ML19318A563
| ML19318A563 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 05/16/1980 |
| From: | Murphy C NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Parker W DUKE POWER CO. |
| Shared Package | |
| ML19318A559 | List: |
| References | |
| NUDOCS 8006230367 | |
| Download: ML19318A563 (2) | |
See also: IR 05000369/1980007
Text
_
_ . _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _
.
.
i
/
UNITED STATES
'#
8
o,i
'
NUCLEAR REGULATORY COMMISSION
4
5
REGION il
e
101 MARIETTA ST., N.W SUITE 3100
o
ATLANTA. GEORGIA 30303
e
NAY 161980
In Reply Refer To:
-
RII:RJH
50-369/80-7
50-370/80-4
Duke Power Company
ATTN:
W. O. Parker, Jr.
Vice President, Steam Production
P. O. Box 2178
C,harlotte, NC 28242
Gentlemen:
This refers to the inspection conducted by R. J. Hardwick, Jr., of this office
on April 30 through May 2,1980 of activities authorized by NRC Construction
Permit Nos. CPPR-83 and CPPR-84 for the McGuire Nuclear facility, and to the
discussion of our findings held with K. S. Canady at the conclusion of the
inspection.
Areas examined during thi inspection and our findings arc discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
,
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
?
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placid in the NRC's Public Document Room.
If this
report contains any informatic that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
to this office to withhold such information from public disclosure. Any such
application must include a full statement of the reasons on the basis of which
it is claimed that the information is proprietary, and should be prepared so
that proprietary information identified in the application is contained in a
i
separate part of the document.
If we do not hear from you in this regard within
{
the specified period, the report will be placed in the Public Document Room.
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
Sincerely,
.
C. E. Murphy, Chief
Reactor Construction and
Engineering Support Branch
l
Enclosures:
(See Page 2)
8006230367
l
1
.
.
.,
.:
,
Duke-Power Company
-2-
' " ' '
-
4
E 161980
'
J
Enclosures:
-Inspection Report Nos. 50-369/80-7
and 50-370/80-4
cc w/ encl:
M. D. McIntosh, Plant Manager
P. O. Box 488
Cornelius, NC 28031
s
J. C. Rogers, Project Manager
P. O. Box 33189
Charlotte. NC 28242
,