Ack Receipt of Responding to NRC Request for Confirmation of Several Commitments.Based on 800528 Telcon, NRC Understands That Environ Air Samples Discussed in Ltr Have Been Calibr Using Approved Procedures
ML19318C517
Person / Time
Site: Oyster Creek
Issue date: 06/05/1980
From: Grier B
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
References
NUDOCS 8007010565
Download: ML19318C517 (1)


Text

T$s g.

d c

UNITED STATES '

y

~'g NUCLEAR REGULATORY COMMisslON j

j REGION I se g

$31 PARK AVENUE KING OF PRUSSI A. PENNSYLVANI A 19406

--ju 3 5 ING D:cket No. 50-219 Jersey Central Power and Light Company ATTN: Mr. Ivan R. Finfrock, Jr.

.Vice President Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 Gentlemen:

Subject:

Your letter of May 19, 1980 to Mr. Victor Stello, Jr., Director, Office of Inspection and Enforcement This refers your letter dated May 19, 1980, in response to our request for written confi.1 nation of several commitments which were made by members of your operating organization at the April 29, 1980 management meeting held at this office.

With respect to your letter, it is our. understanding, based on a May 28, 1980 telephone conversation between R. L. Nimitz of this office and Mr. J. Carroll, Jr., of your staff, the environmental air samplers discussed in your letter have been calibrated utilizing approved procedures and will be in place by June 30, 1980.

Your cooperation with us is appreciated.

Sincerely, l

.h&v]

a gCC & i,

Boyce H. Grier Director cc:

J. T. Carroll, Station Superintendent 4

8007010 $

r tg

--- pigy[I" y' A Jersey Central Power & Light Company C8 Madison Avenue at Punch Bowl Road

'.'a d

  1. 8 Morristown. New Jersey 07960 M

d-(201)455-8200 May 19, 1980 Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stello:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Inspection Report No. 50-219/79-18 This letter is to bring to your attention certain clarifications, corrections and additions to my letter of March 17, 1980 in which JCPSL submitt i formal responses to the findings of the inspection conducted by the NRC Performance Appraisal Branch (PAB).

Enclosed as Enclosure A are the corrections to the original submittal.

These were discussed in our meeting of April 29, 1980 with representatives of the NRC's Region I in King of Prussia.

If there are any questions regarding the enclosed information or additional information is required, please contact me.

Very truly yours, J'

Ivan R. Fin ek, r.

Vice President la Enclosures s'cc : Boyce H. Grier, Director U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406 U

S.

OQ

(

O Jersey Central Power & Light Company is a Member of the General Public Utilities System

=

ENCLOSURE A I.

Attachment A to the 3/17/80 Letter.

.In response to the item of noncompliance 5, page 11, " calibration procedures had not been written and implemented as of November 2, 1979", a response to the finding for the environmental air ' samplers was inadvertently left out.

In respoase, the item of noncompliance is correct as state:..

New air sampling systems were purchased in 197.0 ;- -11 sampling stations.

They were. received with t

'g gas meters which'had to be replaced.

. e"s have been received.

The changeout The co.

of the a -

ng systems will be completed by

~

June 30, IL80.

At that time completed procedures and. schedules for calibration will be implemented.

.In response to iten of noncompliance B.6, page 8, for the corrective actions to be taken, a completion date of September 1, 1981 was given. The date should be September 1, 1980.

II.

At1 chment B to the 3/17/80 Letter.

-.In Attachment B, page 9, it is stated that the Ra'dwaste Shipping Supervisor Position will be filled by May 1, 1980.

On page 3S of the same attachment the date given is August 1, 1980.

The correct date is May 1, 1980.

An acting Radwaste Shipping Supervisor was appointed on April 23, 1980.

. Attachment B, Page 21 - In describing the organizational structure for the reorganized radiation protection program, it was not explicitly stated who the Supervisor-Radiation i"

Protection reported to in the organization.

This position will report directly to the Station Manager assuming the i

Technical Specification Change Request No. 8S submitted

.May 2, 1980 is approved.

A copy of that request is i

attached.

i

.v.

v-e I

Jersey Central Pov.er & Lig. Company

- ").hl

, I-

)

Madrson Avenue at Punch Scut Road.

~*

I Morristown. New Jefsey 07960 m a, (201)455-8200 May 2, 1980 1

Director Nuclear Reactor Regulation United States Nuclear Regulatory Commission

.; ashing ton ; DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 i

Technical Specification Change Request No. 85 In accordance with 10 CFR 50.59 and 10 CFR 50.90, Jersey Central Power & Light Company, owner and operator of the Oyster Creek' Nuclear Generating Station, Provisional Operating License No. DPR-16, requests changes to Appendix A.of that license.

This Technical Specification Change will, when approved, provide he highest level of station management attention to our Radiation Protection program, and establish a Manager of Training position that will result in improvemen'_s and control over all Gereration Division training.

This Technical Specification Change Request has been reviewed and approved by the Station Manager, the Plant Operations Review Committee, and an Independent Safety Review Group in accordance with Section 6.5 of the Oys ter Cree k Technical Specifications.

We have determined that this submittal is C1' ass II per 10 CFR 107.22 and have enclosed a check for $1200.00 pursuant to that section.

Very truly yours,

/)]

y Ivan R.

Fi ro

, Jr.

Vice Presi ent i-9O G o d O f O /( 6 Jesey Central Power 2. LGht Company ts a IAember of tr.e General FAbc Utihres System

JERSEY CENTRAL POWER & LIGHT COMPANY OYSTER CREEK HUCLEAR GENERATING STATION (DOCKET NO. 50-219)

PROVIS10flAL OPERATING LICENSE NO. DFR-16_

Applicant hereby requests the Commission to change Appendix A to the above-captioned license as follows:

1.

Sections to be changed Sections 6.3,.6.4, and 6.5 2.

Extent of Changes This change incorporates the prohosed changes for the facility staf f reorganization.

3 Changes requested Replace Section 6, Pages 6-2a, 6-2b, 6-3, 6-4, and 6-6 of revised Section 6 pages.

4.

Discussion Changes to the plant and Generation Organization are being made in an The effort to improve key functional areas at the Oyster Creek Station.

first organizational change involves the addition of a fianager of Training reporting directly to the Vice President, Generation with the station training functions reporting to him.

It is felt this will broaden the for the expanding puspective of training and provide better support

  • Lining needs of the Station.

second organizational change involves a reorganization of the The Radiation Protection fun'ccion ai the Station. The Supervisor, Radistion The Radiation Protection will now report di rectly to the Station Manager.

Protection staf f has also been expanded in order to provide a higher level of protection in the Health Physics area.

f The final organizational change directs the Fire Protection Supervisor to j

report to the Plant Support Superintendent.

The importance and complexity of fire protection and prevention at Oyster Creek requires this indis.idual be placed at this level within the organization to assure adequate attention is given to this area.

2' AMTw eng w,ysap p e; s

DUPLICATE DOCUMENT Entire document previously entered into system under:

ANO TO(1ToloOl37 No. of pages: