ML19317E569

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Oct 1974
ML19317E569
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/08/1974
From:
DUKE POWER CO.
To:
Shared Package
ML19317E556 List:
References
NUDOCS 7912180783
Download: ML19317E569 (4)


Text

.

,s Oconee II UNIT

~

D ATE 50-270 DOCKET NO.

OPERATING STATUS October 31, 1974 October 1, 1974 TilROUGH 1.

REPORTING PERIOD.

HOURS IN REPORTING PERIOD:

745 2.

CURRENTLY AUTHORIZED PO%ER LEVEL (MWmi 2568 MAX. DEPENDAHLE CAI ACITY tMWe. NET. R71 M=

3.

LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRICTED (IF ANYI(M%c. NET) 4.

REASONS FOR RESTRICTION (IF ANYL THIS CL MULATIVE REPORTING PI RIOD YR TO DATE TO D ATE 5.

HOURS REACTOR WAS CRITICAL.

203.0 699.0 699.O 6.

REACTOR RESERVE SHUTDOWN HOLRS 0

0 n

7.

HOURS GENERATOR ON LINE.

190.5 623.9 An. o 8.

UNrf RESERVE SHUTDOWN HOURS 0

0 0

9.

GROSS THERMAL ENERGY GENER ATED (MWH) 403970 1337839 1337R39 10.

GROSS ELECTRICAL ENERGY GENERATED (MW10 137340 455996 455996 11.

NET ELECTRICAL ENERGY GENER ATED 125397 425153 425153 (MWH) 27.2 52.6 52.6 12.

REACTOR AVAILABILITY F ACTOR (1, 25.6 49.0 49.0 13.

UNIT AVAILABILITY F ACTOR (2) 19.3 38.3

_38.3 14.

UNIT CAPACITY E ACTOR (36 74.4 50.7 50.7 15.

UNIT l'ORCED OUTAGE RATE (4, 16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE TYPE.D ATE. AND DUR ATION OF EACH1:

17.

IF SHUT DOWN AT END OF REPORT PERIOD.ESTIM ATED DATE 01 STARTUP:

18.

UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPER ATION) R E PORT THE FOLLO41NG:

DATE LAST DkTE FORECAST ACH'IEVED INITI AL CRITICALITY INITIAL ELECTRIC AL POWER GENERATION COMMERCIAL OPERATION (1)

REACTOR AVAILABILITY F ACTOR =

t00 0

X 100 (2) UNIT AVAILABILITY F ACTOR

=

p (3) UNIT CAPACITY FACTOR

=

MAX. DtPENDABLL CAPAt'lT) (MWe SETI A HOUR 5 IN REPOR flNG PERIOD 83 391218o

s DdCKET NO.

50-270 oc noe Unit 2 UNIT SHUTDOWNS UNil NAME November 8, 1974 DATli REPORT MONTil September, 1974 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONSKOMMENTS f

1 740909 F

13.9 B

3 2

740917 F

15.8 B

3 3

740923 F

3.5 A

3 4

740927 F

3.5 A

3 5

740928 F

49.2 A

1 (1) REASON (2) METlf01)

A -EQUIPMENT F AILURE (EXPLAIN) 1-MANUAL B-MAINT. OR TEST.

2-MANUAL C-REI'UELING SCR AM D-REGULATORY RESTRICTION 3-AUTOM ATIC E-OPERATOR TRAINING AND SCRAM LICENSE EXAMINATION F-ADMINISTR A IIVE G-OPERAllONAL FRROR (EXPLAIN)

Il- 0TilL R (LXPLAIN)

SUMMARY

DUCKET NO.

50-270 Oconee Unit 2 UNIT SHUTDOWNS UNIT NAMii November 8, 1974 DME REPORT MONTil October, 1974 TYPE METHOD OF F FORCED DURATION SHUTTING DOWN NO.

DATE S SCHEDULED (HOURS)

REASON (t)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS 5

740928 F

554.5 A

1 (1) REASON (2) METilOD A EQUIPMENT I ALLURE (EXPLAIN) 1 -M ant!A L B-MAINT. OR TEST.

2-MANUAL C-REI UI. LING SC R AM D-REGULAlORY RESTRICTION 3 - AUTOM ATIC E-OPER ATOR 1 RAINING AND SCRAM LICENSE EXAMINATION F-ADMINIS1 R AllVE G-OPLR ATRON Al. I RROR (LXPLAIN)

II-01111 R (EXPLAIN)

SUMMARY

50-270 DOCKET NO.

ggg.g. Oconee 2 11/6/74 DATE AVERAGE DAILY UNIT POWER LEVEL MONTH October, 1974 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net)

. 37

_o_

1 2

18 - 3 19 4

20 ' ~~

21 5

_ 6 22 7

23 _-

312 8

24 646 g

25

. 553 10 26 11 27 630 12 28 799 13 29 819 _ 30 835 14 15 31 834 16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the dailv average power level exceeds the 1007c line tor the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly,