Proposed Tech Spec Change 2.Allows Substitution of Installed 69 Kv Offsite Power Source,Instead of 500 Kv Offsite Power Sources,In Event of Transformer Failure
ML19320A635
Person / Time
Site: Calvert Cliffs  Constellation icon.png
Issue date: 06/27/1980
From:
BALTIMORE GAS & ELECTRIC CO.
To:
Shared Package
ML19320A626 List:
References
FCR-80-48, NUDOCS 8007020448
Download: ML19320A635 (3)


Text

n J

ATMHMOTNo.2(3Q

%)CE hlo. 2 FOA. 8D- 4 8 3/4.8 ELECTRICAL POWER SYSTEMS 3/4.8.1 A.C. SOURCES OPERATING LIMITING CONDITION FOR OPERATION 3.8.1.1 As a minimum, the following A.C. electrical power sources shall be OPERABLE:

a. Two physically independent circuits between the offsite trans-mission network and the onsite Class lE distribution system, and
b. Two separate and independent diesel generators (one of which may be a swing diesel generator capable of serving both Unit 1 and Unit 2) each with:
1. Separate day fuel tanks containing a minimum volume of 375 gallons of fuel,

' 2. A common fuel storage system consisting of two independent storage tanks each containing a minimum volume of 18,250 gallons of fuel, and

3. A separate fuel transfer pump.

APPLICABILITY: MODES 1, 2, 3 and 4.

ACTION:

a {00Kv I a. With either M offsite circuit or diesel generator of the above l l required A.C. electrical power sources inoperable, demonstrate

the OPERABILITY of the remaining A.C. sources by performing

.!' Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a 4

, within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; FOOTWOTE a restore at least two offsite circuitT and two diesel generators j to' OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

i Soo kv i b. With onefoffsite circuit and one diesel generator of the above l requ. ired A.C. electrical power sources inoperable, demonstrate

.' the OPERABILITY of the remaining A.C. sources by performing Surveillance Requirements 4.8.1.1.1.a and 4.8.1.1.2.a.4 within

, one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore

=

j FooTND E at least one of the inoperable sources *to OPERABLE status l

CALVERT CLIFFS- 3/4 8-1 80070fd0 j,6 ~

ELECTRICAL POWER SYSTEMS ACTION (Continued) within 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

, Restore at least two offsite circuits and two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from the time of initial loss or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the followino 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

c. With two of the above requi eA.C.circuitsinoperable,l
demonstrate the OPERABILITY of two diesel generators by i performing Surveillance Requirement 4.8.1.1.2.a.4 within one hour and at least once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter, unless the diesel generators are already operating; restore at least one of the inoperable offsite sources to OPERABLE status within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />.

With only one offsite source restored, restore at least two FOOTNOTE *offsite circuits *to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time l of initial loss or be in at least, HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN wit'hin the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.

d. With two of the above required diesel generators inoperable, (

demonstrate the OPERABILITY of two offsite A.C. circuits by performing Surveillance Requirement 4.8.1.1.1.a within one hour and at lenst once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> thereafter; restore at least one of the inoperable diesel generators to OPEPABLE status within 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> or be in at least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />. Restore at least two diesel generators to OPERABLE status within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> from time of initial loss or be in at

least HOT STANDBY within the next 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> and in COLD SHUTDOWN within the following 30 hours3.472222e-4 days <br />0.00833 hours <br />4.960317e-5 weeks <br />1.1415e-5 months <br />.
  • (Ab'D t% eh a4 ('CA.

WbttEt)

SURVEILLANCE REQUIREMENTS l 4.8.1.1.1 Each independent circuit between the offsite transmitsion l network and the onsite Class lE distribution system shall be:

a. Determined OPERABLE at least once per 7 days by verifying correct breaker alignments, indicated power availablity, and
b. Demonstrated OPERABLE at least once per 18 months during shutdown by transferring banually and automatica11d unit power supply from the normal circuit tc the alternate circuit.

4.8.1.1.2 Each diesel generator shall be demonstrated OPERABLE: -

I CALVERT CLIFFS- 3/4 8-2 l

CHAtJE No. 2 Foornare voz 3. 2 I. i / crwas a., L., e  :

ikJi7 Alo. I

  • 7L Mhv (SMECO) offdf.e fsw Jou'ce.

AsCAbed' d /9nwa % d A/O./9 l<

M for ou 500kV mu.

udir Alo. 2

~

% Tk 69kv [SMECO) owd Evwet.

descdLee f for e n I 50o kv s

& p\)o.

61cu de.

shAsALie)1

&kw<X .

l