Forwards Insp Rept 50-269/74-05 on 740710-12,16-18 & 24-26. Violations Noted
ML19317E481
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 08/14/1974
From: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Thies A
DUKE POWER CO.
Shared Package
ML19317E472 List:
References
NUDOCS 7912180726
Download: ML19317E481 (3)


See also: IR 05000269/1974005

Text

_ .. -

.._7. 7

..

7-

_ _ _ _ - - .

.

  • '

iV)

~ ^ ~ ~ ~ '

~

'

,

. l' "4'

D[x.~

UNITED STATES

..

ATOMIC ENERGY COMMISSION

YM.j. I

DIRECTOV.TE OF F3}UL.lTCpY CPZRATIONS

,

~

a7

.

g gy[.

aEo.ou o - suo e ets

.-

2n oracsr9EE 5?AEE'

N C R T M ** F s r

,1m.~r.. ce m.

xm

,g,,,

. , , c , 3 , , ;. 3

In Reply Refer To:

R0:II:TNE

gyg 141974

50-269/74-5

Duke Power Company

ATTN:

Mr. A. C. Thies

Senior Vice President

Production and Transcir,sion

Power Building

422 South Church Street

Charlotte, North Carolina

28242

Gentleren:

This refers to the inspection conducted by Messrs

G. R. Jenkins of this office on July 10-12

. T. N. Epps and

Oconee 1 facility, and to the discussion of our find

,

r the

Messrs. Epps and Jenkins with Mr. J. E. Snith at

s held by

the inspection.

the conclusion of

enclosed inspection report. Areas examined during the inspection a

are discussed in the

of selective examination of procedures and representative rWithi

interviews with personnel, and observations by the i s

ecords,

n pector.

The results of our followup of previously identified c t

contained in the enclosed report as follows:

a ters are

The status of our review of the iters which you previo

a.

by letter to us is discussed in Section V of the summarf-

usly reported

enclosed report.

of the

b.

The results of our inspection of your corrective actio

the enclosed report. identified violatiens are discussed in Section II of

n on previously

uccary of

ihe status of unresolved itens identified in previous i

c.

reports is discussed in Section IV of the summary of the enclosed

nspection

report.

7912180

-

..

e

_-

_-

_

_ _ _ . _ , _ _ _ _ . _ .

_ _ _ .

_ . _ _ _ . _ _

-

.

.

.

.

-

.

,,

'

. Duke Power Co=pany

-2-

New unresolved items are identified in Section III of the summary cf the

enclosed report.

9

During the inspection, it was found that certain activities under'your

license appear to be in violation of AEC requirements.

The violations

and reference to pertinent requirements are listed in Section I of the

summary of the enclosed report.

The violations in Section I were found,

corrected and reported by Duke Power Co:pany and no further response is

requested.

We are concerned about the timeliness of your corrective actions.

Re-

garding the item discussed in paragraph II. A.l. of the su= mary of the

report, all of the corrective action described in your letter dated

May 24, 1974, had not been implemented at the ti=e of the inspection.

In this case a door had been erected to the specific high radiation area

identified in the citation but doors had not been installed in other

high radiation areas. As you are aware, we are as interested in prompt

action to correct and prevent similar violations as we are in action to

correct the specific violation cited.

It is also noted that the items

discussed in paragraphs II.A.S. and II.A.6. were incompletely answered

in your letter dated Eby 24, 1974, and that we have verbally requested

supplemental information which we still have not received.

Accordingly,

please provide, in writing within 20 days , actions which have been taken

or are planned to improve the ti=eliness of corrective actions. You are

also requested to include a date when you will provide the information

needed to co=plete our review of the items discussed in paragraphs II. A.S.

and'II.A.6.

In accordance with Section 2.790 of the AEC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a ecpy of this letter and the

enclosed inspection report will be placed in the AEC's Public Document

Room.

If this report contains any infor:ation that you believe to be

proprietary, it is necessary that you submit a written application to

this office requesting that such information be withheld frem public

disclosure.

If no proprietary 'information is identified, a written

statement to that effect should be submitted.

If an application is

subtitted , it must fully identify the bases for which information is

claimed to be proprietary. The applicatien should be prepared so that

information sought to be withheld is incorporated in a separate paper

and referenced in the application since the application will be placed

in the Public Docu=ent Room. Your application, or written statement,

should be submitted to us within 20 days.

If we are not contacted as

-specified, the enclosed report and this letter may then be placed in the

Public Docurent Room.-

- -

.

J

.

.

.

-

.

-

.

, . ,

,

Duke Pcwer Company

-3-

Should you have any questions concerning this letter, we will be glad

to discuss them with you.

Very truly yours,

!-> yl'Y.._. .

,

/)- l

%

/ j' 'j'p. , ,:z e s.

' '

l-

'

.-

Norman C. Moseley

Director

Enclosure :

RO Inspection Rpt. No.

50-269/74-5

.

e

.

.

,

,

r,

.

Letter to Duke Power Company fn N. C. Moseley

'.

dtd*

4

AUG 1 1974

DISTRIBUTION:

H. D. Thornburg, R0

RO:HQ (4)

Directorate of Licensing (4)

', DR Central Files

'

  • NSIC
  • DTI E , OR
  • State

,

  • To be dispatched at a later date.

,

a

.

.1

m?w+

.m

--esm

-

AeA

mm,m

a

4&

m

o.,swwmda

.

.

.

-

-

c.

.

.

AUG 141974

Duke Power Ccmpany

Oconee 1

-;

RO Inspection Report No.

50/269/74-5

.

cc w/ enc 1:

H. D. Thornburg, R0

RO:HQ (5)

DR Central Files

Regulatory Standards (3)

Directorate of Licensing (13)