Text
._
_
__
_
_
_
_
_ _ .
_
_
- s
~
1
'
~
.
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION 111
GLEN ELLYN. ILLINOIS 60137
SEP 16 1975
Toledo Edison Company
Docket No. 50-346
ATIN: Mr. Lowell E. Roe
I
Vice President
!
Facilities Development
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Centlemen:
This refers to the inspection conducted by Messrs. Sutton and Jablonski
of this office on August 18-20, 1975, of activities at Davis-Besse
Nuclear Power Station Unit 1 authorized by NRC Construction Permit
No. CPPR-80 and to the discussion of our findings with Messrs. Eichenauer
and Blanchong of your staff at the conclusion of the inspection.
A copy of our report of this inspection is enclosed and identifies the
areas ayamined during the inspection. Within these areas, the inspection
consisted of a selective avamination of procedures and representative
records, interviews with plant personnel, and observations by the inspectors.
,
'
During this inspection, it was found that certain of your activities
appear to be in noncompliance with NRC requirements. The item and
reference to the pertinent requirements are listed under Enforcement
Action in the Siimary of Findings Section of the enclosed inspection
report.
This notice is sent to you pursuant to the provisions of Section 2.201
of the NRC's " Rules of Practice," Part 2. Title 10, Code of Federal
Regulations. Section 2.201 requires you to submit to this office within
thirty days of your receipt of this notice, a written statement or
explanation in reply, including:
(1) corrective steps which have been
taken by you, and the results achieved; (2) ccrrective steps which will
be taken to avoid further items of noncompliance; and (3) the date when
full compliance will be achieve.d.
8001150 g
.,-y
-
-m,
- - - , +. -
- --
.-
_
-
_ _ _
. _ _ _ - - _
_ -_--
..
.
SEP 16 1975
Toledo Edison Company
-2-
In accordance with Section 2.790 of the NRC's " Rules of Practice." Part
2. Title 10, Code of Federal Regulations, a copy of this notice, the
enclosed inspection report, and your response to this notice will be
placed in the NRC's Public Document Room.
If this report contains any
information that you or your contractors believe to be propriotary, it
is necessary that you make a written application to this office, within
twenty days of your receipt of this notice, to withlmld such information
from public disclosure. Any such application must include a full statement
of the reasons for which it is clahd that the information is proprietary,
and should be prepared so the propriatary information idantified in the
application is contained in a separate part of the document. Unless we
receive an application to withhold information or are otherwise contacted
within the specified time period, the written material identified in
this paragraph will be placed in the Public Document Room.
l
Should you have any questions concerning this inspection, we will be
glad to discuss them with you.
Sincerely yours,
l
l
i
D. M. Hunnicutt, Chief
Construction and Engineering
Support Branch
Enclosure
IE Inspection Report No.
050-346/75-16
bec v/anel-
Local PDR
U. Young Park, Nuclear Engineer
lv
L