Forwards IE Insp Rept 50-346/75-16 on 750818-20. Noncompliance Noted
ML19317F585
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 09/16/1975
From: Hunnicutt D
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Roe L
TOLEDO EDISON CO.
Shared Package
ML19317F576 List:
References
NUDOCS 8001150907
Download: ML19317F585 (2)


See also: IR 05000346/1975016

Text

._

_

__

_

_

_

_

_ _ .

_

_

s

~

1

'

~

.

UNITED STATES

NUCLEAR REGULATORY COMMISSION

REGION 111

799 ROOSEVELT RO AO

GLEN ELLYN. ILLINOIS 60137

SEP 16 1975

Toledo Edison Company

Docket No. 50-346

ATIN: Mr. Lowell E. Roe

I

Vice President

!

Facilities Development

Edison Plaza

300 Madison Avenue

Toledo, Ohio

43652

Centlemen:

This refers to the inspection conducted by Messrs. Sutton and Jablonski

of this office on August 18-20, 1975, of activities at Davis-Besse

Nuclear Power Station Unit 1 authorized by NRC Construction Permit

No. CPPR-80 and to the discussion of our findings with Messrs. Eichenauer

and Blanchong of your staff at the conclusion of the inspection.

A copy of our report of this inspection is enclosed and identifies the

areas ayamined during the inspection. Within these areas, the inspection

consisted of a selective avamination of procedures and representative

records, interviews with plant personnel, and observations by the inspectors.

,

'

During this inspection, it was found that certain of your activities

appear to be in noncompliance with NRC requirements. The item and

reference to the pertinent requirements are listed under Enforcement

Action in the Siimary of Findings Section of the enclosed inspection

report.

This notice is sent to you pursuant to the provisions of Section 2.201

of the NRC's " Rules of Practice," Part 2. Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office within

thirty days of your receipt of this notice, a written statement or

explanation in reply, including:

(1) corrective steps which have been

taken by you, and the results achieved; (2) ccrrective steps which will

be taken to avoid further items of noncompliance; and (3) the date when

full compliance will be achieve.d.

8001150 g

.,-y

-

-m,

- - - , +. -

- --

.-

_

-

_ _ _

. _ _ _ - - _

_ -_--

..

.

SEP 16 1975

Toledo Edison Company

-2-

In accordance with Section 2.790 of the NRC's " Rules of Practice." Part

2. Title 10, Code of Federal Regulations, a copy of this notice, the

enclosed inspection report, and your response to this notice will be

placed in the NRC's Public Document Room.

If this report contains any

information that you or your contractors believe to be propriotary, it

is necessary that you make a written application to this office, within

twenty days of your receipt of this notice, to withlmld such information

from public disclosure. Any such application must include a full statement

of the reasons for which it is clahd that the information is proprietary,

and should be prepared so the propriatary information idantified in the

application is contained in a separate part of the document. Unless we

receive an application to withhold information or are otherwise contacted

within the specified time period, the written material identified in

this paragraph will be placed in the Public Document Room.

l

Should you have any questions concerning this inspection, we will be

glad to discuss them with you.

Sincerely yours,

l

l

i

D. M. Hunnicutt, Chief

Construction and Engineering

Support Branch

Enclosure

IE Inspection Report No.

050-346/75-16

bec v/anel-

PDR

Local PDR

NSIC

TIC

U. Young Park, Nuclear Engineer

lv

L