Monthly Operating Rept for Oct 1974
ML19317E571
Person / Time
Site: Oconee  
Issue date: 11/08/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E556 List:
References
NUDOCS 7912180784
Download: ML19317E571 (3)


Text

~

~

Oconee III UNIT 11/8/74 DATE DOCKET NO.

OPERATING STATUS 1.

REPORTlhG PERIOD-October 1, 1974 TilROUGH October 31. 1974 HOURS IN REPORTING PERIOD:

745 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWth> 2568 MAX. DEPENDABLE CAI 4 CITY (Mwe. NET, 3.

LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (!F ANYl(MWc-NET) ha 4.

REASONS FOR RESTRICTION (IF ANYL THIS CL MULATIVE REPORTING P1 RIOD YR TO DATE TO D ATE 350.58 489.98 489.98 5.

HOURS REACTOR WAS CRITICAL.

N/A 6.

REACTOR RESERVE SHUTDOWN HOURS 284.35 355.65 355.65 7.

HOURS GENERATOR ON LINE.

N/A 8.

UNIT RESERVE SHUTDOWN HOURS,

9.

GROSS THERMAL ENERGY N/A GENER ATED (MWH) 10.

GROSS ELECTRICAL ENERGY 76949 76949 76949 GENER ATED h.n11) 11.

NET ELECTRICAL ENERGY GENER ATED N/A (MWH)

N/A 12.

REACTOR AVAILABILITY F ACTOR (11 N/A 13.

UNIT AVAILABILITY F ACTOR (2)

N/A 14.

UNIT CAPACilY F ACTOR (3)

N/A 15.

UNIT FORCED OUTAGE RATE (4),

16.

SHUTDOWNS SCHEDULED TO BLGIN IN NEXT 6 MONTHS (STATE lYPE.DATE. AND DURATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTlM ATED DATE 01 STARTUP:

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPER ATION) RE PORT TI1E FOLLOWING:

DATE LAST DhTE FORECAST ACH'IEVED 9/5/74 INITIAL CRITICALITY INITIAL ELECTRIC AL 9/18/74 POWER GENERATION 12/1/74 COMMERCIAL OPER ATION

'^

(1)

REACTOR AVAILABILITY FACTOR =

X 100 (2)

UNIT AVAILABILITY FACTOR H UR N RTING i DD NFT ELi CTRIC AL POWF R GF SE R ATFD (3)

UNIT CAPACITY FACTOR

=

(4)

UNIT FORCED OUTAGE R ATE

=

HOURS GL R

LINE + I'ORCF D OUTAGE HOURS 7912180[/p

.