| Site: | Crystal River |
| Issue date: | 02/19/1975 |
| From: | Moseley N NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Rodgers J FLORIDA POWER CORP. |
| Shared Package | |
| ML19319C722 | List: |
| References | |
| NUDOCS 8003030840 | |
| Download: ML19319C721 (3) | |
See also: IR 05000302/1975002
Text
. _ _ .
_
3
/
4
(
'
/
-
\\
G
.
P
Ltr to Florida Power Corporation fm N. C. Moseley dated TEB 1 9 B75
and IE Inspection Report No. 50-302/75-2
.
DISTRIBUTION:
,
H. D. Thornburg, IE
N AE:HQ (5)
,
Office of Standards Development
Divison of Reactor Licensing (13)
Central Files
,
- PDR
- Local PDR
- NSIC
- State
.
- To be dispatched at a later date
O
1
i
%
4
003030bWo
q
,
- - -
--
-l
-
.
_
_
_
_ _ _ _ _ _ _ _ _ _ _
_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ . _ _ . _ _
.
^
UNITED STATES
.
NUCLEAR REGULATORY COMMISSION
[
REGloN 11
230 PEACHTREE STREET, N. W.
SUITC 010
ATLANTA, GEO RGI A 30303
"
In Reply Refer To:
FEB 191975
IE:II:KWW
50-302/75-2
.
.
F
Florida Power Corporation
4
ATTN:
Mr. J. T. Rodgers, Assistant Vice President
,
'
Quality and Environmental Departments
3201 34th Street, South
,
P. O. Box 14042
.
St. Petersburg, Florida
33733
Gentlemen:
This refers to the inspection conducted by Mr. G. L. Troup of this. office
on January 27-31, 1975, of activities authorized by NRC Construction Permit
No. CPPR-51 for the Crystal River 3 facility, and to the discussion of our
,
findings held by Mr. Troup with Mr. J. R. Wright at the conclusion of the
inspection.
C)
v
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted
of selective examination of procedures and representative records,
interviews with personnel, and observations by the inspector.
"
'
Within the scope of this inspection, no items of noncompliance were disclosed.
Two new unresolved items resulted from this inspection and are identified
in Section III of the summary of the enclosed report. These items will
be examined during subsequent inspections.
,
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room. If this report contains any information that you believe to be
proprietary, it is necessary that you submit a written application to
j
this office requesting that such information be withheld from public
disclosure.
If no proprietary information is identified, a written
statement to that effect should be submitted.
If an application is
submitted, it must fully identify the bases for which information is
i
claimed to be proprietary. The application should be prepared so that
'
'
information sought to be withheld is incorporated in a separate paper
nd referenced in the application since the application will be nldeed
$gotui#o,*'o
D
5;
M SENI IO: :
s
4l
.
maj.
%
y
usIn '
76 19 8
l
gdli h u.
'
W
..
I.
I
-
'
-
-
_, _.
_
_
_
.
_ - . _ _ . , , NE ~
. . _ _ _ .
. _ - _
.
_
. _ _
_ ._ ..
_
a.
~' NB I S 1975
-
.
Florida Power Corporation
-2-
.
in the Public Document Room. Your application, or written statement,
should be submitted to us within 20 days.
If we are not contacted as
-
,
'
specified, the enclosed report and this letter may then be placed in the
Public Document Room.
'
.
Should you have any questions concerning this letter, we will be glad
to discuss them with you.
,
Very truly yours,
.
,/
,,
j
f
"
-
.
,
NormanC.hseley
'-
-
Director
Enclosure:
IE Inspection Report No.
-
.
50-302/75-2
1
1
f
1
.
.
k
$
4
-.-,
. - , .
. - .
.. .
_ , , - -
,
, . _ .
$_ . . -,
_,___.$.,.-.,,.--._.
. _ _ ~ _ _ - - , . - _ . , - . . - , , . ,