Forwards IE Insp Rept 50-302/77-11 on 770614-17 & 27-30 & Notice of Violation
ML19317G226
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 07/19/1977
From: Long F
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Stewart W
FLORIDA POWER CORP.
Shared Package
ML19317G219 List:
References
NUDOCS 8002280859
Download: ML19317G226 (2)


See also: IR 05000302/1977011

Text

_

.

.o !

'

-

UNITED STATES

Y

/p* "%g

o

NUCLEAR REGULATORY COMMISSION

. FILE CDP'/

g

[

R EGloN il

.g.,

g

s

g

230 PEACHTREE STREET. N.W. SulTE 1217

"

.-

[

ATLANTA. GEORGIA 30303

,

o

\\ '... . /

JUL 191977

+

In Reply Refer To:

RII:TNE

50-302/77-11

Florida Power Corporation

Attn:

Mr. W. P. Stewart, Director

Power Production

P. O. Box 14042, Mail Stop C-4

St. Petersburg, Florida

33733

Gentlemen:

This refers to the inspection conducted by Mr. T. N. Epps of this office

on June 14-17 and 27-30, 1977, of activitie. authorized by NRC Operating

.

License No. DPR-72 for the Crystal River-3 facility, and to the discussion

of our findings held with Mr. G. P. Beatty, Jr. at the conclusion of the

inspection.

Areas examtned during the inspection and our findings are discussed in

the attached inspection report. Within these areas, the inspection

consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspector.

During the inspection, it was found

at certain activities under your

license appear to be in noncompliance with NRC requiremeats. This item

,

and references to pertinent requirements are listed in the attached

Notice of Violation to this letter. This notice is sent to you pursuant

to the provisions of Section 2.201 of the NRC's " Rules of Practice,"

l

Part 2, Title 10, Code of Federal Regulations. Section 2.201 requires

you to submit to this office, within 20 days of your receipt of this

notice, e '<ritten statement or explanation in reply including:

(1)

c.orrective steps which have been taken by you, and the results achieved;

(2) corrective steps which will be taken to avoid further noncompliance;

',

and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's "Eules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter

and the attached inspection report will be placed in the NRC's Public

Document Room. If thh. report contains any information that ~ou believe

,

to be proprietary, it is necessary that you submit a written application

to this office requesting that such information be withheld from public

disclosure. If no proprietary information is identified, a written

n

v

80C2 280 Wf

..

, -

, > , .

-,-

,w..,

- --

,.-e

a

,,

,.,m

,

.,

. . , ,

...

.

-

_

-_

_ _ . -

.

JUL 1 y u y

.

.'

~

.

.

.

Florida Power Corporation

- 2-

.

.

statement to that effect should be submitted.

If an application is

submitted, it must fully identify the bases for which information is

claimed to be proprietary. The application should be prepared so that

i

information sought to be withheld is incorpo ated in a separate paper

and referenced in the application since the application will be placed

in the Public Document Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

specified, the attached report and this letter may then be placed in

the Public Document Room.

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

_I

v[

F. J. Long. Chief

Reactor Operations and Nuclear

Support Branch

.