ML19317F658
| ML19317F658 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 04/22/1977 |
| From: | Boyd R Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19317F651 | List: |
| References | |
| NUDOCS 8001230553 | |
| Download: ML19317F658 (19) | |
Text
<
GG D
D wa m,
TiiE TOL3V EDL5C 3 CCt!PN3 k
b c
JL Q
.E THE CLf. VELA:!D ELECMIC ILLRiI?IATI;JG Cat _P.WI_
DOCKET IV. 50-346 DN/IS _BESSE 1" M' POiCR STATIGI, U 3IT l0. l F14ILITl' OPEFATING LICCGC License uo. NPF-3 1.
c.e Wuclear Iegulatcry Cer:nicslon (ene Cocraission) having fcend that:
A.
The apclication for license filed by the Toledo :Misen Conpany and the Cleveland Electric Illu::rinating Comparrf (the licenrec) comp 1ies sirn the str.mdard.s and requirerents of the Ato.7.ic Energy Act of 1954, as attended (tne Act), ar.d the Com::ission's rules an't regulattens cot fortn in 10 CFR Chapter I and all recuired notifistions to other agancies or bodies have oeen duly made; 3.
Constructicn of the Davis.3 esse lJuclear Power Station, Unit No.1 (the facility) has t>vn suostantially comoleted in conformity with Construction Permit No. CPPR-30 and tne application, as amended, the provisions of the Act and the rules and regulations of the Cc: mission; C.
Ita facility will ov ate in conformity with the application, as amended, the provir.8ons of the Act, and the rules and regu-lations of the Ccruission; 3.
Ihere is eeaconable assurance:
(i) that the activitles author 1:ed by thic operating license can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in cxmpliance with the rules and regulations of the Caraission; E.
The Ibledo Ddison Ccapany is technically qualified and the licensees are financially qualified to engage in the activities autnorized by this operating license in accordance with the rules and regulations of the Connission; F.
The licensees have satisfied the applicable provisions of 10 CFR Part 140, " Financial Protection Requirements and Indemnity Agreements," of the Cocnission's regulations; our.c >
.u mna es s >
Nc
.$m,== m
- ....y..
......WDom a S b
n D}
n' D
o a 11.
^
m, D
[
3 jq _k a O G.
ne issuance of this operating license will not be ini;cical to the cccmon defense and r.ecurity or to the nealth and safety of the puolics 11. After weighing the environmntal, econocic, tecnnical, and other cenefits of the facility against environxntal and other costs and considering availacle alternatives, rne issuance of Facility operating License tio. NPF-3 cuaject to tne conditions for protaction of tlw environmnt set forth herein is in accordance with 10 CER Part 51 (formely Accendix 0 to 10 CFR Part 50),
of the Cocnission's regulations and all applicaale requiree.ents have been satisfied; and I.
The receipt, possession, and use of source, aygroduct and z;ecial nuclear c.aterial as autnerised by this license will be in accordance with the Com.ission'3 rrgulaticnc in 10 CFR Part 30, 40, arxl 70, including 10 CFR.3ection.s 30.33, 40.32, 70.23, and 70.31.
2.
Facility Lperating Licenna No. !;PF-3 is nereoy issced to tne Toledo Ecison Corgany and the Cleveland Clactric Illininating Cc:pany to read as follows:
A.
nis licenne applies to the l'avic-Besce ::uclear Pcwer statica, t; nit o 1, a pressuri::ed water nuclear reactor and associatad equipnt (the facility), o.r.ed by the 21xio Edison Co:npany ra tne Clevelanr2 Electric Illuminating Co.mny, and operated bf the Toledo Edison Ccepany. Tne faciliry is Ic ated on tr.e scutn-i western snore of Lake Erie in cttava Ccunty, Caio, 2peroxicately 21 miles east of Toledo, Chlo, and is descriced in ene " Final Safety Ic.alysis 'eport" as succlecentec anc amnded (A end.ynta 14 enrougn 44) and the Environmental inport as supolmented and amried (supplemnts 1 throtr;n 2).
- 8.. Subject to the conditions and requiremnts incorporated herein, tne Ccemission hereby 1icences:
(1) 21edo niison company, pursuant to Section 103 of tne Act and 10 CFR Part 50, " Licensing of Production and utilization F...cilities," to possess, use, and operate the facil Ity; i
o,F#C 5 9*
e...
o.se n NRC PORM 314 (M6) NRCM 0140 W us e.oovenmesar painvine orrica. teve es-
m m" 0
D Oo
^Q'}3L o '9
_ J]
_. a
_a (2) me licensees to passess the facility at ene designated location in Cttava County, Onio in accordance witn the procedures and limitaticns set forth in tnis license; (3) Toledo elicon Company, pursuant to the Act anc 10 CFR Part 7u, to recolve, possess and use at any tine special nuclear material as reactor fuel, in accordance witn tne limitations for storage and amounts required tor reactor cperation, as descrlDed in tne Final Safety Analysis deport, as supple 2ented and asended; (4) Toledo F41sen Ccr.:pany, p:rsuant to the Act and 10 CFR Parts 30, 40 and 70 to receive, possess and use at any time any oyproduct, source and special nuclear material as cealed neutron cources for reactor startup, cealed zcurces for reactor instrumentation and radiation acnitoring equi wat t
calineation, and as fission detectors in amounts as required; l
(5) Teleco caison Coc pny, pursuant to ene Act and 10 CFR Part2 30, 40 arr) 70, to receive, pescens anc use in acounts as required any cyprocuct, ;ource or special nucle:r.r.aterial witnout restricticn to caecical or pnycical tera, for cample analyais or instrument cali: ration er associated witn radioactive ap=aratus or caraponents; anc
( 6)
Ibledo Glison Co. ;cny, pursuant to tue Act an; 10 CFR Parta 30 ard 70, to possess, cut not separare, sucn cypro;uct and special nuclear materials as =ay ce predeced by tr.e omration of rne facilley.
- c. mis license chall ce deo::wl to contain anc is sub3ect to tne conditions specified in tne following Co:picsion regulations in
- 10 CFR Chapter I: Part 20, Section 30.34 of Part 30, Sectiun 4J.41 of Part 40, Sections 50.54 crd 50.53 of Part 30, and Section 70.32 of Part 70; and is cuc3ect to all aglicacia pro-visions of rne Act and to tac rules, regu]ations, and orcers or the Cccrission now cr t.ereaf ter in effect; and is sucject to tne additional conditions specified or incorporated below:
(1) iuxim$a icwr level
'luledo Inison Ccropany is authcrimed to operate ene facilicy at steady state reactor core p:Ner levels not in excess of 2772 negawatts (thermal). Erfor to attaining the y wr level, Itledo Cdison Ccmpany snall ca: ply witn ene conditions identified in Paragrann (3)(o) below and couplete tne preopera-tional tests, startup rests and other iteca identified in Attacnmmt 2 to enis license in t!w sequence specified.
Attacament 2 is an integral cart of this 1icent.o.
oresc s w
/
summaus >
oars >
'\\ NRC FORM 318 (9 74) NRQi 0240 ilt us s. eovsamusser resemme orrres, sove-ene ee4
m' o' D
D l
o o
_{lU
- m' D
g a
.A J
( 2) Technlea1 Swcifleations
?.m 19chnical Specifications contained in Acpendices A a:x!
d attached hereto are hereby incorocrated in tnis license.
"bledo Edicon Cocpany shall corrate the facility in accordance with the Technical Specifications.
(3) Mditional Conditions Ite aatters specified in the following conditions shall ce cogleted to tr.e satisfaction of rise Canalsalon witnin the stated tia:e periods following tna issuance of rne 1Icense or within the operational restricticns indicated. The receval of these conditions shall be a de by an aae ximont to the license supocetal by a favorable evaluation by the Canaission:
(a) Toledo Edison Cocnany anall not operate the reactor in operational hes I cnd 2 with less taan three reactor coolant puriss in operation.
(D) ivitnin four (4) rentns of tne date of issuarce of tais license, Toledo Edison Coccany snall cccclete mocifi-cations in ene diacel fuel oil storage and transfer system. t:e n:cdified dealgn Jhall provice each diasel generator with a 40,000 gallon sel=le Category I fuel oil storage tank which snall be installed and protected above ground against tornado forces and tornado als:alles.
Ltch fuel oil storage tank aball to proviced witn its own cei=ic Category I transfer prp, piping and valves to serve its respective diesel generator day tank.
(c).iithin three (3) months of the care of issuance of thic license, tleco i:dicon Ccr:cany chall have incralled a second ornen monitor in the gaceous waste systen to provide redundant orfgen ecnitors that will alarm locally and in tne control roco at ene cet ceints of two percent and four percent by voltane of oxyge i, respectively.
(d) Prior to startup following the first (1st) regularly seneduled refueling outage, Toledo niison Carapany shall install a long-ter:n means of protection against reactor coolant system overpressurization.
orrics >
ounmaas s >
04?s >
g
.NRC FORM 313 (9 76) NHCM 0240 W u. s. novs==usm, en.mme opric se sore - ese.eae
9 mO}
a o ju D
3 w 1] b
. _(l Ju 1
l (e) Prior to startup follouing the first (lar) regularly scheduled refueling outage, Toledo f;iison Company snall codify the reactor coolant system flow indication to
- eet the cim;1e failure eriterion with rejard to pressura censing lines to the flow differential pressure trancaltters.
(f) Frior to startup folicwing tre first (lat) recularly ocheouled refueling outage, Ioledo !2iicon Ccacany shall ex:dify the auxiliary feedwater system cy providing civerse direct current towr to one of tne redendant auxiliary feecwater trains.
(g) Frior to ctartup following eno first (1st) regularly ceneculed refueling cut:3e, Toledo Edison Co.pany snail couify tre emergencf ccre cooling system cy providing
.wtor operated valves with control and ::caition i:>.:ication in tne control roca in Ileu of the manually operatad valves in eacn of tne tw crossover connection linea installej corbeen the hign pressure maket.p pump :tction and t:1e icw proccure in)cetion dicenarge.
(h) Witnin three (3) years of the cists of iscuance of thia 1icenca except sa noted celev, Tole:c :2i On Co.Wany shall increase tne level of fire prerection in the facilit/
to the level: recccmm!ed in.Wendix A ro the St.ndard Ecview Plan 9.5.1, 3evision 2, " Fire Protection Syste:::," or with alternativec acce:tecle to tne Cca:iission.
Prict to startun fclleving the first (1st) rnularly seneduled refueling cutage, Toledo Edison Cx;;oeny shall imple.ient 3ectica 3 of Acpendix A, ".t.hinictrative Precedur.?s, Control s and Fire er ignue," aru S~.: tion C cf Apcenoix A, " quality.bsurance Frcr; ram."
( i)
If rne Saocock & Wilcox proposed rod bcv 2x: eel has not caen a;crcvad cy tne Car:isaica upcn cc. pletion of One hcndred (100) effective full per days of oTration for taa facility, the bledo aalsen Ccapany must revice the plant technical specifIcationa to reflect the roc how odel used by the Cc:risc10n for daccock &.illcox plants which requires tiv following Dui3a maalties as a function of curnup:
Eurnup (MWD /itaJ)
CtaR Penalty 0-5,651 5.9 percent 5,651-15,000 8.2 percent 15,000-24,000 9.11 cercent 24,u00-33, uvo AA.
_ercent OPP.C t W sunwaua >
0A,4 W g
Nac ronx sis (9 76i Nacx 024o
- v..ov......,..,,...,,,..,,.,....
__ J
1 D
0 o6 t^
DlQ 6-o e 1 j h
_. J (j) Until cuch time as final recolution is cotained regarding the po*ential for and consequence: of an inadvertent closure of a decay heat removal system valve during anutdown ocerations, Toledo Edison Cr:pany shall maintain powr en decay heat removal isolation valves ra 11 and CH 12 and cnall operate cne decay neat terrval train at a time.
(k) Prior to startup following the first (1st) regularly cenedaled refueling outage or no later than 26.-onths from the issuance of this license, vnichever comes first, Toledo nilson Comp.ny shall comolete tests and octain test results as required cy the Ceaaission to veri:Y enat faults on non-Class It citcuits would noe propagate to the C1 ass IE circuits in the P.eactor Protaction System anc the Engineered Safety Features Actuation System. In acdition, within four (4) months from the iscuance of tais 1icense Toledo Edison Company shall provide accept:ble noise tect procedures in accordance witn.111. 5tancard 13300, Section 4.6.11 (or ecuivalent) for rests to ce conducted on tae non-Class IE circuits that interf ace with the :Wccter Frotection system, in order to eatisfy ene oojectives of section 4.6 of IEEC 5tandard 279-1963.
(1) witnin six (6) months frv the issuance of this 1icense:
Toledo r41sen Cocpany snall provide additional succorti:v) analyses for the large nreck spectrum to document the exact margins witnin the ECC3 acceptance criteria of 10 Cia 50.46; and shall provide ocerating re cter coolant system flow data for the facility which can be used to document canctor coolant system total pressure drops.
(m) Within six (6) :nontna frc= the issuance of tnis 1icence, Toledo Edicon Cc:apany shal1 modify the existing 1ow prescure and hign pressure injection flow indication sy0 tem to one unica has been selmically qualified and powered from essential power sources with flow indication in tne main control rocm.
(n) Frior to startup following tne first (1st) regularly seneduled refueling outage, Toledo Edison Comoany shall install flow measuring devices to measure at least 40 gpn for boron dilution when tne plant is operating in either i
the not leg drain mode or the pressurizer spray :o:le.
(o) Prior to entering fnie 2 (Startup), 'Ibledo Edison Company shall sutait for staff evaluation and subsequently imolement tne necessary modifications to ensure that the decay neat r wm1 r.1 Iof valve will acenar. nrter to anerne Ir- -inenro of the decay neat removal system isolat:.on valves.
ouemams >
DaTE >
g NRC FORM 318 (9 76) NRCM 0240 W u. s. eevs==many romvu.e arries voye. ese eaa
mm D
D boE
~
o]~
~ }
j'
_7_
o S)
_. h
_A 3
(p) Prior to startup following the first (lat) regularly seneduled refueling cutage, ':eledo Edison Occ:pany sha))
have suTiltted an analysis of design modification alter-natives to tne present key lock control in the manual cypass valves Ot121 and DE23 around the decay heat removal suction line isolatica valves, that will decrease the likelihood of the bypass pata teing opened inaavertently during periods when isolation of the decay heat removal loop is required; and suosecuently have comcleted the installation of the approved design.~.cdifications.
(q)
Within four (4) months from the issuance of tnis 1icense, Toledo Edison Coqmy shalI sucnie an avalusticn and proposed acdifications, if requirec, so that the facility cesign will assure adequate creaker coordination and isolation of f rs onsite sysrea in sufficient tice to irrait the required Class II: egairnent to operate in the eveit of offsite grid dejradation.
Prior to tne Cxmission approval of the.cdification, Toleco Edison Coreany anall maintain tne noraal operating rance for the grid system voltage between 93.3 percent to 102.3 percent of rated voltage (witn correucending safety-related cus voltage as detined in Attachmnt 1 of 3)ledo ' lison Cc=pany'a a
letter to the Cecnissica dated ucveter 13, 1376). In tne event tae system conditions exceed tnese values, Toledo Edison Cocpany shall proceed in an orderly canner to reduce load to ~, percent of rated power and take ccr-rective action te stabilim the system to witnin tne values stated abova pr for to return to higner,cwer levels.
(r) Toledo dison Caircany snall sutmit a seismic raanalysis and evaluation to the Cocaission for its review and accreval in sufficient time to obtain Ccalission approval of the adequacy of.the plant systeras needed to ac~xplish safe shutdown of tne reactor and continued snutoown heat removal prior to startup following the first (let) regularly seneduled refueling outage. In perfornir,3 ene reanalysis a safe shutdown eartngaake acceleration of 0.20g shall be applied at the foundatien level of the plant and tre response spectra shall be used as specified in aegulatory Guide 1.60, " Design Fesponse Spectra for Geismic Eesign of Raclear Power P1 ants.
te seIsaic reanalysis and evaluation shal1 te conductec in accordance with guidelines to oe specified oy the Cocnission.
(s) Toledo I:dison Cpy shall be exempted froct the require-ments of Technical Specification 3/4.7.8.1 for the two (2) tapricium-Deryllium-Copper startup sources to be n m staa nr,, ra,s., sn u s aa rer va ater sne vna F t r :,-
' refueling cycle until sucn tice as the sources are re placed.
l o.es >
Nac roam na i9.m NRCM Oho
- u. s. sovannm ent pointine ornese sete - ene.ese
'^~
mo D
D n
CJ c JL opg7 o
J(
~B-
_a D.
Wiedo Edleon Comany snall :r.aintain in effect and fully i.glemnt all provisions of tne pnysical cecurity plou acproved by tne Comicalon, incit. ding amncments ano changes.made pursuant to the authority of 10 CFR 50.54(p).
'"ne cperoved aecur ity plan consista of proprietary dccu&nts, collectively titled, "Oavis-lesse Ibclear Power Station Induser ial > cur ity P1an," as follows:
Fevision 4, sumitted witn letter datea novecter 14, 1976 (wnich replaced in its antirety all provicus su:x:ittals)
Fevision 5, sumitted with letter dated February 13, 1977 Fevision 6, autraitted witn letter dated riarcn 24, 1977 Pursuant to 10 CFR 5ection 2.790(d), tne security plan is being withheld from cuclic disclosure cecause it is deemed to ce coramercial or 'inancial information within the meaning of 10 t
CFP. Section 9.5(a)(4) and sucject to cisclosure only in accordance with 10 CFR Section 9.12.
E.
This license la subject to the following antitrust ccnditions:
The following " definitions" ano a1icensing cenditions" wre crdered by tne Atcalc Safety and Licensing Eoarc presiding over the cc:::bined Davis-Msse 1, 2, 3 and Perry 1 and 2 antitrust hearings, ana are in tne words of tne Lic*nsing aoard.
Cofinit ions 3.tity snalI wan any electric generation ard/or distributicm system or :nunicipality or cooperative with a statutory right or privilege to engage in either of tnese functions.
hteel..g shall mean trans;:ortation of electricity by a utility over its lines for anotner utility, including the receipt from and delivery to another system of 1ike amounts but not neces-aarily the same energy. Federal Ecwer Cor.nission, The 1970 National Power Survey, Part 1, p. I-24-a.
oerece >
ownmaase h eet t >
i
~
NRC PoaM 31s (9 76> NRCM 0240
- u._e. eovs museen, ramvine orrica, s ete - ase a4
O D
~D WO-m D '9-7 Licensing Conditions V
d C
(1) A;pilcants cnall not condition tne cale or excnange of electric enargy or tne grant or sale of bulk powr carvices upon ene condition that any otner entity:
a.
enter into any agreezent or understanding restricting the use of or alienation of such enargy or services 1
to any custcraers or territories; D.
enter into any agreepnt or understartling requiring tr.e receiving entity to give up any otner culk
- cwr service options or alternatives or to deny itself any carkat opcortunities c.
witndraw any petition to intervene or forego partici-pation in any prcceeding before the :!uclear Jegulatory Ccianiasion er refrain from instigating or prosecuting any antitrust action in any other forum.
(2) Applicanta, ano aach of thea,' cnall effer interconnoctions uren reancnable terns and conditions at the request of any other eleceric entity (ies) in the CCC, suca interconnection to be availacle (witn due regaru for any necessary and acclic.ble cafety procedures) for operation in a closed-switch synenrencuc cper: ting code if requested ay the intercennecting entity (ies). Caranig of transmissica lines and switening stations associated witn such inter-connection shall remain in the hands of tne party funcing tne intercennecti:n casject ncwver to an/ necessary cciety precedures relating to ciccennection f acilities at ena point of powr delivery. Scen limitations on oweranip snall te tna least neces:ary to acnieve reascnacle safaty practices and shall not serve to deprive purenasing entities of a.icens to ofrect accitional bulk service opticns.
( 3) Acplicants shall orgage in wneeling for and,st tne recuest of cener entitles in tne CCC:
a.
of electric enargy frc= delivery points of Apolicants to tne entity (les); and, b.
cf powr generated by or availaole to the ornar entity, as a result of its ownercnip or entitlemnts* in generating facilities, to delivery points of Applicants designatec by the other entity.
Crit itlermt" includes but is not 1imited to power made available to u v *it;.~ 2 = ' t: an ~.=h:. y m ::.::;,t, oreses
- sunwams >
oaes*
._.m NRC PORM 31s (9 76) NRCM 0240 W u.e.eovenwuswvrainviwe orrica seve-eaesee
OOQ 9
a o Ju i
T' D A
10 -
\\
i
- (
L JL 7
~
Such vneeling services shall be available with respect to any unused capacity en the transmission lines of Applicants, the use of whien will not 3eopardize Applicants' system. In the event A;:plicants :::ust reduce wneeling services to other entitles due to lack of capacity, such reduction shall not be effected until reductions of at leact 5i have been made in transmission capacity allocations to orner Aoplicants in these proceedings and thereafter shall be cade in proportion to reductions imposed upon otner Applicants to this proceeding.*
Applicants chall ;ake reasonable provisicas for disclosed transmission requirements of other entities in tna CJCT in planning future transmission eitner individually or within the CAND grouping. By "discloced" is meant the giving of raasonable acvance notification of future requiremnes cy stitias utilizing wneeling services to te maie availacle cy Applicants.
(4) a.
Applicants shall make available re.tarship in CA2C3 to any entity in the CCCT with a system cacaoility of 10 m or greater:
b.
A group of entitles with e.n aggregate system carA-bility of 10 W or greater may cctain a single an.:cer-ship in CAPCC cn a collective casia.**
c.
Entities apolying for maberanip in C.VC0 x1rsuant to License Ccndition 4 shall beccc:e pecera sur.,jact to the terms and ccnditions of tne CAFCO.5t~.aorancum of UrKier-standing of Septercer 14, 1967, am its ivple.::entirs agree:ents; except that new cembers ma'f elect to participate on an ecual cercentage of reserva cacic rarner tnan a P/N allocaticn for:::als for s ;oriod cf me ocjective of tnis requireent is to prevent the pre-erotion of unused capacity on the lines of one Apolicant by other Acplicants or by entities the trancmitting Applicant dee=s noneccpetitivo. Ccaperitive entities are to be allowd ocpertunity to develop bulk power servicss octions even if this results in re-allocation of CAPC0 transmission enannels. ' Ibis relief is requira3 in order to avoid prolongation of tne effects of Applicants' illegally austained dominance.
- e.g., wnolesale Custewr of Ctaio Edison (WCOE).
orrics >
summanos >
DaTs W 7
NRC FORM 31e t9 76) NRCM 0240 fr u. s. sovanansaw re.=vme orricse sete-es as4
oo
~
D DJ oo1 m
11 -
A o S]
J a
twelve years from date of entrance.* rT11owing the twelfth year of entrance, new mehers shall be expected to adhere to such allocation methods as are then e; ployed by CAFCD (subject to aqual cpportunity for waivwr or special consloeration granted to original CVCC m:noers which tnen are in effect).
d.
New mechers joining CAFCD pursuant to this provision of relief shall not be entitled to exercise voting rignts until sucn tim as the system cacaoility of the joining arter equals or exceecs the syste= capability of the smallest mercer of CUCD whien enjoys voting rights.**
(5) Applicants shall sell raaintanance p:wr to requesting entities in the CCCT upcn terms and c0nditions no less tsvoraala tnan thosa Applicants make available:
(1) to each other eitner pursuant to the CMCO agreeraants or pursuant to ollater al contract; or (2) to non-Asplicant entities outside th9 CCCI.
(6) Acolicants shall sell amrgency ccar to requectin3 antities in tne CCCT upon terms and conditions no less favoratie t.ian those Apolicants make availacle:
(1) to eacn other pitM r pursuant to tne CAPCD agreeTents or r:ursuant to bilateral contract; or (2) to non-Arx:licant entities outside tue CCCT.
Ete colectica oT tne 12-year parfod reflects our cetermination tnat an cdjustmnt period is necessary since tM P/:: fcrnala has a racognized effect of dizeriminating against small syste.ta and forcing enem to forego econcraies of scale in generation in order to avoid carrying excessive levels of reserves. We also found that P/:I is not entirely irraticnal as a cer.wi of reserve allecation. ila have occerved tnat Arclicants themselves provided adjustwnt periods and valvers t, intasata certain Applicants into tne CVQ reserve requiremnt progr te 12-year period should permit new entrants to avoid initial diccrl:nnation but to accom-modate and adjust to the CVC0 syste: cver so::e reasonable eriod of ? ba.
Presurably new entrants will be acquirirg ownersnip snares and entitlecents during the 12-year period so that adverse consequences of applying tne P/N formula will be mitigated.
- 0ur oojective is to prevent impediments to the oceration and devalognent i
of an area-wide power pool through the inability of lecser entities to respond timly or to make necessary planning cocraitants. while we grant new amoer entitles the occortunity to participate in CAPCO it is not our intent to relleve joining entities of responsibilitles and obligations necessary to the successful operation of the pool. For those smaller entitles which do not wish to assume the broad range of obligations asrociatad with CAPCO sammbership we have provided for access to bulk wr marvice cotions which will furtner their ability to survive and
,,,,,, o ffer competition in the CCCT.
eummanos >
OATE D NRC FORM 318 (9 76) NRCM 0240 1lt u. s. oove== man, eninreme oprie e,,are - ese.eaa
l
~
D F
12 -
2}D lhn1 A
'd udD u Ju La (7) Apolicants shall cell econo.'.y enera eo requesting entitles in the CCC2, when available, on terma and conditions no less favcranle than those availacle:
(1) to each other either pursuant to toe CAPCU agreements or girsuant to ollater ial contract; or (2) to ncn-Acplicant entities outside the CC0f.
(9) Applicants shall chare reserves with any interconnected generation entity in the CCCT upon request. ne requesting entity snall have ene option of charing reserves en an equal forcentage c, asis or my uce of the CAPCo PA! allecation formula er on any other mutually agreescle basis.
Applicants shall cake availacle to entities in ene CC~:'
(9) a.
access to the Davic-Desse 1, 2 and 3 and the Barry 1 and 2 nuclear units and any orner nuclear units for vnich Applicants or any of thec, snall aply for a ecnstruction permit or crerating 1icense during tno next 25 ' Pars.
Suen accccs, at the option of rne requesting entity, snall ce on an o wranip anaro, or unit participat.icn or contractual pre-purcaane of ccwer a231s.*
Eacn requesting entity (or collective group of entities) r;ay corain up to IG4 of the capacity of the Cavia-desse and Perry Units and 2u% of future units (cuoject to tre 25-yaar 1imitaticn) e.ce?pt that once any entity cr entities have contractM for 211ccaticnc totalim 10s or 20t respectively, no furtier particication In any given onit need t6 offered.
b.
Comaitments for the cavic-aesse cnd Parry i.' nits runt
' o mJa by raquesting entitiea within t.co years arter ctais dec! lon becomes final and within two yeara af ter a license acplication in filas ror future units (sun-ject to the 25-year limitation).
l l
1 l
Fequesting entitles election as to the type of access may be affected cy provisions of state law relating to dual ownersnip of generation facilities oy municipalities and investor-owned utilities. 2uen laws
=ay enange during the perlod of applicability of these conditions.
.vecedingly, we allev requesting entities to be guided by relevant legal and financial considerations in fashioning tneir recuests.
orric a e Su mssant h oave >
NRC FORM Ste (M6) NRCM 0240 W u. e so-anament.amnwe arries. Soyo.esume
s
. (10) Rese conditions are intended as mininum conditions and do not preclude Applicants from offering additional culx ocwer services or coordination options to entitles wirnin or witnout the CCC2. P.owever, Apolicants anall not deny culk power services regaired lay thece conditions to non-Acolicant entities in the CCC? based upon prior cocuitsnts arrived in the CAKD tiemorandum of Understanding or implemnting agreements. Preer@tlon of octions to heretofore coprived entities shall be regarded as inconsistent with tne purpose and intent of these conditions.
Se above cceditions are to ba i.glemented in a mz.nner con-sistent with tne provisions of the Federal Power.s.ct and all rates, charges or practices in connection therewith are to ce suoject to the approval of regalatory agencies having i
jurisdiction over tnein.
F.
213 license in cuc]ect to the follcwing cdditional conditicns for tne protect icn of tne envircrment:
(1) The Wieco alison Cc:tpany crud
- operate cavis-Gesse Gnit No. I within a, plicable Federal and State air and water
~
quality standards ard the Cr.vironmental Idehnical Specifi-i cations which include nonradiological and radiological monitcring program.3,1imits an offluent releases, and
)
appropriate corprehensive ecological curveillance stecy, and repertirg regairemnte.
(2) Before engaging in an operational activity not evaluated oy the Conraission, tne 1icensees will prepare and reccrd an envircreaenta evaluation of cuch activity. inten the evaluation indicates that such activity may recult in a significant aaverse environ.oenral impact that was not evaluated, or that in significantly greater than tnar evaluated in tne Final Environmntal.itatement, the licensees shall provide a written evaluation of such activities and ootain pr for apcroval of tne Director, Office of ikx: lear aeactor regulation for the activities.
D V $ Jll
\\
'O h ~ m -s]13 LJ 0 e ...tC S 5 SUS *e A te t > 0 ATE D -,o-m. ~.,. -.
r '.3 e- ~ 2 . G, In accordance with the requirement irposed by tne Octocer 8,1976, order of the United States Court of Apceals for the District of Columola Circuit in Natural -fesources refense Council v. :iuclear Fegulatory Comission, :n. 74-1165 mT74-1565, enat the wcfear i-egulatory Ccx.nicslon "shall make any licencas granted i.vt.e=n July 21,1976 and cuen tir.e wien the manaate is issued subject to the outccre of suen proceedings herein," this 1icenso shall be subject to the ourccce of sucn proceeding. H. ':his license is effective as of tne date of issuance and snall expire at midnight, Marca 24, 2011. FCd THE NUCIIAR PIG.~JCM CCalI63IO4 0.-!:in.11 Signed by R.C.DeYcun g~ "oger 3. I.io7d, Directsr Divisi0n of Project Managr.:rnt Office of !?cclear sactor Pr=;ulatica At tach.x-nts : 1. Nxendices.T !. 3 - Tecnnical S;:ecifications 2. Preo.cerational Tests, startup Wsts cJu Ctner items Which !iust Be Ca4 ered Prior to Proceding 1 to succeeding Operational.wxies D OoM a o. ll B ~ ~ T ~ 3 Oate of tesuencer o E_:b_l a SEE PREVIOUS YELLOW FOR CONCURRErlCE D0R 0EL OELD/Antt rust EP/BC EP/AD RClark h "DM Rutber / r,nia5 ton VA"oore LWR D0R JStol JRoe 4/jJJ77 4/ /77 4/ /77 4/~G77 4/gG7 4/ /77 4/ /77 _M _y~ 'b LWR EP/D .N1RAJG LUR _ D9 .,,,c,, HDenton JSaltzman C3Vassallo RG[dibpng 'S ....,,,, 4 g 4/ /77 4/ /77 4///77 4/ M 77 A5477 4/ /7 N =c mur m mu. =an.u.,
- m m. s l
r E 5 L ~ 6 9 . G. In accordance with the requirerrent imposec " t!P Cctocar 3, 1976, s 'N order of the Unitec States Court of Appe a for rne District of \\ aluttia Circuit in Natural Tesources rense Ccte.cil v. Nuclear C Fegulatory Cecraission, No. 74-1365 74-15d6, tnat tne t.uclear wgulatory Cc= mission "snall =as.e y licences granted between July ll,1976 and sucn time v:en 7e manaste is issued suc]ect to tne outcome of sucn proceed 3s herein," this license snall ce suoject'to the outcome of en proceedings. N H. bis licea.se is' effective s of the date of issuance and snall expire at midnigntl dar. 24, 2011. 'N \\a nE NGCIrlu TCCCUuCKl CCet:IS3Iai E0 x N F:oger S.hyd, Director Civision of hojNt !!anagement Office of ducl3K Feactor negulaticn N At tGCn.TenUS : 1. Agtendices. Is 3 - Technical 'g f Specifipations x 2. Incccplgte Preogerational Iests, Jtartbp Tests ard Ceners to be @ lated / Cate o't Issuance: j s o o" D O aoE m v s.~ _a i f' ^ /- (*y / 7 LWR 1 D% GR _0 ELD OELD/ Antitrust EP C EP/ AD. JStolz J Clark d $ f JRutberg onVA ge 4/ /77 4/2C/77 4/.3/77 4/~'/77 4/ /77 4/h /77 4/ [77 . LWR 1 Eh/D ,Ma9El$n DBVassallo RCDeYounq RSBoyd N,RRAIG g AD/ LWR DD/DP'1 D/CP4 HikMen hE,.. 4/4/77 _4f- /77 4/ /77 4/ /77 4/ /77 4/ /77 .m NRC FORM 318 19-76) NRCM 0240 ff u. s. eovemmuawe mesmo orriese sero-eawu ~,. ~, - -. .I
r s. p go OWS ATTAQsif2tr 2 IO LICaiSE NPF-3 o 'D ~ A a b b' a Preocoratfonal Tests, Startup Tests, and Other Iteas Enten itsr_ ce Co=plet,ed Pricr to Proceeding, to Succeedina Ocerational PDdes This attacnment identifies certain preoperational testa, startup testa, and otner items wnich must ce completed to tne Ccmission's satisfaction prior to proceeding to certain ceccified Ccarational Modes. Toleco Edison Ccopany caall not prcceed beyond tne authorized Crerational ;Dc.ez without prior written authorization f roci tne Coat.ission. A. Toledo Edicon Comcany may at the license issue date proceed directly to operational cioce 6 (inirial fuel Icading), ard =ay sucsequent1y proceed to Cserational Mcde 5 (cold snutdcun), except as noted calew. S. Tne following items must be completeo prior to,croceecing to Operational rece 5 (cold snutdown): 1. .Waroval is required cf tne fifteen listed curveillance crecedures ST5030.02 RPS tentaly Check S"5030.09 EPS i#spense Tira ST5031.14 r.PS Fosponse Ti:.e Calculation ST5036.02 reccte Snutdcwn ficnitor Instrument Charel Callcration 3r5036.03 Post Accident Instrument Charel Check ST5036.04 Post Accicent Instru:nent Channel Calibration $I5050.02 Core Flood Systen Isolatien valve Cheex ST5051.01 ECCS Subsystem ibnthly Test ST5061.02 Containment Iccal Leak Test ST5062.ul Containment Spray System acnthly Test ST5070.01 nain Steam Safety Valve Setpoint ST5020.01 Axial Power I=alance Manual Calibration 375022.03 Ouadrant Pcwor Tilt SIS 033.02 Incore tenitor System recorder Calibration Sr5042.03 feacter Coolant Flou Rate Test 2. System Interaction 'Ite Toledo 1111 son Con:cany's 5000 and 5000 Series EIr.s (Engineering Inspection re,rorts) concerning uo;rading of supports and instal-lation of water shields on non-safety related systens such that tneir failure vill not degrade or cause failure of a safety related system cust ce empleted as stated celow: OFFIC s W evenans > Says W NRC 70lLM 318 (946) NRCM 0240 W v. e.eovsomus=v e=entine oPrics neve-eas sa4
O D D aaS A } 1 4 o .h_ __3 2-a. Upgrading of 29 electrical tray and cory.luit supports primarily located in the 4160 and 430 volt switch gear roor::s and Intake ~iater Structure. r b. Final inspection and approval by Toledo Edison C:rpany Cuality Control of 24 cocpleted codifications and accroval oy Engineer ing. Final review and approval by 'Ibledo Edison Ccx:cany Engineering of c. 26 completed and inspected modifications, d. Cccpletion of 24 structural items, primarily shielding devices from water sources. C. I!w following itema must be completed prior to proceeding to Operational Fo.fe 4 (hot snutdown): 1. algn Pressure Injection Pu:o Modification te Ioledo Edison C::cpany must provide documentation to estaclisn that rne modification work for tne sc:co is in accordance with tne FSM and tne specification requirecents. 2. INAC Systems te reinspection activity and subcequent repair effort, relative to welda needed to resist sel.mic design forces, cust i::a co:pleted. 3. Earge Pica flangera and-Anchor 3 Corrective actica relative to 76 large pipe hangers and seven anchors for safety related systemn cast ce completed. 4. Scall Pire Mangers and Ancnors Corrective action relative to stall piping systm:: ciscrepancies I::ust ce completed. 5. Valve Stem tocknuts Stem locknuts for 141 valves with limit torgae o erators witnin safety related systems must ce verified as teing " staked." 6. Irak-Tightness Test of valve Enclosure Approval of perlodic test procedure and coccletion of a leax tigntness tect of the enclosure installed around CH 11 and m 12 valvas in containment. orree s > euemmas s > oasaw NRC FORM 518 (%74) NRCM 0240
- m e. oovannassav rainvine orrica. teve -eae sas
~ goop ooj 3-D ., \\ A O _dJ -J c 7. Systems Intaraction a. Upgradlag of 25 electrical conduit supperes priaarily located in hallwris and corridors. b. Upgrading of 27 pipe suppcrts. D. 21e following itens :nust ce cccoleted prior to proceeding to Cterational Hode 3 (hot standoy): 1. Fewor4ed Valves Five =all valves witnin safety related systecs must be hydro-tatically tested and accepted to the rgirecents of tne applicaole code. E. 2e following items must be completed prior to preceeding to prational inle 2 (initial criticality): 1. eledificatien to replace the foer level switches in eacn stear. generator inside centain:ent with fcur level tranmitters. 2. Fracluticn of discrepancias for Freoperational Testa: ?! 232.01, nl cellanecas sadwacte system F2 230.01, Clean Licuid Fadwaste 3. Ccepletion of Precperational Tests: Pr 230.02, Cogassiflar ?? 230.03, Soric Acid Lvaporator Fr 231.02,.tiscellaneous Waste Naporator F. Tne following items must be cocoleted prior to proceeding to G eratienal
- die 1 (powr cperation):
1. Energency P1anning-Procecures a. An isolation emergency plan i=plecenting procecure to cope with weat.'ier conditions wtilch require ;orsennel to remain at the station for undetermined periods shall te develo,:vd. Dia procedure shall also akiress protfisions for transcortation of emergency personnel to tne statica oten needea during enese periods. b. De following topics will be incorporatM into the Crergency Plan Laplementing Procedures orric s > 1Umseanst > 3 ATE D NRC FORM 319 (976) NRCM 0240
- u. s. aovenmassmv remine oprics, iere. sae-ea4
r + mo D D ooS mr eg 5] 1_A 0 (1) Evacuation of perconnel to minimize expcaure to hazard. (2) rersonnel accountactitty to assist the person in charge of emergency response actions to accourc for missing persons. (3) i m try into previously evacuated areas for the purpeces of saving lives, searen and rescue of missing and injured persons. Safety equi;xaent to be worn depencing en areas or conditions chall oc addressec. 2. Completion of Preogrational Wats solid iraste Cer:pactor, PT 233.02. 3. Electrical Firebarr ter asting te Toledo Edicen Ccrapany shall crovide cocumentation of fire barrier testing to assure confer ance of the fira barriers installed at the Davic-Sesce 1 plant to.%&'S C-Il3. 4. Boren Dilution Made Tests Corglete flow tests in the not leg drain rose and tna pressurl: r spray :aode to verif'/ mininuni ficw of 40 gallons per minute. l orrie s > oue.... OATE b NRC PORM 318 (N6) NROS 0240 1!r ua e. eovenams-v Peewfine otracas s ove - see eae ,}}