ML19319B937

From kanterella
Jump to navigation Jump to search
Requests Attendance at 770331 Meeting W/Fl Power Corp to Discuss NRC Position on RCS Flow monitoring.Davis-Besse OL Will Be Conditioned in Same Way as Crystal River3
ML19319B937
Person / Time
Site: Crystal River, Davis Besse  
Issue date: 03/28/1977
From: Stolz J
Office of Nuclear Reactor Regulation
To: Roe L
TOLEDO EDISON CO.
References
NUDOCS 8001290672
Download: ML19319B937 (2)


Text

__- _____

/

w DISTRI'90 TION ~

4 Docket File MAh 2 81977 NRC PDR Local PDR LWR-#1 File DBVassallo FJWilliams Cocket No. 50-346 JStolz LEngle EHylton Toledo Edison Coapany ACRS (16)

ATT'!:

"r. Lowell E. Roe ELD Vice President, Facilitics IE (3)

Develegnent HSmith Edison olaza bec: JRBuchanan, NSIC 300 Padison Avenue TBAbernathy, TIC Toledo, Onio 43552 S&.tleen :

S*JBJECT: FORTHCDMIm f2EETING ON REACTOR CCOLA"T SYSTE" FLOW Purs *nt to your letters of January 5,1977, and February 25, 1077, we ht eeby natify you of a forthcoming meeting with the Florida Powr Corporation on " arch 31, 1977, to discuss the staff cosition on reactor coolant systen flows monitoring. A notice of the forthconing T.eeting is orovided in the enclosure to this letter.

He request your attendance at this caeting, if possible, with your 39eropriate representatives. As has been discussed uith you areviously, W olan to condition the Javis-Eessa. I' nit 1 GL license in the sarn

anner as ms done for Crystal 'iver, Unit 3, recardino reactor coolant system flow modification.

Please let us know if you plan to attend this meeting.

Sincerely, Original Signed by John F. Stolz John F. Stol:, Chief Liqht 'fater Reactors Branch Mo.1 Division of Project "anagccent

Enclosure:

Feetinc ?:otice-Florida Pover Corporation P9]O cc: See Page 2 O

O W JU I

D '@~T F

VS-

.k g

(p LWR-#1 LWR-#1

,,,,,,, y LEngle: g JS Q 3/ 3/ V 3/$l77 W u. E eovannmsM PW NTN OFFIC ES m Asom w.,-m AEWfM Dr.H& t M 80012@ d h f

f