ML19320A146

From kanterella
Jump to navigation Jump to search
Forwards RO 50-313/77-05
Date released: 11/30/2019 Download: ML19320A146


RO 50-313/77-5:on 770128,at Hot Shutdown Conditions During Routine walk-through Investigation,Pinhole Leak Discovered on Upstream pipe-to-valve Weld of Valve RBW-77B.Cause Unknown.Repair of Weld Scheduled for Refueling Outage
ML19320A155
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/07/1977
From: Mardis D
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19320A155 (4)
Forwards RO 50-313/77-5
ML19320A152
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 03/07/1977
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: HOWARD E M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19320A152 (2)
RO 50-313/77-5A:on 770128,pinhole Leak Observed on pipe-to- Flange Weld Between Valve & Seal During Routine Investigation.Cause Unknown.Defective Weld Repaired During Refueling Outage
ML19320A150
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/08/1977
From: Mardis D
ARKANSAS POWER & LIGHT CO.
To:
References
Download: ML19320A150 (4)
Forwards RO 50-313/77-05
ML19320A145
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 04/08/1977
From: Rueter D
ARKANSAS POWER & LIGHT CO.
To: HOWARD E M
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
Download: ML19320A145 (1)