Text
-
g^@l'id j
R. H. Engelken, 3
J' L 2 1973 J
v FS&EB ACTION CONTROL FORM A.
Action Code M-107 i
Name of Licensee and Facility SacramentoMunicipalUtilityDistrict(RanchoSeco)j Docket No. or License No.
50-0312 j
Title containment Leak Test Sequence Origin. RO:V Date Rec'd 6/27/73 i
B.
FS&EB Branch Coordinator:
Bryan Dreher Ellis X
PauluA Completion Requested by C.
Action Requested of:
ADREMP M&PPOB EPB RPB ADC0 X OB CB TAB 00E Region Date Requested 6/29/73 Completion Requested by 7/1/71 Reference Paragraph 6 of the Details in the attached reoort.
D.
Action Requested The licensee's proposed. procedure to measure the leakage rate of the containment is consistant with the provisions of 10 CFR 50 Appendix J and the requirements of the licensee's FSAR but the procedure differs f rom the PREOPERATION!.L TESTING GUIDE NO. R0-1-73 in that the licensees pressure (30 psig) level before making the structural test at 68 psig.
Please maka a technical evaluation as to the adequacy of performing the tests in this sequence.
E.
Date Action Completed Close-out (Date & Method)
Comments: If completion date is not consistent with your werk schedule, please let us know.
t
/
/*
N*
W/
Harold D. Thornburg, C ef Field Support & Enforcement Branch Regulatory Operations cc: D. F. Knuth, RO R. W. Smith, RO:V ooowo G/