ML19319E221

From kanterella
Jump to navigation Jump to search
Requests Insp of B&W Barberton Facility Be Arranged to Verify Content & Completeness of Purchasing Records
ML19319E221
Person / Time
Site: Rancho Seco
Issue date: 12/09/1971
From: Reinmuth G
US ATOMIC ENERGY COMMISSION (AEC)
To: Oller R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
Shared Package
ML19317G497 List:
References
NUDOCS 8003310729
Download: ML19319E221 (1)


Text

jm s ;;

., 6. ;. O 7

r.

6-

,p;,

I

.g bm GFIhmie, M DEC g@

L a'

R. 5. 011er. Reactor Constraction.~ COIIII

.p' i

INSPECTION W BABCOCK & WIIC01. RANTON CHIO As discussed by telephone on December 6.1971. please arrange an qj ic T-inspection of the Babcock & U11cox (Ft.c) shop in Barberton. Chio The

)

as soon as possibla, praforably before the and of the year.

k P

purpose of the incpection von 14 be to===4a=

certain purchasing records to verify their centent and complacenssa.

As you know. Compliance was asked by a Congressional source to investigata an allegation. relating to a retroactive changs in a purchase order. Mr. G. F. Ihmle from the Division of Inspection and I were seaigned responsibilf.ty for the investigation. During c

our visit to Fla on December 2-3. we detem4==d that no such change was made but think it prudent that similar purchase orders and accompanying records on other contracts he awa=4nad to verify that the records are accurate and proper.

leere specifically, we request that you exanine the purchase orders (P.O.s). changes..chsage authori=ations. and the test information i-required by the P.O.s for tbm Oconee 2 (either unit).1Esneho' Seco Par-N~3/1 (Unit 2), and the Davis-Besse (both units) steam genarstors.

ticular attention should be given to dates, date of P.O. changes.

b.

delivery dates. specified codes, specifications, complianca with the requirementa specified, completeness of the files and the clar-p ity of the order with respect to the heat treatment of the plate.

.r materini (secondary side), Por your information the plate for the Oconee and Davia-Basse orders vers delivered in the green as-rolled

?

L a

condition, whereas the Rancho Seco plate was normalized. One plate in the Ranche Sece unit was not normalized. Also, one place in one

[',.

of the Davis-Besse units.was normalised. The records should reflect'

~'

~

these lgregularities.

.m.,

J (f

~-

J T.

If you have further questions on this matter. please call as neces-m span completion of your inspection please advice as promptly sary.

~

~

[

-of the results.-

"Od-8.y ye-1:d by s,

1 M

c, p., : *.

O. W. Mainanth Seninr Easctor Inspector S

Division of Complianca l

l c i

JE5enderson CC: LIQ - EVatte r. COIIII omer.,13..Lo.w CQt..E..Q 1kan. C0tRQ

h...

h U

f

%.C0 gg3910 I--

i SU**"< > (Nae naut ib -JB nderse.,

om> 12L911.L

..t-

/.}

L 5

r n. Asc.u.(no. 53i Arcs 24

. o. oov.

~,

~1,~a o,..e.

i.1, w

e sa

..------.-.wo-

---w,es.--.-ve--

--