ML19317F575
| ML19317F575 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 10/20/1975 |
| From: | Hunnicutt D NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Roe L TOLEDO EDISON CO. |
| Shared Package | |
| ML19317F576 | List: |
| References | |
| NUDOCS 8001150896 | |
| Download: ML19317F575 (1) | |
See also: IR 05000346/1975016
Text
,
-
IBM CDd
('
.
-
UNITED STATES
l
NUCLEAR REGULATORY COMMISSION
REGION lit
799 ROOSEVELT ROAD
CLEN ELLYN, ILLINOIS 60137
10T 2 0 1975
Toledo Edison Company
Docket No. 50-346
ATIN: Mr. Imell Roe
Vice President, Power
Edison Plaza
300 Madison Avenue
Toledo, Ohio
43652
Gentlemen
Thank you for your letter dated October 9,1975, informing
us of the steps you have taken to correct the item of non-
comp 14==a= which we brought to your attention in our letter
dated September 16, 1975. We will aw==ina this matter during
a subsequent inspection.
'
'
Your cooperation with us is appreciated.
1
Sincerely yours,
D. M. m anieutt, Chief
Construction and Engineering
Support Branch
-
bec w/1tr dtd 10/9/75:
Local PDR
U. Young, Power
Siting Commission
,
.- -
s
r
,,;. x
-
/
8001150ff[