ML19317G329

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-302/75-14 on 750929-30 & 1001.No Noncompliance Noted
ML19317G329
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 10/17/1975
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Rodgers J
FLORIDA POWER CORP.
Shared Package
ML19317G330 List:
References
NUDOCS 8002280936
Download: ML19317G329 (2)


See also: IR 05000302/1975014

Text

___

___

a

UNITE 3 STATES

g

,

,

,

,

,

NUCLEAR REGULATORY COMMIS.C 'I

h

'

' **

-

REGION 11

g

j

j Reply Refer To:

230 PcAcHrsice sincer, n. w. suite ::

f

l

ARANTA. CcO RGI A 30303

O

\\ s :II:EJV

50-302/75-14

OCT I 7 E

.

.

Florida Power Corporation

ATTN: Mr. J. T. Rodgers

Assistant Vice President

,

Quality and Environmental Depts.

320L 34th Steet, South

P. O. Box 14042

-

St. Petersburg, Florida

33733

.

Gentlemen:

-

.

T!ais refers to the inspection conducted by Mr. E. J. Vallish of this

office on September 29-30 through October 1, 1975, of activities

-

authorized by NRC Construction Permit No. CPPR-51 for the Crystal

,

River Unit 3 facility, and to the discussion of our findings held

with Mr. J. Alberdi at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examination of procedures and representative records, interviews

[

with personnel, and observations by the inspector.

'

Within the scope of this inspection, no items of noncomplirnce were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

aad the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any infor=ation that you believe

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

disclosure.

If no proprietary infor=ation is identified, a written

- '

aiatement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary.

The application should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the enclosed report and this letter cay then be placed in

the Public. Document Room.

-

dim'

qotOTIo4

c

.

f

  1. 'o

'

l

-}

m

h

_,

.

\\.

.,

    1. 76 19 N

8002 eso 13 6

-

9

<

~

_

_

_

_ _ . _ _ _ _ _ _ - . _ - - - - - - _ _ _ _ _

-

'

.

.

.

.

,

.- )

,

.,

,

,

'

Florida Power Corporation-

-2-

, g. 4/5

.

Should you have any questions concerning this letter, we will be glad to

discuss them with you.

'

t

i

Very truly yours,

.

,

/4 f

/.

s,gy n -. ~

/-

'

Norman C. Moseley

,

Director

-

'

Enclosure:

.

-

t

IE Inspection Report No.

50-302/75-14 ;'

"

/

l

.<

,.

  • .

I

-

.

(

'

s

'

.,

'.

,

.

l

i

,

T

-

lPeea

'

  1. JJ K

,

.m 'a m a y' A

n

W

.. S_ l

3

-

.

-

- - . - ..

- . . .

. 1