ML19319C149

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing AEC of Steps Taken to Correct Violations Noted in Insp Rept 999-019/72-01.Monthly Rept for May 1972 Encl
ML19319C149
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 06/22/1972
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Sampson G
TOLEDO EDISON CO.
Shared Package
ML19319C150 List:
References
REF-QA-99900019 NUDOCS 8001310510
Download: ML19319C149 (2)


Text

gosse r,

/%

~

UNITED STATES y Qv ATOMIC ENERGY COMMISSION

[

OIRECTORATE OF REGULATORY OPERATIONS t

b v

U

  1. '8rts l' 4, REGION lli 799 ROOSEVELT ROAO GLEN ELLYN, ILLINOIS Sol 37 ymmg (312) 854 2860 June 22, 1972 Toledo Edison Company Docket lio. 50-346 Ntri: IIr. 01cnn J. Sampson Vice 2rcoident, Pouer 420 lbdicon Avenue Toledo, Ohio 43601 Contic=cn:

Thank you for your letter dated June 19, 1972, informing us of the stcpc you have tchen to correct the itema of apparent nonconformanco which we brought to your attention in our Iceter dated Iby 22, 1972. Uc vill c:: amino these mattero during our next inspection.

Your cooperation with un is cppreciated.

Sincerely yours, Doyec 11. Grier Pegionni Director cc:

L. E. Poc, Project bec w/1tr dtd 6-19-72:

Enginecr J. B. Henderson, RO II. L. Uadeuorth, General H. D. Thornburg, RO Superintendent R. H. Engelken, R0 J. D. Lcnardcon, Quality G. W. Reinmuth, R0 Accuranco Engineer P. A. Morris, RO W. G. '. oring, Jr., QA A. Giambusso, L Engineer (IIechanicni)

OGC, Beth, P-506A RO Files DR Central Files PDR Local PDR NSIC DTIE t

U 8 0 01310 f/O p

.I

)

m, J

i DIRECr0 RATE OF REGULATORY OPERATIONS M0lffHLY REFORT FOR MAY 1972 i

)

4 r

I i

l 0

h Grinnell Company, Kernersville, North Carolina - An inspection of the vendor's plant was performed on May 10-12 to examine the fabrication of nuclear piping for the Davis-Besse facility.

One item of nonconformance with ASME Code,Section III (1971),

was identified during the inspection involving the lack of Code data report information supplied to the site.

The nonconformance was discussed in Regional correspondence with l

the licensee.

I t

1 l

i n

9

_.. - _.,