Text

__ - _ _ _ - _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _

.

,

~%

.

L'

.

,

.

.

[^3

  1. "%

~

UNITED STATES

p

1

ATOMIC ENERGY COMMISSION

'

l{

,o Q;l

DIRECTORATE OF REGULATCRY CPERATICUS

s,

REGloN II - SulT E 816

$ #k

230 PE ACHT R E E ST R F ET. NoRT MwEST

NArg5 0*

AT L.A NT A, GEORGE A 30303

,

In Reply Refer To:

MAR

2 1973

RO:II:EJV

s

50-302/73-1

.

Florida Power Corporation

Attn:

Mr. J.

T.. Rodgers

Assistant Vice President and

Nuclear Project Manager

3201 34th Street South

P. O. Box 14047

St. Petersburg, Florida

33733

-

.

Gentlemen:

m

This refers to the inspection conducted by Mr. Herdt of this office on

T

. January 23-25, 1973 of activities authorized by AEC Construction Permit

No. CPPR-51 for the Crystal River 3 facility, and 'to the discussion

of our findings held by Mr. Herdt with Mr. Bennett at the conclusion

of the inspection.

-

Areas examined during the inspection included welding and nondestructiss W

testing, concerning the decay heat and makeup and purification systems. -

Within these areas, the inspection consisted of selective examinations

cf procedures and, representative records, interviews with personnel and

observations by the inspectors.

During the inspection, it was four.d that certain of your activities

appear to be in noncompliance with Appendix B to 10 CFR 50 of the

AEC Regulations, " Quality Assurance Criteria for Nuclear Power Plants."

The items and references to the pertinent requirements are identified

in Section I of the enclosure.

This notice is sent to you pursuant to the provisions of Section 2.201

cf the AEC's. " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

20 days of your receipt of this notice, a written statement or explanation

,

in reply including:

(1) corrective steps which have been taken by you,

and the results achieved; (2) corrective steps which will be taken to

p

avoid furtcer violations; and (3) the date when full compliance will be

i

t

j

achieved..

.

8003040

'

,.

.

.

y

l

.

__ _ _ _ _

.-_ . _ _ _ - _ _ ..

. - . -

..

-

'

.

\\

.

-

~

-

,

,.

.

-

-

i

.

' Florida Powe Corporation

-2-

,

,

s

.-

Two new unresolved items resulted from this inspection and are identified

in Section III of the enclosure. These items will be examined during

'

subsequent inspections.

-.

We have also examined actions you have taken with regard to previously

identified unresolved items. The status of these items is identified

in Section IV of the enclosure.

You should note that this letter and your reply to this letter will be

disclosed to the public by being placed in an AEC Public Document Room.

Should you have any questions concerning this letter, you may communicate

directly with this office.

.

Very truly yours,

,

.

.

g

.

(%;

"

d * Director

- I

John G. Davis

.