ML19319C828
| ML19319C828 | |
| Person / Time | |
|---|---|
| Site: | Crystal River |
| Issue date: | 09/06/1974 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19319C819 | List: |
| References | |
| NUDOCS 8003040792 | |
| Download: ML19319C828 (2) | |
See also: IR 05000302/1974011
Text
-__
_ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
_
,
_ ._
.
o
7
.
O
,p,O -) 4
m.
-
-
'
-
u~ireo sr^rcs.
6fr
ATOMIC ENERGY COMMISSION
<[/'/W
". c
isIi2CTORATE OF REGULATOTW OPERATICI!3
I
-
-
U. %(, M '
a c o ,o n is
soir e em
a p Acwi aet sr us t r. NM f H* CST
-
4
y , u , ...,g
. css sa s.4 sos
,,
A T L. A N T A. GE orc A 30 M 3
,
In Reply Refer To:
'
RD:II:LNW
50-302/74-11
.
1
Florida Power Corporation
'
ATTN:
Mr. J. T. Rodgers, Assistant
~
Vice President
Quality and Environmental
'
Departments
'~
3201 34th Street, South
P. O. Box 14042
St. "etersburg, Florida 33733
Gentlemen:
This refers to the inspection conducted by Mr. K. W. Whitt of this office
on August 13-16, 1974, of activities authorized by AEC Construction
Permit No. CPPR-51 for the Crystal River 3 facility, and to the discussion
of our findings held by Mr. Whitt with Messrs. P. G. Davis and P. F. P.cKee
at the conclusion of the inspection.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
Within the scope of this inspection, no violations were disclosed.
We have examinei actions you have taken with regard to previously reported
unresolved items.
These are identified in Section IV of the summary of the
.
enclosed report.
.
Two (2) new unresolved items resulted from this inspection and are identified
l
in Section III of the summnry of the enclosed report. These items will
be examined during subsequent inspections.
In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,
Title 10, code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the AEC's Public Document
Room.
If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
800304
.-
.
.-
,
-
_
'
)
,
.
,
Florida Power Corporation
-2-
-
SEP 6 1974
e
.
this office requesting that such information be withheld from public
disclosure. If no proprietary information is identified, a written
'
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases. for which information is
'
claimed to be proprietary. The application should be prepared so that
information sought to be withheld is incorporated in a separate paper
,
and referenced in the application since the application will be placed
'
in the Public Document Room. Your application, or written statement,
.
should be submitted to us within 20 days.
If we are not contacted as
specified, the enclosed report and this letter may then be placed in the
,
Public Document Room.
,
Should you have any quest 1s
concerning this letter, we will be glad
a
to discuss them with you.
Very 'truly yours,
'
%.
Q Norman C. Mosel
Director
j
-
.
.
Enclosure:
RO Inspection Report No.
j
S0-302/74-11
'
.
a
s
.
l
-
_.
_
_ --
.
-
-.