Notice of Violation from Insp on 800331-0402
ML19318A501
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/30/1980
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To:
Shared Package
ML19318A484 List:
References
50-321-80-18, 50-366-80-18, NUDOCS 8006230232
Download: ML19318A501 (1)


Text

_ _ _ _ - - _ - _ _ _ _ _

O APPENDIX A NOTICE OF VIOLATION Georgia-Power-Company License No. NPF-5 Plant Hatch Based on the NRC inspection March 31 through April 2,1980, certain of your acti-vities were apparently not conducted in full compliance with NRC requirements as indicated below. These items have been categorized as described in correspondence to you dated December 31, 1974.

As required by Technical Specification 6.8.1, written procedures are required to be established and implemented covering test activities of safety related equipment. Plant procedure HNP-809, Plant Modification, states that func-tional tests that are more than simple tests that can be described on the Maintenance Request must be provided a written and approved functional test procedure.

Contrary to the above, the functional test performed on January 16, 1980, was not tir ely nor adequate to determine that a modification involving the Rod Sequence Control System (RSCS) and completed on December 2,1979, during power operation, had defeated the RSCS notch control mode of operation. The RSCS was subsequent.ly found inoperable by the licensee on January 29, 1980.

This is an infraction.