Monthly Operating Rept for Jan 1976
ML19317E705
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 07/09/1976
From: Tuckman M
DUKE POWER CO.
To:
Shared Package
ML19317E701 List:
References
NUDOCS 7912180857
Download: ML19317E705 (3)


Text

. . . ~

UNIT oconte Unit 2 V DATE 02/09/76

. DOCKET NO. 50-270 PREPARED BY M. s . Tu cime OPERATING STATUS

1. REPORTING PERIOD: January 1 THROUGH Januarv 31. 1976 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt): 25fdL. NET CAPABILITY (MWe-Net): 871
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) NONE
4. REASONS FOR RESTRICTION (IF ANY) s Month Year to Date Celathe
5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 735.9 735.9 9295.0
6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 717.5 717.5 8997.0
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWE) 1783359 1783359 21455787
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 607940 607940 7308496
11. NET ELECTRICAL ENERGY GENERATED (MWH) 580845 580845 6935996
12. REACTOR SERVICE FACTOR 98.9 98.9 75.9
13. REACTOR AVAILABILITY FACTOR 97.5 97.5 74.2
14. UNIT SERVICE FACTOR 96.4 96.4 73.'5
15. UNIT AVAILABILITY FACTOR 96.4 96.4 73.5
16. UNIT CAPACITY FACTOR (Using Net 89.6 89.6 65.1 Capability)

. 17. UNIT CAPACITY FACTOR o (Using Design Mwe) 88.0 88.0 '63.9

-18. UNIT FORCED OUTAGE RATE 3.6 3.6 23.7

19. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE & DURATION OF EACH:)

Refueling - May 3, 1976 - 5 Weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS R.' ACTOR WAS CRITICA1. X 100 UOURS IN REPORTING PERIOD REACTOR AVAIIABILI1Y FACTOR = HOURS REACTOR WAS AVAII1tRI.T. TO OPERATE Il0URS IN REPORTING PERIOD UNIT SERVICE FACT 0" = HOUPS CD:ERATOR ON 1.1NE HOURS IN REPORTING PERIOD UNIT AVAILABILITY FACTOR = 110UR3 UNIT WAS AVA11 Att.E TO GENERATE X 100 HOURS IN REPORTING PERIOD

. UNIT CAPACITY FACTOR = NET ELECTRICAL POWER CENERA Dh 121

[Nst C.npability or Design (Mwe-Net)'.) fl S IN p:P6hTAN PERIOD UNIT FORCED OUTACE RATE - FORCED OUTAGE HOURS X 100 HOURS GENERATOR ON 1.INE + FORCED OUIAGE HOURS

- . __ -w.

l DOCKET NO. 50-270 UNIT oconee Unit _2 DATE 02/09/76 AVERAGE D AILY UNIT POWER LEVEL  :

MONTH January 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

844 17 842 1

842 18 840 2

842 19 835 3

843 20 834 4

843 21 835 5

843 22 833 6

842 23 747 7

842 24 378 8

g 841 25 720 810 26 828 10 65 27 840 ,

11 594 28 839 12 741 29 R19 13 838 30 837 14 841 31 839 15 16 ~841 DAILY UNfT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

~ . - _ . . ._. -. _._ = .

D CKET NG. 50-270 UNIT SHUTDOWNS UNIT N AMli Oconee Unit 2 DATli 09/09/76 REPORT MONTil _ January 1976 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO. DATE S-SCHEDULED (HOURS) REASON (O THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 1 760110 F 18.72 F 1 Reactor was shutdown to identify reactor coolant system leakage 2 760123 F 7.82 B Unit was placed in hot standby to ,

inspect generator exciter.

(1) REASON (2) METilOI)

A EQUIPMENT I ALLURE lEXPLAIN)* l- M ANilA L B- MAINT. OR TEST. 2-MANUAL C. RLI ULLING SCR AM D-REGULAlORY RESTRICTION 3- AllTOM A TIC E-OPERATOR TRAINING AND SCR AM LICENSE EXAMINATION -

F- ADMINIST R ATIVE

, G-OPERATIONAL E RROR I

ILXPt AIN)

Il-OillLR (LXPLAIN)

SUMMAR Y:

Unit was base-loaded during the month.

~