ML19318A498

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/80-18 & 50-366/80-18 on 800331-0402 & Notice of Violation
ML19318A498
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/30/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19318A484 List:
References
NUDOCS 8006230228
Download: ML19318A498 (2)


See also: IR 05000321/1980018

Text

. .

-

_

..

.

.

8(

jo,,

UNITED STATES

NUCLEAR REGULATORY COMMISSION

.

o

$

E

'

!

q *e

REGION il

o%.....[

ios uAnitTTA sr w.w susTE 3100

ATI.ANTA, GEORGIA 3o3o3

.

<

In Reply Refer To:

APR 3 01980

RII:HCD

50-321/80-18

50-366/80-18

Georgia Power Company

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

,

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by H. C. Dance of this office on March 31

,

to April 2, 1980 of activities authorized by NRC Operating License No. DPR-57

j

and License No. NPF-5 for the Plant Hatch facility, and to the discussion of our

findings held with W. A. Widner and M. Hanry at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

=

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

During the inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. This item and references

to pertinent requirements are listed in the Notice of Violation enclosed herewith

as Appendix A.

This notice is sent to you pursuant to the provisions of Section

2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office, within 20 days of

your receipt of this notice, a written statement or explanation in reply including:

(1) corrective steps which have been taken by you and the results achieved; (2)

corrective steps which will be taken to avoid further noncompliance; and (3) the

date when full compliance will be achieved.

.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

'

report will be placed in the NRC's Public Document Room. _If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

4

h

.

O

8 00es 30 22.8

<

,.

.

APR 3 01980

' Georgia Power Company

-2-

,

the information is proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this_ letter,_we_will_be._ glad _to_ discuss

___

them with you.

Sincerely,

>

E c.

R. C. Lewis, Acting Chief

Reactor Operations and Nuclear

Support-Branch

- - ---

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report Nos. 50-321/80-18

and 50-366/80-18

cc w/ enc 1:

M. Manry, Plant Manager

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

-

-

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

Nuclear Generation

Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

l

v

.

E

%

?h

.

l

_

.m--

r-

w