Monthly Operating Rept for Jan 1975
ML19317E460
Person / Time
Site: Oconee  
Issue date: 02/07/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19317E457 List:
References
NUDOCS 7912180712
Download: ML19317E460 (3)


Text

_

Oconee Unit 2 UNIT Februarv 7, 1975 D ATE 50-270 DOCKET NO.

OPERATING STATUS 1.

REPORTING PERIOD:

January 1.

1975 TilROUGH

.T a mi n ry 11_ 107; HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED POWER LEVEL (MWthi 256R MA.\\. DEPENDABLE CAI ACITY tMwe. NET, R71 None 3.

LOWEST POWER LEVEL TO WHICH SPECIFICALL) RESTRIGED (Il ANYB tM%c. NET):

4.

REASONS FOR RESTRICTION (IF ANY1:

THIS CL MULATIVE REPORTING PI RIOD YR TO DATE TO D ATE 437.4 437.4 2383.5 5.

HOURS REACTOR W AS CRITICAL.

0 0

0 6.

REACTOR RESERVE SHUTDOWN HOCRS 429.3 429.3 2304.7 7.

HOURS GENERATOR ON LINE.

0 0

0 8.

UNIT RESERVE SHUTDOWN HOURS..

9.

GROSS THERMAL ENERGY 1055278 1055278 5362176 GENER ATED (MWHj 10.

GROSS ELECTRICAL ENERGY 357490 357490 1826466 GENERATED (M%11, 11.

NET ELECTRICAL LNERGY GENER ATED (MWH) 337583 337583 1795109 58.8 58.8 68.5 12.

REACIOR AVAILABILITY F ACTOR (1) 13.

UNIT AVAILABILITY f ACTOR (2) 66 ?

57 7 57 7 52 1 52 1 56 9 14 UNIT CAPACllY F ACTOR (3) 42.7 42.7 33.6 15.

UNIT FORCED OUTAGE RATE (4).

16.

SHUTDOWNS SCHEDULED TO BEGIN IN NEXT 6 MONTHS (STATE 1YPE.DATE. AND DUR ATION OF EACH):

17.

IF SHUT DOWN AT END OF REPORT PERIOD ESTIMATED DATE 01 STARTUP:

February 16, 1975 18.

UNITS IN TEST STATUS (PRIOR TO COMMERCI AL OPERATION) RE PORT THE F OLLO%!NG:

DATE LAST D4TE FORECAST ACHIEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENE R ATION COMMERCIAL OPER ATION

^

(1)

REACTOR AVAILABILITY FACTOR =

X 100 O

-X 100 (2)

UNIT AVAILABILITY FACTOR

=

p NET EllrTRICAL POWF R t;F NER ATF D (3) UNIT CAPACITY FACTOR

=

MAX. DLPENDABLL CAPACIT) tMWe-blT) X HOURS IN REPOR flNG PLKlOD (4)

UNIT FORCED OUTAGl: RATE OURS G TOR LINE + i ORCFD OUT AGE HOURS 7912180 7 [

?

50-270 DOCKET NO.

UNIT Oconee Unit 2 DATE Februarv 7, 1975 AVERAGE DAILY UNIT POWER LEVEL MONTH Januarv. 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 826 829 17 1

810 832 18 2

0 511 jg 3

0 603 20 4

0 742 21 5

0 822 22 6

0 7

832 23 0

830 24 8

0 820 25 g

0

'819 26 10 805 27 0

11 0

829 28 12 0

829 29 13 0

829 30 14 0

828 31 15 825 16 DAILY UNTT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100'To line (or the restricted power level hne). In such c.ises. the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

D CKET NO.

50-270 oi onee Unit 2 -

UNIT SHUTDOWNS UNil NAMii DATi! February 7, 1975 REPORT MONTil January, 1975 TYPE METHOU OF F FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS i

01 750103 F

3.8 A

1 Crack in main steam instrument line weld 02 750119 F

310.9 A

1 Leaking pressurizer relief (1) REASON (2) METIK)D A -EQUIPMENT S AILURE (EXPLAINI l-M ANtf AL B-MAIN T. OR TEST.

2-M ANtf AL C-REI tlELING SCR AM D-REGULAlORY RESTRICTION 3-AUTOM ATIC E-OPFRATOR TRAINING AND SCRAM

)

LICENSE EXAMINATION F-ADMINISTR AllVE G-OPERAllONAL ERROR (EXPLAIN) 11 -OlllLR (E XPLAIN)

SUMMARY

- - - - -.