ML19319D013
| ML19319D013 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 02/07/1978 |
| From: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Griffin B FLORIDA POWER CORP. |
| Shared Package | |
| ML19319D003 | List: |
| References | |
| NUDOCS 8003040939 | |
| Download: ML19319D013 (2) | |
See also: IR 05000302/1977024
Text
.
.
- ,.,,~
..
.
[g" "'C&g,jo
}
UNITED STATES
(
g
NUCLEAR REGULATORY COMMISSION
2
c5
REGloN 11
/
h
n$
230 PEACHTREE STREET, N.W. SUITE 1217
1 -[
% . . . . . #[
hh[ r
o
ATLANTA.GEoRot A 30303
FEB
7 1978
In Reply Refer To:
.
RII:GTG
50-302/77-24
l
Florida Power Corporation
Attn: Mr. B. L. Griffin, Senior Vice President
Engineering and Construction
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
l
Gentlemen:
,
This refers to the inspection conducted by Mr. G. T. Gibson of this
{
office on December 5-9, 1977 and January 11-12, 1978, of activities
authorized by NRC Operating License No. DPR-72 for the Crystal River
Unit 3 facility, and to the discussion of our findings held with
[
Mr. G. Beatty, Jr. at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in
the enclosed inspection report. Within these areas, the inspection
consisted of selective examinations of procedures and representative
records, interviews with personnel, and observations by the inspector.
During this inspection it was found that certain activities under your
license appear to be in noncompliance with NRC requirements. These
items and references to pertinent requirements are listed in the Notice
of Violation enclosed herewith as Appendix A.
This notice is sent to
you pursuant to the provisions of Section 2.201 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations.
Section 2.231
requires you to submit to this office, within 20 days of your receipt of
this notice, a written statement or explanation in reply including:
(1)
corrective steps which have been taken by you and the results achieved;
(2) corrective steps which will be taken to avoid further noncompliance;
and (3) the date when full compliance will be achieved. With regard to
items B, C, and F, corrective actions were comp 1'eted prior to conclusion
of this inspection; therefore, your reply may be limited to the actions
to be taken to avoid further noncompliance.
.
In addition to the need for corrective action regarding these specific
items of noncompliance, we are concerned about the implementation of
'
your management control systems that permitted their occurrence.
3
J
8003040 9,3 9
'
-
.
._ . _ - _ _ - .
.
w
. :. ,
-
.
-
-
-=
pgg
, p-t
ry
{v\\ -
Florida Power Corporation
-2-
-
Consequently, in your reply, you should describe in particular t iose
actions taken or planned to improve the effectiveness of your mar agement
control systems.
In accordance with Section 2.790 of the NRC's " Rules of Practice,"
Part 2, Title 10, Code of Federal Regulations, a copy of this letter
and the enclosed inspection report will be placed in the NRC's Public
Document Room. If this report contains any information that you (or
your contractor) believe to be proprietary, it is necessary that you
make a written application within 20 days to this office to withhold
such information from public disclosure. Any such application must
include a full statement of the reasons on the basis of which it is
claimed that the information is proprietary, and should be prepared so
I
that proprietary information identified in the application is contained
in a separate part of the document.
If we do not hear from you in this
regard within the specified period, the report will be placed in the
Public Document Room.
Should you have any questions concerning this letter, we wil. be glad
to discuss them with you.
%
Sincerely,
O
am
Ja es P. O'Rr. illy
Sir ctor
Enclosures:
1.
Appendix A, Notice of Violat
2.
Inspection Report No. 50-302/77-24
cc w/ encl:
Mr. W. P. Stewart, Director
Power Production
P. O. Box 14042, Mail Stop C-4
St. Petersburg, Florida
33733
Mr. G. P. Beatty, Jr.
Nuclear Plant Superintendent
P. O. Box 1228
Crystal River, Florida
32629
%
-.
.