ML19319C888

From kanterella
Jump to navigation Jump to search
Forwards B&W Deficiency Repts Re Reactor Internals Handling Fixture & Control Rod Drive Control Sys Ac Breaker Cabinets
ML19319C888
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/03/1974
From: Rodgers J
FLORIDA POWER CORP.
To: Knuth D
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19319C884 List:
References
41970, NUDOCS 8003040844
Download: ML19319C888 (1)


Text

^

,3"

/

71 " 0.,

3 r.

. g *J..';%

- m V

s s

-p vusa 1

,N..)

Florida October 3, 1974 e

o 4

Donald F. Knuth, Director The Directorate of Regulatory Operations U. S.-Atomic Energy Commission Washington, D. C.

20545

Subject:

Docket 50-302 Crystal River Unit #3

Dear Mr. Knuth:

Pursuant to Federal Regulation 10 CFR 50.55(e), we wish to advise you of certain deficiencies in the design of equipment supplied by Babcock &

Wilcox Company to Florida Power Corporation for the Crystal River Unit #3 7

NSSS.

1.

A deficiency in the design of the Reactor Internals Handling Fixture.

2.

A deficiency in the design of the Control Rod Drive Control System AC Breaker Cabinets, regarding the method for attachment of the Cabinets to the floor.

In their opinion, they consider that these deficiencies are of sufficient magnitude to qualify as "Significant", in accordance with 10 CFR 50.55(e).

Florida Power Corporation will monitor B&W's corrective action as it pertains to Crystal River Unit #3.

We are enclosing B&W's reports of the two deficiencies.

Very truly yours, ldh J.

. Rodgers Attachments (2)

Assistant Vice President ec:

M. H. Kleinman N. C. Moseley, Director Region II

  • iL *3 6 S -

O

.V

.x

..e. >

General Office 320: Tn.rty-fourtn street sourn. e o. sex 14o42. st. Petersburg. Porida 33733 e 813-866-5151 8 0 0s o<ohy

-.