Forwards Insp Rept 50-346/75-20 on 751029-30. No Noncompliance Noted
ML19319B404
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 11/24/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19319B385 List:
References
NUDOCS 8001150977
Download: ML19319B404 (2)


See also: IR 05000346/1975020

Text

lf%

y

u p v.

try

~--

,

,

.

.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

,

R EGloN. lli

799 ROOSEVELT RO AD

CLEN ELLYN, ILLINOIS 60137

sqv 2 4 1975

Toledo Edison Company

Docket No. 50-346

ATTN:

Mr. Lowell E, Roe

Vice President

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Gentlemen:

This refers to the inspection conducted by Messrs. Sutton and

Yin of this office on October 29-30, 1975, of activities at

Davis-Besse Nuclear Power Station Unit 1 authorized by URC

Construction Permit No. CPPR-80 and to the discussion of our

findings with you, Mr. Lenardson, and others of yo W staff

at the conclusion of the inspection.

g

tL

A copy of our report of this inspection is enclosed and identi-

fies the areas examined during the inspection. Within these

areas, the inspection consisted of a selective examination of

procedures and representative records, interviews with plant

personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identi-

fled within the scope of this inspection.

In accordance sith Section 2.790 of the NRC's " Rules of

Practice," Part 2, Title 10, Code of Federal Regulations, a

copy of this letter and the .:nclosed inspection report will

be placed in the NRC's Public Document Room.

If this report

contains any information that you or your contractors believe

to be proprietary, it is necessary that you make a written

application to this office, within twenty days of your

receipt of this letter, to withhold such information from

public disclosure.

Any such application must include a full

statement of the reasons for which it is claimed that the

-

h5s

%*

CON ";3

h310-

. . .:-

11C-

8001150

7

-

-

-.

.__

-_

- - -

.

.

,

,

.

.

.

Toledo Edinon Company

-2-

.

_

information la proprietary, and should be prepared so the

proprietary infor=ation identified in the application in

contained in a separate part of the document. Unless we

receive an application to withhold infor=stion or arc other-

,

wice contacted within the specified time period, the written

material identified in this paragraph will be placed in the

Public Document Room.

The inspector cico cr.crined cetions you have taken with respect

to the tattern identified in yeer letters dated August 28,

Septeraer 8 and cetober 9,1975. which va previously brought to

your ettention. We hcve no further questions regarding these

matters.

No reply to thic letter is occescary; however, should you

have any que:tiona concerning thic incpection, we vill be

glad to discucs then with you.

Sincerely yours,

O

D. M. Hunnicutt, Chief

Reactor Construction r.nd

Engineering Support Branch

Enclosure:

IE Inspection Rpt No.

050-346/75-20

bec w/ encl:

PDR

Local PDR

NSIC

TIC

U. Young Park, Nuclear

Engineer

.

V

.

.

em ***eeee euem.e ,

e

,_

_