Monthly Operating Rept for Oct 1974
ML19317E564
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 11/08/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E556 List:
References
NUDOCS 7912180781
Download: ML19317E564 (3)


Text

_ __

conee Unit 1 P

l' NIT b DATE 11/8/70 50-269 DOCKET NO.

OPERATING STATUS October 1, 1974 Tl! ROUGH October 31, 1974

1. REPORTING PERIOD:

HOURS IN REPORTING PERIOD: 745

2. CURRENTLY AUTHORIZED POWER LEVEL (MWthe 2568 MAX. DEPENDAHLE cal ACITY (Mue. NET. 871 _

None

3. LOWT.ST POWER LEVEL TO WHICH SPLCIFICALL) RESTRICTED (IF ANY (MWc-NET):
4. REASONS FOR RESTRICTION (IF ANY):

THIS CUMULATIVE REPORTINC PI RIOD YR TO DATE TO D ATE

5. HOURS REACIOR WAS CRITICAL. 383.1 5446.6 9800.5
6. REAC" TOR RESERVE SHUTDOWN HOURS .

0 0 0

7. HOURS GENERATOR ON LINE. .

340.5 5265.2 8254.3

8. UNIT RESERVE SHUTDOWN HOURS . 0 0 0
9. GROSS THERMAL ENERGY GENER ATED (MWH) 690694 12226629 18237510
10. GROSS ELECTRICAL ENERGY GENER ATED (MMit 227472 4230112 6318700
11. NET ELECTRICAL LNERGY GENER ATED 209487 4000606 5959684 gg,g3 ,, ,

51.4 74.7 86.3

12. REACTOR AVAILABILITY F ACTOR (1) 49.3 72.5 72.9
13. UNIT AVAILABILITY f ACTOR (2) 32.3 62.9 60.3
14. UNIT CAPACITY F ACTOR ():

.8 .0 7.7

15. UNIT FORCED OUTAGE RATE (4) .
16. SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACH):
17. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE 01 STARTUP: November 24, 1974
18. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) RE PORT Ti!E FOLLOwING:

DATE LAST DkTE FORECAST ACH'IEVED INITIAL CRITIC ALITY INITIAL ELECTRICAL POWER GENERATION COMMERCIAL OPERATION (1) REACTOR AVAILABILITY FACTOR = X 100 (2) UNIT AVAILABILITY F ACTOR = --X 100 ,

3 NET Ell'CTRICAL POETR t;t NE R ATED

=

(3) UNIT CAPACITY FACTOR MAX. DLPENDABLL CAPAl'IT) (MWe-NLT) X HOURS IN REPOR f!NG PERl('D

=

(4) UNIT FORCED OUTAGE RATE HO S 'R

+ i ORCE D OUTAGE HOURS

.rg g i g 1 8 0 N/-

50-269 DdCKET NO.

UNIT SHUTDOWNS UNIT NAMii Oconee Unit 1.

DATE November 8, 1974 REPORT MONTil October, 1974 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS }

14 741005 F 73.5 B 1 15 741016 F 17.0 A 3 16 741019 S 287.5 C 1 (1) REASON (2) METilOD A -EQUIPMENT F AILUPE (EXPLAIN) 1 -M ANilAl 3-MAIN'T.OR TEST. 2-MANUAL C- REI ULLING SCR AM

)

D-REGULATORY RESTRICTION 3- AUTOMATIC E-OPER ATOR TRAINING AND SCRAM I K E NSE EXAMINA110N F- ADMINISTR AllVE G - OPE R AllON A L I'R ROR (L XPl. AIN)

II-Ollil.R (EXPl.AIN)

SUMMARY

DOCKET NO. 50-269 UNIT oconee 1 DATE 11/8/71 AVERAGE DAILY UNIT POWER LEVEL Oct ber, 1974 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

816 17 94o 1

789 18 462 2

706 3g _n_

3 706 20 4 375 21 5

~

22 6 23 7 38 24 8 25 9 10

'561 26 681 27 11 690 12 28 702 29 13 33 30 14 31 15 276 16 1

DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting mc. nth. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power lesel line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

l l