Text
O J.
B.
knderson, RO
.t t' c,
/
't UNITED STATES
}y.,. ".
ATOMIC ENERGY COMMISSION i
DIVISION OF COMPLIANCE b,
REGION lll f
tr, g gn 799 ROOSEVELT ROAD ar 7,gg,gogg GLEN ELLYN, ILLINO s 60137 (312) ass-zeso Mcy 22, 1972 Tbledo Edison Company Docket No. 50 '44 ATIN: Mr. Cleon J. Sampeen Vice President, her 420 Medimon Avenes 1 blade, Chie 43'A!1 Gentlemen:
This letter refers to the inopostica conducted by Mr. R. E. 011er of this office at the Crinnell Campany F1snt located in Bernersville, North Carolina, se Itsy 10 - 12, 1972, reisted to constrection activi-ties at the Davis-Besse site authertsed by AEC Constreetion Permit No. CPMb 60 and to the discuestone of our findincs at the (coclusion of the inspectice with Mr. Moring of your staff.
Areas e w ned during the toepection ineladed the purchase specifice-tion, procedures, welding and NDr persormet qualifications, and quality centrol deciesentation reistias to the fabricattaa of nacisme piping. Within thsee areas, the inspection consisted of review of representative recorde sad precedores, intervisse with pimat personnel, end eboervetiese by our inspector.
L% ring this inspection, it wee foemd that a eartain ectivity appesce to be in nonconfes===e= with requireenots of the aechtel Purchase Specificattaa Mo. 7749=# 190, aavision 2, Port 1.
The specific item
.md reference to the pertinent requirasset are listed in the enclosure en this letter. Fleses provide es within M days, in writina, with your cameents regarding this itea, say stepe which beve been or vf.11 he taken to correct it, any steps that have been or vill be taken to present recurrence, and the date all corrective action or preventive usesores were or will be esoptated.
l l
A 8001310 gg g l
Toledo Edison Company May 22, 1972 Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely yours, Boyce H. Grier Begionsi Director
Enclosure:
Description of Item of Nonconformance cc:
L. E. Roe, Project Engineer N. L. Wadsworth, Genersi Superintendent J. A. Ianardson, Quality Assurance Engineer W. G. Moring, Jr., QA Engineer (Mechanical) bcc: J.
B. Henderson, RO R. H. Engelken, RO P. A. Morris, R0 A. Giambusso, L OGC, Be th, P-506A RO Files DR Central Files PDR Local PDR NSIC DTIE i
J ENCLOSURE Docke t No. 50-346 One activity under your construction permit appears to be in noncon-fonsance with requirements of the Bechtel Purchase Specification No.
7749-H-190, Revision 2, Part 1, as indicated below:
The Bechtel specification establishes that, for nuclear piping, the requirements of the ASME Code, Section III-1971, Classes I, II, and III shall include the Code Partial Data Report Forms.
Paragraph NA-8415 of ASME Code, " Piping Subassemblies," states, in part, that " Data reports for piping subassemblies requiring inspection under this subsection shall be executsd on Fone NPP-1 by the subassembly fabricator and the inspector for subassemblies or sections of piping." Exclusions permitted by Paragraph NA-8415 are only that the certification of the design puttion of the fona need not be completed.
Contrary to the above, the NPP-1 data reports, for three lots of component cooling and service water piping (Class III) shipped to the site, were incomplete in that information was not provided in Item 7 of the data reports (class of piping) nor with respect c.
(
to the information required in the Remarks Section in Item 7 of the data reports.