ML19317F991
| ML19317F991 | |
| Person / Time | |
|---|---|
| Site: | Rancho Seco |
| Issue date: | 06/19/1973 |
| From: | Spencer G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V) |
| To: | Thornburg H US ATOMIC ENERGY COMMISSION (AEC) |
| Shared Package | |
| ML19317F950 | List: |
| References | |
| NUDOCS 8002210693 | |
| Download: ML19317F991 (1) | |
See also: IR 05000312/1973003
Text
'
4 -
/
b
,.
UNITED STATES
I
/'D '
j. "
"*g
ATOMIC ENERGY COMMISSION
7 h[)h
u)
.m@.71
e
7g
oinscronare or arous.arony oranarious
t
n.oio -
.
N
2111 S ANCROFT WAY
b
h
,[
BERKELEY. CALIFORNI A 94704
e
, , , , , , , , , , , , , , , ,
. n....
,,,,g,
h
JUN 19 1973
H.'D..Thornburg, Chief
Field Support and Enforcement Branch
Directorate of Regulatory Operations, HQ
SACRAMENTO MUNICIPAL UTILITY DISTRICT (RANCHO SECO)
DOCKET NO. 050-0312
The attached report by our field inspector of a visit to the subject facility
is for'arded for resolution of the licensee's proposed
on May 30-31, 1973
w
sequence of testing related to the containment building. The proposed
test sequence differs from that described in Preoperational Testing Guide
No. R0-1-73.
The inspection also disclosed that separate procedures have not been developed
for all activities suggested in Appendix A of AEC Safety Guide 33.
However,
the licensee's overall procedure breakdown and system appeared to satisfy the
intent of the Safety Guide in that necessary actions to combat emergencies
p
have been addressed within the overall procedural system for operating the
g
station.
A
,b
~cLu
G. S. Spencer, Chief
Reactor Construction and
Operations Branch
Enclosure:
RO Inspection Rpt. No. 050-0312/73-03
by A. D. Johnson (21 copies)
,