Monthly Operating Rept for Jan 1975
ML19317E458
Person / Time
Site: Oconee 
Issue date: 02/07/1975
From:
DUKE POWER CO.
To:
Shared Package
ML19317E457 List:
References
NUDOCS 7912180711
Download: ML19317E458 (3)


Text

-

Oconee Unit 1 UNIT Februarv 7, 1975 DATE 50-269 DOCKET NO.

OPERATING STATUS 1.

REPORTING PERIOD.

January 1, 1975 TliROUGH January 31, 1975 HOURS IN REPORTING PERIOD:

744 2.

CURRENTLY AUTHORIZED PO%ER LEVEL (MWth, 2568 M AX. DEPENDAHLE CAI ACITY (Mue. NET.

871 hN 3.

LOWEST POWER LLVEL TO WHICH SPLCIFICALLi RESTRICTED (11 ANY6iMWt. NET):

4.

REASONS FOR RESTRICTION (IF ANY):

THIS CL MULATIVE REPORTING PI RIOD YR IO DATE TO D ATE 0

0 9800.5 5.

IlOURS REACTOR WAS CRITiAL.

O O

O 6.

REACTOR RESERVE SlitTDOk N HOLRS 7.

HOURS GENERATOR ON LINE.

O u

8254.3 0

0 0

8.

UNIT RESERVL SHUTDOWN HOURS 9.

GROSS THERM AL ENERGY 0

0 18237510 GENER ATED (MWH) 10.

GROSS ELECTRICAL ENERGY O

C 6318700 GENE R ATED t MWili 11.

NET ELECTRICAL LNERGY GENER ATED

-6039

-6039 5946980 (MWH)

O O

72.3 12.

REACTOR AVAILABILITY F SCTOR (1, 0

0 60.9 13.

UNIT AVAILABILITY F ACTOR (2) 0 0

50.4 14.

UNIT CAPACITY F ACTOR (3, 0

0 7.8 15.

UNIT FORCED OUTAGE RATE (4) 16.

SHUTDOWNS SCilEDULED TO BLGIN IN NEXT 6 MONTHS (STATE TYPE.DATE. AND DUR ATION OF EACHl:

17.

IF SHUT DOWN AT END OF REPORT PERIOD. ESTIMATED DATE 01 STARTUP:

February 15, 1975 18.

UNITS IN TEST STATLS (PRIOh TO COMMERCIAL OPER ATION) RE PORT TIIE IOLLOnlNG:

DATE LAST D4TE FORECAST ACH'IEVED INITIAL CRITICALITY INITIAL ELECTRICAL POWER GENE R ATION LVMMERCIAL OPl: RATION (1)

REACTOR AVAILABILITY F ACTOR X 100 O

X 100 (2) UNIT AVAILABILITY F ACTOR

=

(3) UNIT CAPACITY FACTOR

=

MAX. DLPENDABLI.CAPACIT) sMw e NET) A HOUR 5 f N RtPOR TINU PLRIOD (4)

UNIT FORCED OUTAGl: RATE

=

IOURS GL RTR N LINE + f ORCF D OUT 4GE HOURS 79121807((

.g 50-269 DOCKET NO.

UNIT oconee Unit _1 DATE February 7, 1975 AVERAGE DAILY UNIT POWER LEVEL MONTH January, 1975 AVERAGE DAILY POWER LEVEL AVERAGE DAILY POWER LEVEL DAY (MWe-net)

DAY (MWe-net) 0 0

17 1

0 0

2 18 0

o 3

39 0

0 g

4 0

0 21 5

0 0

22 6

0 0

23 7

8 24 0

0 0

0 25 9

0 O

26 10 0

11 0

27 0

12 0

28 0

13 0

29 0

0 30 14 0

0 15 31 0

16 DAILY UNIT POWER LEVEL FORM INSTRUCTIONS On this form, list the average daily unit power level in MWe-net for each day in the reporting month.

Compute to the nearest whole megawatt.

These figures will be used to plot a graph for each reporting month. Note that by using maximum dependable capacity for the net electrical rating of the unit. there may be occasions when the daily average power level exceeds the 100% line (or the restncted power level line). In such cases, the average daily unit power output sheet should be footnoted to explain the apparent anomaly.

50-269 D CKET NO.

UNIT SHUTDOWNS UNIT N AME Oconee Unit l' DATii 2/7/75 REPORT MONTil January, 1975 TYPE METHOD OF F-FORCED DURATION SHUTTING DOWN NO.

DATE S-SCHEDULED (HOURS)

REASON (1)

THE REACTOR (2)

CORRECTIVE ACTIONS / COMMENTS t

16 741019 S

744.0 C

1 (t) RE ASON (2) METilOD A EQUIPMENT I-AILURE IEXPLAIN)

'-MANUAL B-MAINT. OR TEST.

.-MANUAL C. RLI L'LLING SCR AM D-REGULA10RY RESTRICTION 3 - AUTOM AT!C E-OPFRATOR TRAINING AND SCRAM

)

LICENSE EXAMINA110N F-ADMINISTR AllVE G-OPERAllONAL ERROR ILXPL4tN) 11-01111 R IEXPLAIN)

SUMMARY

.