. UNIT sconen Unit 1 DATE 02/09/76 V DOCKET NO. 50-269 PREPARED BY M. S. Tuckman OPERATING STATUS

1. REPORTING PERIOD: January 1 THROUGH Januarv 31. 1976 GROSS HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL (MWt):.2568 NET CAPABILITY (MWe-Net): 871 I
3. POWER LEVEL TO WHICH RESTRICTED (IF ANY):(MWe-Net) NONE
4. REASONS FOR RESTRICTION (IF ANY) l This Month Year to Date Cumulative
5. NUMBER OF HOURS THE REACTOR WAS CRITICAL 714.9 714.9 17487.0
6. REACTOR RESERVE SHUTDOWN HOURS - - -
7. HOURS GENERATOR ON-LINE 661.8 661.8 15592.6
8. UNIT RESERVE SHUTDOWN HOURS - - -
9. GROSS THERMAL ENERGY GENERATED (MWH) 1662183 1662183 35886325
10. GROSS ELECTRICAL ENERGY GENERATED (MWH) 567790 567790 12462510
11. NET ELECTRICAL ENERGY GENERATED (MWH) 540547 540547 11779196
12. REACTOR SERVICE FACTOR 96.1 96.1 78.3
13. REACTOR AVAILABILITY FACTOR 100.0 100.0 71.3
14. UNIT SERVICE FACTOR 89.0 89.0 69.9
15. UNIT AVAILABILITY FACTOR 89.0 89.0 70.0
16. UNIT CAPACITY FACTOR (Using Net 83.4 83.4 60.6 Capability)
17. UNIT CAPACITY FACTOR l (Using Design Mwe) 81.9 81.9 59.5
18. UNIT FORCED OUTAGE RATE 11.1 11.1 16.5
19. SHUTDOWNS SCHEDULED OVER NEXT 6 ECNTHS (TYPE, DATE & DURATION OF EACH:)

Refueling, February 7, 1976 5 Weeks

20. IF SHUTDOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

REACTOR SERVICE FACTOR = HOURS REACTOR WAS CRTTICAI,X 100 HOURS IN REPORTING PERIOD REACTOR AVAILABILI'IY FACTOR = HOURS REACTOR UAS AVAIL \El.E TO OPERATE 110VRS IN REPORTING PERIOD UNIT dERVICE FACTO:: = HOUPS CD:ERATOR ON LINE MO HOURS IN REPORTING PERIOD UNIT AVAIIABILITY FACTOR = IIOURS UNIT WAS A'.*All AEI.E TO GENERATE X 100 i HOURS IN REPokTING PERIOD l UNIT CAPACITY FACTOR = NET ELECTRICAL POWER CLNERATF M}80 Y 100 (Not Capability or Design (Mwe-Net)) X UOUllS .. R Ch ehT*t m.

PERIOD UNIT FORCED OUTACE RATE = FORCED OUTAGE HOURS

~

i H0ditS GENEPEEUi ON 1.INE + FORCED dUTAGE HOURS j

DOCKET NO. 50-269 UNIT oconee Unie 1 J DATE 02/09/76 4 l

AVERAGE DAILY UNIT POWER LEVEL i

MONTli January 1976 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) 840 17 832 1

838 18 815 2

839 19 829 3

839 20 R?o 4

840 21 830 5

839 22 99 6

839 23 7

8 837 24 836 25 170 9

747 26 79R 10 779 27 815 11 838 28 Aan 12 839 29 833 13 839 30 819 14 839 31 830 15 16 830 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS

- On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot . graph for each reporting month. Note that by usini, maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level line). In such c.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

u

D CKET NO. 50-269 UNIT SHUTDOWNS ,

UNIT NAMli Oconee Unit 1 DATli _02/_09176 REPORT MONTil January 1976 -

TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 1 760122 F 82.23 A 3 Unit trip due to protective relaying on generator.

(I) REASON (2) METilOlt A -EQUIPMENT F ALLURE (EXPLAIN) l-M ANilA L B - M AINT. OR TEST. 2-MANUAL C- RLI UL LING SCR AM D-REGULAlORY RESTRICTION 3 - AUTOM ATIC E-OPER ATOR TRAINING AND SCR AM LICLNSE EXAMINATION F- ADMINIS TR AllVE G- OPE R ATION Al l:RROR ILXPLAIN)

II-Ollit.R (EXPLAIN)

SUMMARY

Unit was base-loaded during the month.

,