Text
. _ - _ _ _ _ _ _ _
. <. y fggg UNITED STATES
]A 8
NUCLEAR REGULATORY COMMISSION 3
p WASHINGTON, D. C. 20555
%,,n og#
June 19,1980 Docket No. 50-293 Mr. G. Carl Andognini Boston Edison Company M/C NUCLEAR 800 Boylston Street Boston, Massachusetts 02199
Dear Mr. Andognini:
Enclosed is an updated table of fire protection issues that have an incomplete status, followed by a preliminary fire protection review report. Most of the issues presented are under continuing review by our staff or our consultants. The remaining issues have been found to require additional information. For those items requiring additional information, the preliminary fira protection review report identifies supplemental information/ modifications that would resolve those issues.
We expect to have all reviews completed by mid-July, at which time we may request to meet with you to discuss any remaining outstanding issues. Please contact your Project Manager if you have any questions.
Sincerely, 4
o
, Chief Operating Reattors Branch #2 Division of Licensing
Enclosures:
1.
Fire Protection SER Supplement 2.
Fire Protection Review cc: See next page 8007010
i Mr. G. Carl Andognini Boston Edison Company June 19,1980 i
cc:
Mr. Paul J. McGuire Pilgrim Station Acting Manager Boston Edison Company RFD #1, Rocky Hill Road Plymouth, Massachusetts 02360 Henry Herrmann, Esquire Massachusetts Wildlife Federation 151 Tremont Street Boston, Massachusetts 02111 Plymouth Public Library North Street Plymouth, Massachusetts 02360 Resident Inspector c/o U. S. NRC P. O. Box 867 Plymouth, Massachusetts 02360
-e
PILGRIM, UNIT 1 - FIRE PROTECTION SER SUPPLEMENT LIST OF SUBMITTALS AND STATUS OF ASSOCIATED ISSUES AS OF JUNE 12, 1980 SER SECTION SUBJECT ISSUE SUBMITTAL STATUS 3.1.16 Breathing Apparatus 1-16-79, 2-5-79, R
3-30-79, 7-6-79 3.1.17 Communication Systems 3-14-79 R
3.1.18 Alternate Shutdown 3-30-79, 7-6-79, Capability 10-5-79, 1-31-80, 3-12-80 3.1.19 Penetration Seals 3-30-79, 7-6-79, 10-10-79, 5-29-80 3.2.1 Safe Shutdown Analysis 10-16-79, 1-21-80 3-12-80 3.2.2 Testing Fire Detectors 2-29-80, 5-14-80 3.2.4 Cable Combustibility 3-5-80 3.2.6 Charcoal Fire in A0GS 1-16-79, 2-5-79 7-6-79 3.2.7 D. C. Power System 2-1-79 R
Hazard Analysis 3.2.8 CO2 System Discharge Test 2-29-80 R - Requirement for additional information/ modification
- - Issue is currently under review 1
g an.
Af NLPA.)
[
UNITED STATES
(,_
o
- y g/(/['g-NOCLEAR REGULATORY COMMISSION ~
,c c.
.-I WASHINGTcN. D. C. 20555 b
FEB 141980 MEMORANDUM FOR:
T. Ippo' 'to, Chief, Operating Reactors Branch #3, Divi. on of Operating Reactors FROM:
G. Lainas, Chief, Plant Systems Branch, Division of Operating Reactors
SUBJECT:
FIRE PROTECTION REVIEW - PILGRIM, UNIT 1 Facility: Pilgrim, Unit 1 Docket No.: 50-293 Licensee:
Boston Edison Company Responsible Branch: ORB #3 Project Manager:
J. Hannon Reviewing Branch: Plant Systems Status of Review: See Enclosure 1.
Our evaluation of the licensee's submittals listed in Enclosure 1 is complete. The results of our evaluaticn are attached (Enclosures 2 and 3). presents our evaluation of issues that are complete. presents our evaluation for which the licensee's proposals are unacceptable and indicates requirements that would resolve the issue. We request that a meeting be arranged with the licensee within 30 days to resolve outscanding issues identified in Enclosure 3.
Current status of the SER supplement items is summarized in Enclosure 1.
d4%>o G. Lainas, Chief Plant Systems Branch Division of Operating Reactors
Enclosures:
1.
Status 2.
Evaluation of Items -
Compiete 3.
Evaluation of Items -
Unacceptable
Contact:
T. Lee, X27878 cc:
See next page d4 e.
7 d>B d7d>dY P (T*****
~'
' " " ' * ' " ' ~ ~
~
' * ' ' * ^ ~ ~ ~ ~ ' ' ' ' ~ ~ *
(
(-
FEB 141980 T. Ippolito,
cc w/ enclosures:
D. Eisenhut W. Gamill S. Hanauer V. Benaroya R. Ferguson T. Lee P. Matthews J. Hannon T. Wartach
. R. Hall (BNL)
E. MacDougall (BNL)
J. Klevan (Consultant) s 3
I
(.
n-g.
ar e
n
--w'
--=-----we--w--
e----e-r+
-w--
ENCLOSURF 1 7
PILGRIM, UNIT 1 - FIRE PROTECT!0_N SER SUPPLEMENT LIST OF SUBMITTALS AND STATUS OF ASSOCIATED ISSUES SER SECTIO.';
SUBJECT ISSUE SUBMITTAL STATUS 3.1.14 Exposed Structural Steel 3/14/79, 7/6/79 C
3.1.16 Bresthing Apparatus 1/16/79, 2/5/79, 3/30/79, 7/6/79 R
3.1.17 Communication Systems 3/14/79 R
3.1.13 Alternate Shutdown Capability 10/5/79 I*
3.1.19 Penetration Seals 3/30/79, 7/6/79, 10/10/79 R
3.2.1 Safe Shutdown Analysis I*
3.2.2 Testing Fire Detectors I*
3.2.3 Battery Room Ventilation Airflow Monitor 1/16/79, 2/5/79, 3/14/79, 7/6/79 C
3.2.4 Cable Combustibility I*
3.2.5 Spread of Combustible Liquid Fire via Drain 2/20/79 C
3.2.6 Charcoal Fire in A0GS 1/16/79, 2/5/79, 7/6/79 I**
3.2.7 DC Power System Hazard Analysis 2/1/79 R
3.2.8 CO2 System Discharge Test I*
C - Complete I - Incomplete R - Requirement
- The licensee's response either has not been received, or is incomplete.
- - L. Barrett of Environmental Evaluation Branch was requested on January 17, 1980 to evaluate the licensee's submittal on this issue.
- wY y
4
+
ENCLO'"RE 2
~
=
.=
PILGRIM, UNIT 1 - FIRE PROTECTION SER SUPPLEMENT EVALUATION OF SUPPLEMENT ITEMS THAT ARE COMPLETE 3.1.14 Exposed Steel Protection SER Section 3.1.14 indicates that exposed structural steel will be protected by coatings to provide three hour fire protection in those plant areas where the failure of the steel might affect safe plant shutdown.
By letter dated March 14, 1979 the licensee proposed to provide three hour rated fire protection for exposed structural steel in various areas of the plant. These areas include the recirculating pump motor-generator set room on elevation 51 feet, the cable spreading room, switchgear rooms A and B, and major parts of the reactor building open areas on elevation 23 feet. The licensee proposed to apply a chloride, sulfide and asbestos-free fire-proofing material in accordance with basic designs shown by UL tests to provide three hour rated fire resistance for beams and columns.
The staff determined from its review of the design information provided by the licensee that.
o The licensee had not proposed to fireproof steel rods and other attachments to beams, which could conduct heat to the otherwise protected beams.
o The proposed fireproofing designs were not appliceble to certain small beams and columns in several plant areas.
Therefore, the thickness of the fireproofing cocoound might not be sufficient to provide a three hour fire resistance rating for these structural members, o The licensee had proposed to leave st'ructural steel in part of the reactor building open area without fireproofing.
By letter dated July 6,1979, the licensee provided additional design details on the proposed fire proofing, and indicated that fireproofing of additional parts of the reactor building open area was being considered.
By conference call of October 12, 1979, the licensee also indicated that two different fireproofing compounds would be applied to columns in the following manner: