Forwards IE Insp Rept 50-313/77-13 on 771220-22 & Notice of Violation
ML19320A015
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 09/09/1977
From: Madsen G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Cavanuagh W
ARKANSAS POWER & LIGHT CO.
Shared Package
ML19320A007 List:
References
NUDOCS 8004140634
Download: ML19320A015 (2)


See also: IR 05000313/1977013

Text

__-

..-

o

-

-

-

.

.

.-

n

.

j# "Dt

UNITED STATES

.

gb

NUCLEAR REGULATORY COMMISSION

4

g

i

REGION IV

.t-

n

I

7.

j

611 RYAN PLAZA DRIVE. SUITE 1000

$ *.p

e

AR LINGTON. TEXAS 76011

%; = cg/

September 9, 1977

.,,,.

Docket No. 50-313

h

Arkantas Power and Light Company

ATTN: William Cavanaugh III

Executive Director of

Generation and Construction

P. O. Box 551

Little Rock, Arkansas 72203

Gentlemen:

This refers to the inspection conducted by Messrs. M..W. Dickerson and

T. F. Westerman of our staff on August 30 - September 2,1977, of

activities authorized by NRC Operating License No. DPR-51 for the

'

Arkansas Nuclear One, Unit 1 facility, and to the discussion of our

findings held with Mr. J. W. Anderson and other members of your staff

at the conclusion of the, inspection.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

reccrds, interviews with personnel, and observations by the inspectors.

During this inspection it was found that certain of your activities were

not conducted in full compliance with NRC requirements, as set forth in

the Notice of Violation, enclosed herewith as Enclosure (1). This notice

is sent to you pursuant to the provisions of Section 2.201 of the NRC's

" Rules of Practice," Part 2, Title 10, Code of Federal Regulations.

Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you, and the

o

results achieved; (2) corrective steps which will be taken to avoid

'

further noncompliance; and (3) the date when full compliance will be

achieved.

However, since corrective action had been completed for

Infraction #2 while the inspectors were on-site, no response for this

-

item is required.

(

%/

,

!

I

8 0 0 414 o 4.7y

,

'

-

1

. _ -

.

.

,

.

.

.

,

,

.

(

(s -

Arkansas Power & Light Company

-2-

September 9, 1977

,

-

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the NRC's Public Document

Room.

If this report contains any information that you or your

contractors believe to be proprietary, it is necessary that you make a

written application within 20 days to this office to withhold such

information from public disclosure. Any such application must include

a full statement of the reasons why it is claimed that the information

is proprietary.

The application should be prepared so that proprietary

information identified in the application is contained in a separate

part of the document.

If we do not hear from you in this. regard within the

specified period, the report will inn placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be

pleased to discuss them with you.

Sincerely,

,

-

el]b 'bhSU

(d)

8. L. Madsen, Chief,

N

Reactor Operations and

Nuclear Support Branch

Enclosures :

1.

Appendix A - Notice of Violation

2.

IE Inspection Report No. 50-313/77-13