ML19317D711

From kanterella
Jump to navigation Jump to search
Forwards RCS Incident Rept in Response to NRC Requests. Identifies Sequence of Events & Extent of Damage Associated W/Loose Parts Resulting from Failure of Several Reactor Internal Components During Hot Functional Testing of Unit 1
ML19317D711
Person / Time
Site: Oconee Duke Energy icon.png
Issue date: 04/04/1972
From: Thies A
DUKE POWER CO.
To: Morris P
US ATOMIC ENERGY COMMISSION (AEC)
Shared Package
ML19317D712 List:
References
NUDOCS 7912100486
Download: ML19317D711 (1)


Text

-l

~

DuxE POWER COMPANY Powra Burtorwo 4aa SouTu Cuunca SrazzT, CHAnzorrz, N. C. asaos A C THits P, o. Box as7e st eiOn vice Passentar 8' AO DU C T IO pe aseD Taasenhel&SIOpe Regulatory We Cy.

April 4, 1972 V

Dr. Peter A. Morris, Director 3

Division of Reactor Licensing APR7 1072 "

Atomic Energy Commission h

M7 Washington, D. C.

20545 ma n.l, 8

Reference:

Ocotaee Nuclear Station g

Unit 1 o,

Docket No. 50-269

Dear Dr. Morris:

Duke Power Company herewith submits forty (40) copies of " Reactor Coolant System Incident Report" in response to requests by your staff. This report identifies the sequence of events and extent of damage associated with loose parts which resulted from the failure of several reactor internal components during Hot Functional Testing of Oconee Nuclear Station Unit 1.

An investigation is now underway to determine the cause of the failures and establish the bases for appropriate redesign and repairs.

Both Babcock & Wilcox and Duke Power Company are committing their full resources to this investigation and will keep your staff fully informed of the progress and plans.

Very truly yours, A. C. Thies m

/

  • 7 ACT:vr A

DOCKE E d

USAEC Enclosures h

APR7 197E }

RitVLATORY h Watt SECT 10A O

M b

eb 5912100 kh ph 3

-