Text
.
O
~
OPERATING DATA REPORT DOCKET NO. 50-287 DATE 08-15-76 COMPLETED BY J.
A. Reavis TELEPHONE ( 70l. ) 373-8552
- OPERATING STATUS Oconee Unit 3 Notes
- 1. Unit Name:
Year-to-date and cumulative i
.. Reporting Penod:
July, 1978 capacity factors are calcu-
- 3. Licensed Thermal Power (MWr):
2568 lated using a weighted aver-
- 4. Nameplate Rating (Gross Mwe):
934 age for maximum dependable 887
- 5. Design Electrical Rating (Net MWe):
capacity.
- 6. Maximum Dependable Capacity (Gross MWe):
899 860
- 7. Maximum Dependable Capacity (Net MWe):
S. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Level To Which Restricted. If Any (Net MWe):
- 10. Reasons For Restrictions.If Any:
This Month Yr..to-Date Cumulative 74!.0 5,087.0 31,775.0
- 11. Hours in Reporting Period 443.6 4,090.2 24,254.7
- 12. Number Of Hours Reactor Was Critical
- 13. Reactor Reserve Shutdown Hours
- 14. Hours Generator On.Line 379.5 3,978.9 23,552.6
- 15. Unit Reserve Shutdown Hours
- 16. Gross Thermal Energy Generated (MWH) 797,919 9,615,442 55,848,762
- 17. Gross Electrical Energy Generated (MWH) 268,670 3,354,960 19,306,804
- 18. Net Electrical Energy Generated (MWH) 248,942 3,197,508 18,370,115
- 19. Unit Service Factor 51.0 78.2 74.1
- 20. Unit Availability Factor 51.0 78.2 74.1
- 21. Unit Capacity Factor (Using MDC Net) 38.9 73.1 66.7 37.7 70.9 65.2
- 22. Unit Capacity Factor (Using DER Net) 0.0 3.9 12.6
]
- 23. Unit Forced Outane Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Eacht:
)
None 1
- 25. If Shut Down At End Of Report Period. Estimated Date of Startup-
- 26. Units in Tut Status aPrior to Commercial Operation):
Forecast Achieved i
INITIAL CRITICALITY l
INITIAL ELECTRICITY 1
COMMERCIAL OPERATION 7912180 ((]
(c!77)
t IINil SiltllDOWNS AND POWI.H HI:DiffilONS I)DCKl:I NO.
50-287 UNilNAMI:
Oconee Unit 3 n3 3,.:
UBZl F 78 - -
HI.PUH I MIINiil JULY, 1978 COMPI l'Il'H llY J. A. Heavis
,,,jyj 9.;
37g47373:8552
~
3E h
[d 1.it rince
( 8,
'l fanse.5 Cosari.five N".
DHe
~
5g 4
js@
I vent av 9?
Attion to 7
$E
~ 5, g iteport n ifM E'
Pervent Itriurrem e H
e U
o 18 78-07-01 S
360.53 C
1 RC FUELXX Scheduled refueling cont'd 19 78-07-16 S
B ZZ ZZZZZZ Power escalation testing 20 78-07-20 F
D RC FUELXX Xenon hold 21 78-07-21 F
B Cll PUMPXX "A" FWP drain valve repair 22 78-07-21 F
D RC FUELXX Xenon hold 23 78-07-22 F
H ZZ ZZZZZZ Investigation of noise picked up by the loose parts monitor I
24 78-07-23 F
D RC FUELXX Xenon hold 25 78-07-29 S
3.99 B
1 IIA TURBIN Scheduled turbine trip test 26 78-07-30 F
B RC FUELXX Xenon hold I
2 1
.I 1: l'insed ite.non:
Method:
l~xhiliit G Instim lii.es l
S-Stheilnied A l'ignipment I ailme (I xplain) 1.M.m nal fin Picparation of D.na il Maintenance of l'est 2 M.mnal Steam.
1:ntsy Sheces t n 1 iicnu c C-Refueling 1-Automatic Stram.
livent Repml (1.110 l'de (Niliti G-D-Reputatory Restein lion l Olher (1 xplain) 11161)
I?Opciator l'eaining.t Iit ense I:samination l' Aihninistialisc 5
G Opciational 1 nos (I:xplain) 1.shibit I - S nne Sinnce
,~
C8/Tl) ll Olhes (l'.xplain )
AVERAGE DAILY L' NIT POWER LEVEL 50-287 DOCKET NO.
Oconee Unit 3 WIT DATE 08-15-78 J. A. Reavis COMPLETED BY p
(704) 373-8552 MONTH JULY, 1978 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (Mhe-Net) i yw,,3,,3 304 1
17 457 1E 612 3
g9 4
20 627 5
671 73 754 6
701 23 804 3
24 843 9
25 10 842 3
846 11 7
850 12 2S 90 13 29 14 30 709
~
15 31 261 16 i
INSTRUCTIONS On this format, list the average datly unit power level in MWe Net for each day in the reporting month. Compute to the nearest whole megawatt.
toi77)
I
~-
MOaTHLY Pa u..1.ING INFORMAT!ON RL.,JST 1.
Facility na=e:
Oconee Unit 3 2.
Scheduled next refueling shutdown:
July 29, 1979 3.
Scheduled restart following refuaidng:
September 16, 1979 4.
Will refueling or resu=ption of operation thereafter require a technical speed #1 cation change or other license amend =ent?
If yes, what vd11 these be? Amendment to incorporate technical specifications for Cycle 5.
If so, has reload design and core configuration been reviewed by Safety Review Co=mittee regarding unreviewed safety questions?
If nc, when is review scheduled?
5.
Scheduled date(s) for submit-d g proposed licensing action and suppor ing da#crsation: June 16, 1979 6.
I=portant li'.ansing considerations (new or d4*ferent design or supplier, unreviewed d sign or performance analysis methods, significant changes in design or nes operating procedures). None 7.
Number of fuel assemblies (a) in the core: 177 (b) in the spent fuel pool:
326 465 8.
Present licensed fuel pool capacity:
Size of requested or planned increase: No increases planned 9.
Projected date of last refueling which can be accommodated by present licensed capacity: 3/3/80 assuming no transfers DUEI POWER COMPANY Date: August 15, 1978 Name of
Contact:
Jerel A. Reavis i
DOCKET NO:
50-287 UNIT:
Oconee Unit 3 DATE:
08-15-78 NARRATIVE SUMMAPJ MONTH: grits t, 1978 The month began with the unit in refueling shutdown.
On July 12 at 1900, Zero Power Physics Testing started. Testing was complete on July 16 at 0032 and the unit was returned to service. Power reached 40% and was held for power escalation testing. Power level reached 75% on July 18 and again held for testing. Reactor power reached power level cut off on July 20 at 1756.
On July 21, power level was decreased to 65% to secure 3A FWPT to reset relay control. The 3A FWPT was returned to service and started increasing power at 2024 on July 21.
Power level was held at 94% on July 22 due to powdex resin trap D.P. high.
On the same day started decreasing power 3 MW/ minute uue to noise on LPM.
Reactor power was increased to 100% on July 24 at 1226.
On July 29 at 2100, commenced reducing reactor power to 15% to perform tur-bine trip test.
Generator went off line at 2357. Unit was returned to ser-vice at 0356 on July 30.
Reactor reached power level cut off at 1900.
On July 31, reactor reached near rated full power and retained power level for remainder of the month.
OCOEEE NUCLEAR STATION MONTHLY OPERATING REPORT August, 1978 i.
Personnel Exposure For the month of June, no individuais exceeded 10 percent of their allowable annual radiation dose limit.
2.
Radioactive Waste Releases The total station liquid release for June has been compared with the Technical Specifications annual value of 15 curies; the totai release for June was less than 10 percent of this limit.
The total station gaseous release for June has been compared to the derived Technical Specifications annual value of 51,000 curies; the total release for June was less than 10 percent of this limit.
.