ML19319B404
| ML19319B404 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 11/24/1975 |
| From: | Hunnicutt D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19319B385 | List: |
| References | |
| NUDOCS 8001150977 | |
| Download: ML19319B404 (2) | |
See also: IR 05000346/1975020
Text
lf%
y
u p v.
try
~--
,
,
.
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
,
R EGloN. lli
CLEN ELLYN, ILLINOIS 60137
sqv 2 4 1975
Toledo Edison Company
Docket No. 50-346
ATTN:
Mr. Lowell E, Roe
Vice President
Facilities Development
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen:
This refers to the inspection conducted by Messrs. Sutton and
Yin of this office on October 29-30, 1975, of activities at
Davis-Besse Nuclear Power Station Unit 1 authorized by URC
Construction Permit No. CPPR-80 and to the discussion of our
findings with you, Mr. Lenardson, and others of yo W staff
at the conclusion of the inspection.
g
tL
A copy of our report of this inspection is enclosed and identi-
fies the areas examined during the inspection. Within these
areas, the inspection consisted of a selective examination of
procedures and representative records, interviews with plant
personnel, and observations by the inspectors.
No items of noncompliance with NRC requirements were identi-
fled within the scope of this inspection.
In accordance sith Section 2.790 of the NRC's " Rules of
Practice," Part 2, Title 10, Code of Federal Regulations, a
copy of this letter and the .:nclosed inspection report will
be placed in the NRC's Public Document Room.
If this report
contains any information that you or your contractors believe
to be proprietary, it is necessary that you make a written
application to this office, within twenty days of your
receipt of this letter, to withhold such information from
public disclosure.
Any such application must include a full
statement of the reasons for which it is claimed that the
-
h5s
%*
CON ";3
h310-
. . .:-
11C-
8001150
7
-
-
-.
.__
-_
- - -
.
.
,
,
.
.
.
Toledo Edinon Company
-2-
.
_
information la proprietary, and should be prepared so the
proprietary infor=ation identified in the application in
contained in a separate part of the document. Unless we
receive an application to withhold infor=stion or arc other-
,
wice contacted within the specified time period, the written
material identified in this paragraph will be placed in the
Public Document Room.
The inspector cico cr.crined cetions you have taken with respect
to the tattern identified in yeer letters dated August 28,
Septeraer 8 and cetober 9,1975. which va previously brought to
your ettention. We hcve no further questions regarding these
matters.
No reply to thic letter is occescary; however, should you
have any que:tiona concerning thic incpection, we vill be
glad to discucs then with you.
Sincerely yours,
O
D. M. Hunnicutt, Chief
Reactor Construction r.nd
Engineering Support Branch
Enclosure:
IE Inspection Rpt No.
050-346/75-20
bec w/ encl:
Local PDR
U. Young Park, Nuclear
Engineer
.
V
.
.
em ***eeee euem.e ,
e
,_
_