclear Engineer J. Sieber, Superintendent of Licensing and Compliance, BVPS 8 007020h Q
ENCLOSURE 1 SSINS No.: 6835 Accession No.:
UNITED STATES 8005050071 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND ENFORCEMENT WASHINGTON, D. C.
20555 IE Circular No. 80-15 Date:
June 20, 1980 Page lof 4 LOSS OE REACTOR COOLANT PUMP COOLING AND NATURAL CIRCULATION C00LDOWN Description of Circumstances:
This Circular contains information on the St. Lucie Unit 1 response to a total loss of component cooling water (CCW) flow to reactor coolant pumps.
Pres-surizer level and primary system pressure response indicate that voids were formed in the reactor vessel during the ensuing natural circulation cooldown.
1 The void was believed to have been steam in the area located directly under the reactor vessel head.
At time 0226 on June 11, 1980 with St. Lucie Unit 1 at full power, an electrical short across a solenoid valve terminal board caused one of two series containment isolation valves in the CCW return from all reactor coolant pumps (RCP) to fail shut.
The terminal short resulted from environmental effects of a (ninor steam leak in the immediate vicinity of the solenoid valve.
After unsuccessful at'.smpts to restore CCW flow, the reactor was tripped manually at time 0233.
Within two minutes, all four RCPs were also manually tripped.
A natural circulation cooldown was initiated at approximately 0300.
Component cooling water flow to RCPs was restored at 0400. The solenoid operated air valve whose terminal board had shorted was bypassed with a temporary air line to reopen the CCW valve (HCV-14-6).
Although variations in seal leakoff flowrates were observed, the seals on the four idle RCPs did not fail.
St. Lucie has Byron Jackson reactor coolant pumps with three stage mechanical seals plus a vapor seal.
Controlled reactor coolant bleedoff flow is used for seal cooling and lubrication.
The pumps do not have a seal water injectionsystem.
The natural circulation cooldown continued uneventfully until after time 0600.
The highest cooldown rate achieved was approximately 65 to 70 F per hour.
Between 0600 and 0630 RCS pressure was reduced from 1140 to 690 psi by charging water through the pressurizer auxiliary spray line.
Pressurizer level increased rapidly around 0700 while charging via the auxiliary spray line.
Pressurizer level continued variations for approximately five hours while the cooldown and depressurization continued.
When charging was shifted to the RCS loops pressurizer level decreased at rates lower than the rates of increaseInlevelwhenchargingthroughtheauxiliarysprayline.
During a two minute interval while charging into the pressurizer auxiliary spray line at 88 gpm, pressurizer level rose at a rate approximately ten times greater than the charging flowrate.
m 1
IE Circular No. 80-15 June 20, 1980 Page 2 of 4 The cause of pressurizer level variations appears to be formation of a steam void in the reactor head area due to a temperature lag with respect to bulk coolant temperature that developed because of insufficient cooling flow in that area during natural circulation cooldown.
Gas concentration in a 0730 RCS sample was determined by the licensee to be 32 cc/kg hydrogen and 16 cc/kg nitrogen.
These concentrations were not high enough to cause a significant volume of gas to come out of solution.
The indicated subcooling margin (Tsat - Thot) ranged between 220 and 150 F when the reactor head steam void developed between 0600 and 0700.
The minimum required subcooling of 50 F was not approached during the cooldown until around time 1219 at a pressurizer pressure of approximately 110 psig.
An ar tated record of pressurizer level is enclosed only to illustrate the high r
.itudes and rates of pressurizer level variations.
Insufficient information is contained in the enclosure to enable detailed evaluation of the RCS behavior.
Shutdowncoolingusinglowpressuresafetyinjection(LPSI) pump 1Bwas established at time 1051.
At time 1227, LPSI pump 1A was started taking suction from the refueling water tank (RWT) and discharging into the low pressuresafetyinjectionheadercommontobothLPSIpumps.
The common recirculation line motor operated isolation valves to the RWT were opened at 1226.
LPSI 1A was operating with its recirculation (miniflow) line open.
The LPSI pump 1B recirculation line should have been closed.
The pressurizer was filled to what was believed to be a water solid condition by charging at 88 gpm and using LPSI pump 1A to inject water and maintain near shutoff head pressure on the RCS.
RCS pressure rose from the minimum 110 psig to 200 psig (time 1300 reading) during the time LPSI pump 1A was operating.
The cold calibrated pressurizer level instrument indication rose to 64 percent and remained constant while hot calibrated channels rose to 100% level.
Temperature correction data for the cold calibrated level instrument didn't extend to 360 F, which was the approximate pressurizer temperature when the pressurizer indicated full.
Constant level on the cold calibrated channel indicated the pres wrizer was solid, but continued charging flow at 88 gpm was not causing pressure to rise above 200 psig, as it should have had the RCS been solid.
Letdown had been secured while filling the pressurizer.
The indica-tions of a steam void in the reactor vessel head were no longer evident after RCS pressure increased although the exact time when the void disappeared has not been established.
During the time LPSI pump 1A was operating with miniflow recirculation to the RWT, the absence of rising pressure in response to charging flow was investi-gated.
RWT level increased 0.3 feet (approximately 4500 gal.) during this aeriod.
Miniflow from LPSI pump 18 operating in the shutdown cooling mode is aelieved to have been the discharge path from the RCS to the RWT.
After shutdown cooling system warmup, the LPSI pump 1B miniflow manual isolation valve had been shut.
After RWT level increased, this valve was found one turn open, which would have allowed miniflow back to the RWT from LPSI pump 1B.
At time 1357, LPSI pump 1A operating in the injection mode was secured and
O IE Circular No. 80-15 June 20, 1980 Page 3 of 4 miniflow was isolated.
Continued charging with two pumps at 88 gpm total flowrate caused a slight rise in both pressurizer pressure (to 260 psig) and cold calibrated pressurizer level.
Letdown in excess of charging flowrate was established at 1430, and by 1500 a steam bubble was drawn in the pressurizer with level in the indicating range.
The RCS was degasified over the next day, then depressurized and drained to inspect and replace all RCP seals.
All seals have been removed and visual inspecti9n showed no signs of degradation of these seals.
This event is significant for several reasons.
It is an example of a natural circulation cooldown during which a steam void formed under seemingly normal conditions that was large enough to cause large, rapid variations in pres-surizer level.
The possibility of a total loss of component cooling water to reactor coolant pumps due to the single failure of any one of four CCW contain-ment isolation valves was highlighted.
Inadequate control of LPSI system alignment allowed an unanticipated discharge of reactor coolant directly to the refueling water tank apparently through a pump recirculation line.
1 Recommended Action for Power Reactor Licensee Consideration:
1.
Disseminate this iriformation to all licensed operating personnel working at power reactor facilities.
These personnel should become aware of the possibility of steam void formation in the reactor vessel head during natural circulation cooldown even when a high subcoolinij margin exists in i
the reactor coolant loops.
2.
Review and revise natural circulation cooldown and shutdown cooling procedures to caution operators against the anomalous conditions that occurred and to include appropriate re'covery action if they do occur.
3.
Establish a natural circulation cooldown and depressurization rate envelope that will both preclude steam void formation and assure adequate core cooling.
Incorporate this envelope in cooldown procedures.
4.
Evaluate the design of component cooling water systems to determine vulnerability to single failures that could cause loss of RCP cooling, common cause failures of RCP seals and reactor coolant system leaks through failed seals at multiple locations.
5.
Consider installation of a reactor vessel head metal temperature monitoring, system, if not already installed.
It should aid the operator in preventing a reactor head to bulk coolant temperature differential large enough to form a steam void during natural circulation cooldown.
a
+
IE Circular No. 80-15 June 20, 1980 Page 4 of 4 If you have questions regarding this matter, please contact the Director of the appropriate NRC Regional Office.
No written response to this Circular is required.
Enclosure:
Annotated record of pressurizer level
.e n.,,
p%e:..
.3 7 1:. -.
n,-
- g y p. -l..
,..u.~A.r;.
- i. i W - --
Gi 4 7 4 W.*
v :.M.;.:.
" aJ: z.-- - =.n=
~.
w 7..::m pm--
/ 7.
a~
A. UF: ^
,.i.. jilT;J@i;7Pli23SUiE.5WL.Cn%pNsb!ll0W0hiN!
I!
- u.. +
'p..,, m e p; g &m l.y q,g
,g.
4.2. 40H MIig:.o....g4g;.n.g;d!W l._Q* ypp y-RL jap #,a gx.,:
- e K'y h
- ,~'
.T. i. J '.
_3.:l.i,.h... $!.E.. %. tend.$..lm@
..c
.o
. g.;.
q.,.
1D:.!!.. igggg,iil:l..q;libidL
. n,i, r:'8:b:y. aHhhIFsp o.
~
L t.
2 k*,Qr_
N hthh (*l*' f f
s i.
iffd!"O.N.f.f E.N. Ilk - $1.
NU mNih !O:];
Ud
~-
4.3.:>. !. pati php.rQN,gigi%iR[i iiil!Qhpdyynn,@llmli.
~
~
E
...g; 5W:
y
[-h$ '
I~.
c.
f[Nlli. i ielhM'hh[hlhhh' ihf.h'Ifkki:hhhiN![!h' I
~
T*
. 'i -
t':iIlhi:'iM.'li4!!ik;QU$IfId W diliS! iIll iU-4I!lii!!NiI!!il
^
nG3, _ q
- iiSi'i$;mmi2iuth n!NkiLik 1MtlUm!hilHB!Nidill!!m!!
ld.9QQ$
i j 9%:;M iH&!H!I S iln! n ;j$ Ibii!'Ji!!Hh:2.;:id!!$$
.:t #e; mi:Mimubinn%Ii8nml#ill!#eilMim7 V. "
g..
~- ~
%l Q.E
< 't N;h iIS!!!;:bi;ih' diUUSIi I!! lI!
'EU0.NhmIIIdIII!:iillN: ti!ilIIII
..[ J'
$c.Q 7 9:Hiu.@l.2PWCMnlh m; lm DHmH11H lii3:9 !WmiHm!
i om e mi e.mmm!imnunumminnuimmimmunm
-n
-Y M".!.;M,[ j,dQ!Uihlllhh h:,llhhh ihlhl%h,']hhj
~
$Mo235.vi!m hie:I m-r A * '
Si46iinhcmdimm ma-,
l f~
S.x
$. e${@.M.m m w ahmmnnsmswmmimiirNmulim 1-
- . ', gig f
- :.W..i. M@C. id..C-lhll.O'CMI!$!iil!N$km"$!mii$m!Ill3 Y[
m *. '.,
- /
- j f.f"._. *., N,.'..,..e
' !N.p.cg m!.C..ts. lW.h.
p!ll.! d; M!! h.a..8 u l h
. cec C..
iht : ah;Ci ha"g a.--.+ m pp ;ig,i s
l t itj l1 g
- j h i k
..k.
fhh h f
f,!.
h, hh!f di k... -
{
e ~ w.,.s.e 3
i
.b
.I g.
M.09 Nnn!; m WAadmmun.muninwiiidini a.
{
.....e.....
. m.f.m_.. c
- 4 :i!anuanmm.a.iag,,muc.an_:s. ;Md. m_.
.a.
f
.i ti I
fb fl I.
t' r
-l.
M i
- M.
, [.
ll!ii(I 5
O
.... -.ga, g3
,,,.l.'d k.. I AI I '.q. i ;y-Nlhw.
c ! b:;.e..:!ilik.c,n."th. ohP:;o r mi. is n..d. H b 'f.l N
.,l. N.. *3, I
b lbN 9 'q t t Sa "..y D e
-:r..
s
.g
--lh e
.t
.a uh..... e.9,. e. O. o e e.
c cn 7.+.e s, o.. ji.L.r pdd.
~ [ e i.: AlidiU6RM.I! inh @iln h!mhmWlNm"u l.i.UE....h3N.,,.r!_U M. m....4.C
.a
-[.
- d..
r-
... J T..'.
- $..0600.
1:3.hBiV! :gN4
%hitiinill!mWilliiH!!Mindh%~i;b i! Vill:P!
ifWildi!!i :iliil9s Hifin;Tiiiiiiii aillm.9 DEPRE3Su Ai 2 F T
4P;W1 LP: hi
~
%. ik....
I "a % ilnl:q:. Mihyp!n '9!liH! h..iHW[p]n..: h wWdimWT N 'N O Pk
~ P.im!H iid uih! Mi.Mulk;@ill!":d,,!bliimWi :.m
~t,.r..
- - w..
5,; i.i.m.i_ll_ki i
A r
.f. :. '-
PM.' i'im
!: lmi UpljllitiMi;dil MNillHH,?! ijgll i'j~;
lik hi ? '07d C 7 i;
. c o.i. %:i I',pni Wpqppi!"ly[ir.~u. gip oW:hi m..
J wi u
7:
o.
a
~%s c~icP LeTbot.nj
. :. it.o,.f::. o.
bDau,l.b:o.e,,,,:lH;.=o,lkn:ptri" o.
e c
,e:
n g.i is e
j p! g li!
l.jj b N-
[*
l
'... h., s ;
..gph dl;[gh% Mr:~;IT lh S To P FTEb
, 'Q DO *L dii: @i!!W hiiOWi i!.kMnCik, 3.OHARC.Mic Pumh4 f
'm '
" i.,a.i M M-DWr;p:: S.. r.
p;WMW:h:cW h.
""ir, ;tyN[phM
. nim _.N.,.b:r
,L,J h.,.. t.m"'
Mhn j 1
m i T 3
!.3,,.7pc;
.....,liji.i:n.W a
STM4., - Ed ee 3 ~.., '. ;j, a
~~~*lC M Rc. m c. Po m e
.. W
. % p3T.?h. -,W,.
s a;..
.E h F -- -
.?.
0 90 0.-_
i d!W D,.'1 Uhlifi!U,iiiii':--94ss.;!i,dg.q', l s in r ten ewa
.o 1
.g
%w. ~
P&2 C ENT LEVEL
>J..-..
a.q
- x..V 4,
li.7
[?.:. : t...,
,..-.)
..n
. %a
..,. W,'T-~. :...,. '.. -
..~
~
-: --l u ep "L"-
~w;? -
...-v-
- p. n. n.
. >. ~
.:. 3-!.
~-
@.E.Jf. ' _',. 3. ::+ ^.N ", '..
- -1'.:.'= ?'-
. m.
-:.p.
.f
' ;i J c e,
.w
.; :.g..-
nn.
, ~ -
,ja.p;*e..
o..* ' ;c -l.'e l:lj,: '..,. h "W
..,'gp;;
Iql.n
. p %h p QQ
, s.
t..
..~
.i x ys
'.-i
^... -
..ggg n.
.. 0;p : i pjUUni "
l i!ll#M :...:l.t.i.'Wi
'.N. CHAR &/#G-To Mphii: Cpip
.. -a
..e.
c:{
.;,.,gp,;
j.g.[39qgiggp.p,y.g u.
4 uX, S'PBA y g..
m'iqO06-7i;q.g,pq.b
.:'l!;is D..Miti!3iHMiMihyb:S ('
W'
..Q
,, ;I
(.
yG@
g ;;g q c g ep m 'ip. Q :
. T @ ~8AmPbeajM
- g. e. g;. ;~<. w : M. -:IM.
m w:M. i. p~, gi yvpp: 7 hpj;ni:
W '.
n
,fg ' 3.,.o 3-:Of 3?N * ~ %Dyl] "L.:":ih@:
n,d!hJiiilW'I"'.' ~, co.F;iW.'1..
!.-'._.. CHA AGl# 70
. +.
~
7.
M"l:HMi
...o e_,,.v.. y&.aEl o o
.-sw..p.i._.m..: n. r.m..iq m p s.,@.. i i..:.=- %.p;:i. M IlC? Loop 8
.~
w
,r a
.w ir,.m.; -
s.e.
... w :. x...
-c.
o.
en,7.;;;;l,.uc, 4,.p.o7 - o..x..
m o..
.. l....j7.. e e,7.. 7, p..r.
- e
.im ::;., pin,fm. c..:.. o. n
. s4..
- L s
En.., -,
g ;;.
t-
- g:3.
se
... u.n,. gl.: n,
.1y, e
~
- a.. :..:in
.r, n.
in.
, n n...jea ei. w E a.s W.r.
- u...,.. i..
. M;.7.-;'... J 6, 1 r_
n iib H!i iF @; thH.!
F 'i4*H.+ MWiW A M,
- r.
ut.06-o.4.,e~. uu.Jo.,n....:e;r.cle m
!.r,.m o o
,.vvK
.;n......
+ _
t
..,c.
'c
.&, -,... a. 3&.. &. '
- k. *a c..'"b. q", ?c..
- Q.
' A. ; n"..p smar L.PS*C
.m
'~
.l. A IN,TEc D a N i t..
.l.
N.. T j. * ?..,..
!lhh,.a. ij, C.,pl. :tl.h..M,.!:;i::p pio n,
su a t t. i.
- w*g/f.
n
.f N.
- . Ja *_
-i
,---.i 7
g- ---M.
n,
.-/ 0 RCs N
..l'-.-
(,)
h l
,' l PRCM $ U T~
, w l ~
.,...i, t -
.w.
' 8 :,i a.
.. w o-
....v.
v.,
. W,'.
~-
O
-l f ' ;:[.[:g;.g,, t
'.b6:.O*'TO.h j.j.c ;ln : n :'l,o:#.0o. L;.s. c..u.$
.. =.
r.;P j ~ c d.F. h.i !'h... s. t :i uu: t o.no i :o 3
.'.{,-
) ".,.;-].,
g, p; gg g., g g j:;pi,tg g-:gnj.g:plfl,yjjg,g, 4...
A
'. g
.)
l{ likh
'(gf.: v..-. &,...
c d,
,!h.h..,. d!.h. '.. d...d,.. ; i: lim.
i
-c.
8
.;:.pi l:... L.i"l L,.1! l.si:,..l1
- -.._._a i; ::! N...."..d, 1:-
SEcu ge-.
. ' r, r
...,8d.,...:!.F:-l
" d G..
^
- rl fl....t.
- llj. h, u.. :l"
..,'. P. h. [p ]; W j u,l.,.". l.. :f t
.. A8%8 L P 3 2..
- 2. r,,r
....&~g.
.y.....
q.
Md p g...
'. ii.,
I..
2 r
ti:ipn:lt;un.?! Jii:il'l4 _u__ii!i.lD_: i.i.!.:.3.!!.'
_!4 M. niTd.." _i.:..i:cil, idim
~
v.
. g '..
- .0 0 4......libe b,
- .......: !:m, n..
.. x.r. n:it:p
!"h.
a!r i
u;'h:..,d,r,ih..iS,"'
y-P.R.. ',
./O O,
- i Fi
- dWtip. 32..! <Fil Di a
l.'..E*_
i. I H,:. U. p. "j",.. P 10. 'p. Pin. f.iT@t D/?MrdlN G 1
.u
[M 7 u-1 f
$:jptf.$p@.pyn :, pW.?:hi:7.;[Fij$i:Di@Ir G,9gi9 FER Euseur El
~'
u..
.-j tsisti7i]4iM3li: m:. i!iFNE!!U$l.Mj:fien4! F j
$.I i -
j~ 4 g 9!hhiHhlNNdib_;l.'ildh b
i III@ddOfI*MikUO! li.t!$0.!lI.!i,'li! i.:, qb!i. 6.1[~i i!dddillMiU.llph Md'. b.'W!g dh
.:-(
,-:::li!!I gb'E' N
'~
N.h -
H fh$i!iDNuQ
'N!IE k,llih N.;"l @ #..%.-.!H.W hih.!
Umti:hli!UlVilh;hh.
s
.l
[
h!hh.ONOh IN$d:lll t
I uP ii!. Ihd!il--diihd:11 1!N bih t s f=il@ M : Fi.bbWlilh GA W e kmp
- 3. i. l i
. =
l,6 T
- v.
- -.. ~..
,,po,gg n.. n.g
, a..e c.
ns -
a-A..
- rl.
- 9,,M,i.in., s e'a N %;.o p'.i.i.pic -
W'..
.l" m
c :r_.
vi.a.. %
- g. u.v%.,
- ':. m.,..
.. o q t., I.:"o. ;..
q-. c.. :
s i
- a. o e
a..a 7d.'.@. i.l.i IQ
".' O.:~ r.n..q.. a.l.r...e. o hw.g
.pihw. ;d, i,. a..: e... -
p@l.j'.h
,0 d.e:.,,..l ;.
4 o
l i:
E_+..c _.M 2 d';1
-#i i : :
m.
--- i.
'_...._._. [
.n_
i;.hW!i..
-.1
.i._,4]ihiid 9.'
,. I.l.....,;.t H. e
. F... Q, o _..
d.h.i._.e p.. to w.,d
. N... y;. p., o -. _..n pn;q t :'.
t. __.
q-3 r
1 C
.J m.
10.l:::: 9..,.p8'ln,;,..::l....l :.l:.;. hw. a.n..... !!b;.;ahh.j.i":
p...
,,n
. o c hi.,l. 7 -
c.
4,_
u. h..,, p j. i ' W,..
.e :.
..c.ir r
- pii.c e
.p,.,W d.9. 9.r.
.., ip.. y: h i
' o fi.,i
- , n;t.,
- ,,o.d.,,
0 9 N.i..i.. ij p.: v.'.;,'.
.o
, [.,n
', I.
I o ;
O.l].:s f, a,
.j. A..: @...
?.l l
' f. h.. -. -...f ;
,.:q m:'.!,
u
."_g !
,a, n'
- l.,.s' i. lai].;,,
y t
.s.
.8:. l '.
cn 43 P ;..b,i:
dU w-Q
_i,[a.>.1q t;9i,
pg,-lt il!!. H., ".,p j ;;p !.o. 8, $,..:!.
. : b..
n6 W l S.M,,p Jif. d.p[ii.h!,"1.-
..{.;;i l:s o i. :'.[.. id a
E N Th p$
.i?p{ didhi.i
$:W'O hi:jp[ A, 3....
US$%.s.,i't..:
t.d {.Th!ppc h:HID a
. tn W
.c o
W r-E,'lm.. $ W,
w, wrL n...-- t.-- n. a m
y1 n
g:..:.- -- - - t-u n; m.
n lh.L::!] ld ii.i!hib I.9.h.'.,'l lid @ T._..'.l y4lD dl- $ d:%d'iY'--l l
.h':$!' l'd'b: --.
L ;..
.+
llf ah f f LI
'Ik i
h 4
h ' dl
- .: $.,u hiff:Ml'll'ji.,!!.5i!h'..s r
7 i.
libbl };.V hih!h di;b.
- m... ;,
..~.m.......:.
. -.....,.............................a...m.
.,)
..,q ' % -
.['w' r
s
~
3.,
um.~
IE Circular No. 80-15 June 20, 1980 RECENTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to No.
Issue 80-14 Radioactive Contamination of 6/24/80 All holders of Power Plant Demineralized Water and Research Reactor System and Resultant Internal licensees (Operating Contamination of Personnel and Construction Permits), and Fuel Cycle licensees 80-13 Grid Strap Damage in 5/18/80 All holders of Reactor Westinghouse Fuel Asseclies OLs and cps 80-12 Valve-Shaft-To-Actuator Key 5/14/80 All holders of Reactor May fall Out of Place When OLs and cps Mounted Below Horizontal Axis 80-11 Emergency Diesel Generator 5/13/80 All holders of a power Lube 011 Cooler Failures reactor OL or CP 80-10 Failure to Maintain 4/29/80 All ho'.ders of Reactor Environmental Qualification OLs and cps of Equipment 80-09 Problems With Plant Internal 4/28/80 All holders of a power Communications Systems reactor OL or CP 80-08 BWR Te.M ical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWR's holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil Nstem reactor OL or CP 80-06 Control and Accountability 4/14/80 Medical licensees in Systems fpr Implant Therapy Categories G and G1 Sources 80-05 Emergency Diesel-Generator 4/1/80 Al[holdersofapower Lubricating Oil Addition and reactor OL or CP Onsite Supply 80-04 Securing of Threaded Locking 3/14/80 All holders of a power Devices on Safety-Related reactor OL or CP Equipment l
'