ML19319B451

From kanterella
Jump to navigation Jump to search
Ack Receipt of Informing NRC of Steps Taken to Correct Violations Noted in IE Insp Rept 50-346/75-17
ML19319B451
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/11/1975
From: Jordan E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B452 List:
References
NUDOCS 8001220859
Download: ML19319B451 (1)


See also: IR 05000346/1975017

Text

O

e

.-

.

.

,

,

-

-

IEFEE COPM

-

,

,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION til

799 ROOSEVELT ROAD

GLEN ELLYN, ILLINotS 60137

n0V i 1 1975

Toledo Edison Company

Dockat No. 50-346

ATTN: Mr. Lowell Roe

Vice President, Power

Edison Plass

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

Thank you for your latter dated October 31, 1975, informing

us of the steps you have taken to correct the item of non-

complianas and the deviation which we brought to your attention

in our letter dated October 10,.1975. We will

====4n= these

matters during a subsequent inspection.

Your cooperation with us is appreciated.

Sincerely yours,

E. L. Jordan, Acting Chief

Reactor Operations and

Nue1==r Support Branch

bec w/1tr dtd 10/31/75:

PDR

Local PDR

NSIC

TIC

l

I

8 001220 dry

_.

.

_.