ML19317G188

From kanterella
Jump to navigation Jump to search
Forwards RO-77-84
Date released: 11/27/2019 Download: ML19317G188


RO-77-84:on 770713,discovered That Unit 3 Not Notified of 770706 Unit 1 & 2 Failure.Caused by Personnel Error.Tests Not Meeting Acceptance Criteria Constitute Inoperability. Personnel Instructed in Tech Spec Requirement Procedures
ML19317G189
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/05/1977
From: Stewart W
FLORIDA POWER CORP.
To:
References
Download: ML19317G189 (2)
Forwards RO-77-84
ML19317G187
Person / Time
Site: Crystal River Duke Energy icon.png
Issue date: 08/05/1977
From: Stewart W
FLORIDA POWER CORP.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19317G187 (1)