Forwards Insp Rept 50-302/74-02 on 740129-0201.No Noncompliance Noted
ML19319D017
Person / Time
Site: Crystal River 
Issue date: 02/14/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19319D015 List:
References
NUDOCS 8003040942
Download: ML19319D017 (3)


See also: IR 05000302/1974002

Text

. - _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

/ 3 [ d '*r'g. )3'.

UNITED ST/TES

(>

-

A

MIC ENERGY COMMISSION

'. D l.1

DmE:rNMATB OF REGULATORY OPERATIOU3

.

neolow n - soire ein

2 30 Pti AC H r R E E $T R E ET . NOA T H wtU T

Tess , o s: i4cas sa s.4sc3

yn e

A T L. A N T A, GE oRGI A 30303

e

FEB 141974

In Reply Refer To:

-

'

'

RO:II:KWW

50-302/74-2

..

.

,

Florida Power Corporation

ATTN:

Mr. J. T. Rodgers

-

Assistant Vice President

Generation Engineering

3201 34th Street, South

P. O. Box 14042

-

St. Petersburg,* Florida

33733

Gentlemen:

This refers ~ to the inspection conducted' by Mr. K. J. Whitt of this

office on January 29, 1974 through February 1,1974, of activities

authorized by AEC Construction Permit No. CPPR-51 for the Crystal

River 3 facility, and to the discussion of 'our findings held by

Mr. Whitt with Mr. P. G. Davis at the conclusion of the inspection.

\\

J

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted

i

of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector.

Within the scope of this inspection, no violations were disclosed.

We !; ave examined actions you ha' e taken with regard to previously reported

v

unresolved items. These are identified in Section IV of the summary of the

enclosed report.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

~

Title 10, Code of Federal Regulations, a copy of this letter and the

enclosed inspection report will be placed in the AEC's Pt.blic Document

j

Room. If this report contains any information that you believe to be

proprietary, it is necescary that you submit a written application to

this office requesting that such information be withheld from public

,

disclosure.

If no proprietary information is identified, a written

etatement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

(p)

' t -/

l

v

,

\\

.i

j

- a

80b8040 $ 0

L

'

-

o

.

rm

_

.-

.

.

Florida Power Corporation

-2-

FEB 141974

<

,

.

and referenced in the application since the application will be placed ,

in the Public Document Room. Your application, or written statement

,

s' ould be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter may then be placed in the

,

Public Document Room.

Should you have any questions concerning this letter, we will be glad

,

r

to discuss them with you.

.

Very truly yours,

/M'

-

Norman C. Moseley

Director

Enclosure:

-

RO Inspection Report No.

50-302/74-2

r

~ k

't

.

I

9

-

.

m-

.-

-.

..

.. .

-

.

.

. - -

.}

_

,

.

-'

,

.

.

'

.

Florida Power Corporation

FEB 141974

,

Crystal River 3

-

,

RO Inspection Report No. 50-302/74-2

,

,

cc w/ encl:

'

H. D. Thornburg, RO

'

EQ (5)

DR Central Files-

Regulatory Standards (3)

, _

Directorate of Licensing (13)

cc encl. only:

'

-

  • PDR
  • NSIC
  • State

!

  • To be dispatched at a later date

'

,

!

4

0

-

- __.

, -

3.-

- - - - - - - ,

--

.-

.

7

-

--,,,y--,

. .

,.n

,-. , . _ .

,--w,,,y--,

,-. .- , - , - .,-w,

,e*

, - - , - - - -

.