. ,h . UNIT Oconee Unit 3 D ATE 2/7/75 DOCKET NO. 50-287 OPERATING STATUS

1. REPORTING PERIOD: January 1, 1975 TiiROUGH January 31, 1975 HOURS IN REPORTING PERIOD: 744
2. CURRENTLY AUTHORIZED POWER LEVEL fMWtni 2568 MAL DLPENDAliLE CAI ACITY (Mwe NET, 871
3. LOWEST POWER LEVEL TO WHICH SPECIFICALL) RI.STP CTED(1) ANYi #Mwe. NET): None
4. REASONS FOR RESTRICTION (IF ANY):

THIS CL MULATIVE REPORTING Pl RIOD YR TO DATE TO D ATE 489.3 489.3 673.2 S. HOURS REACTOR WAS CRITIC AL.

0 0 0

6. REACTOR RESERVE SHUTDOWN HOLRS 7.

461.1 461.1 643.8 HOURS GENERATOR ON LINE. .

0 0 0

8. UNIT RESERVE SHUTDOWN HOUR 3
9. GROSS THERMAL ENERGY GENER ATED (Mw H) .

1082950 1082950 1527600

10. GROSS ELECTRICAL ENERGY GENER ATED (Mwiu ,

379560 379560 528474

11. NET ELECTRICAL ENERGY GENER ATED 360255 360255 501391 (MWH) ....
12. RLACTOR AVAILABILITY F ACTOR (1, 65.8 65.8 59.7
13. UNIT AVAILABILITY F ACTOR (2) 62.0 62.0 57.1
14. UNIT CAPACITY F ACTOR (3) ..

55.6 55.6 51.0 l$. UNIT I<ORCED OUTAGE RATE (4) . .

38.0 38.0 42.9

16. SHUTDOWNS SCHEDULED TO BLGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACH);
17. IF SHUT DOWN AT END OF REPORT PERIOD. ESTIM ATED DATE 01 STARTUP:
18. UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) RE PORT Tile FOLLOwlNG:

DATE LAST D4TE FORECAST ACH'IEVED INITIAL CRITICALITY INITIAL ELECTRIC AL POWER GENER ATION COMMERCIAL OPERATION

^ ^

(1) REACTOR AVAILABILITY F ACTOR X 100 O

(2) UNIT AVAILABILITY F ACTOR

  • X 100 p ,

NFT ELI CTRICAL POwTR G NE R ATFD UNIT CAPACITY FACTOR =

(3) , , ,

p UNIT FORCED OUTAGE R ATE =

(4)

HOURS GL

  • R LINE + FORCE D OUT AGE HOURS 79121807[b

, ,, . :m DOCKET NO. 50-287 UNIT oconee Unie _3 DATE 2/7/75 AVERAGE DAILY UNIT POWER LEVEL January, 1975 MONTH AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net) DAY (MWe-net) .

787 0 37 1

0 767 2 18 jg 732 0

3 0 go 775 a

0 21 843 5

0 22 856 6

0 23 775 7

0 828 8 24 846 g 0 25

' 0 846 10 26 0 27 850 11 8 28 757 12 613 29 847 13 720 30 854 14 759 31 853 15 817 16 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS

- On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that b- usini, maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 1007c line (or the restricted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO. 50-287 UNIT SHUTDOWNS UNIT NAMii Oconee Unit 3 ' .

DATli 2/7/75  ?

REPORT MONTil January, 1975 TYPE METHOD OF -

F-FORCED DURATION SHUTTING DOWN NO. DATE S SCHEDULED (HOURS) REASON (1) THE REACTOR (2) CORRECTIVE ACTIONS / COMMENTS 01 741223 F 307.0 11 1 Excessive condenser air leakage (1) REASON (2) METilOD A EQUIPMENT I ALLURE (EXPLAIN) 1-M ANI'AL B- MAINT. OR TEST. 2-MANUAL C- RLI'ULLING SCR AM D-REGULATORY RESTRICTION 3- AUTOM ATIC E-OPERATOR TRAINING AND SCRAM '

'j LICENSE EXAMINATION F- ADMINISTR AllVE G-OPERATIONAL ERROR gEXPLAIN) ll-01111 R (EXPLAIN)

SUMMARY

_. _ _ - - - - _ _